This is PermitBase’s published record for Midvale as of 2026-07-19. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Midvale building permits

Verified

Midvale, Utah — as published 2026-07-19.

Verified 2026-07-04 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — current statewide edition per Utah Code § 15A-2-103(1)(a), effective July 1, 2026.2021 International Residential Code (IRC) — current statewide edition per Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update.2024 International Plumbing Code (IPC) — current statewide edition per Utah Code § 15A-2-103(1)(d), effective July 1, 2026.2024 International Mechanical Code (IMC) — current statewide edition per Utah Code § 15A-2-103(1)(e), effective July 1, 2026.2024 International Fuel Gas Code (IFGC) — current statewide edition per Utah Code § 15A-2-103(1)(f), effective July 1, 2026.2024 International Energy Conservation Code (IECC), covering both commercial and residential provisions in a single edition — current statewide edition per Utah Code § 15A-2-103(1)(h), effective July 1, 2026.2024 International Existing Building Code (IEBC) — current statewide edition per Utah Code § 15A-2-103(1)(i), effective July 1, 2026.2023 National Electrical Code (NEC) — current statewide edition per Utah Code § 15A-2-103(1)(g); unchanged by the July 1, 2026 statewide update.Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — current statewide edition per Utah Code § 15A-2-103(1)(n), effective July 1, 2026.Modular Building Institute Standards 1200 and 1205 — adopted statewide per Utah Code § 15A-2-103(1)(o); not separately itemized on Midvale's own published sources, but applies statewide.Midvale City is a compliance agency under Utah Code § 15A-1-202 and enforces these statewide codes through its own Building & Safety Division, per the Midvale Building & Safety FAQ (midvale.utah.gov), which references ICC standards, DOPL requirements, and Statewide Amendments to the State Construction Code.

Permit types & fees

Residential Building Permit

Verified

Required for new residential construction, additions, and structural alterations regulated by the adopted 2021 IRC or 2024 IBC. Midvale uses 'a single, universal building permit application that encompasses all building projects' per its Building & Safety FAQ, and requires online submission for all permits and inspections.

Verified 2026-07-04 · Source

Requirements

  • New single-family or multi-family residential construction
  • Additions or structural alterations to existing residential structures
  • A Building Permit is required for most construction in the city; exemptions apply only to detached accessory structures 200 sq ft or less (residential) or 120 sq ft or less (nonresidential) without utilities, and cosmetic work such as painting or carpet
  • Pre-construction meeting required on all new commercial buildings, apartments/townhouses, and twin homes; may be required on some remodels

Required documents

  • RequiredBuilding Permit Application (online)All building permit applications and inspection requests must be submitted online via the Midvale City building permit portal (forms.midvaleut.gov). Each document upload is limited to 4 MB; larger files must be emailed to Building & Safety.
  • RequiredResidential Construction Completion Checklist (2025 edition)Must be completed and signed by authorized personnel from City Engineer, Planning/Zoning, Finance/Utilities, SWMP, LTSWMP, Public Utilities, and Fire Inspection (for non single-family/town-home projects), then presented to the Building Inspector at final inspection before occupancy is allowed.
  • OptionalOwner Builder FormRequired if work is performed by the owner rather than a licensed contractor.
  • OptionalContractor Verification FormVerifies the licensed contractor performing the work, per Midvale City Building & Safety Document Center.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based$48 + $9.30 per $1,000 (or fraction thereof) for $0–$100,000 valuation; $978 for first $100,000 + $14 per additional $1,000 to $125,000; $1,328 for first $125,000 + $10.10 per additional $1,000 to $150,000; $1,580 for first $150,000 + $7 per additional $1,000 to $200,000; $1,930 for first $200,000 + $5.60 per additional $1,000 to $600,000; $4,170 for first $600,000 + $4.75 per additional $1,000 to $1,100,000; $6,545 for first $1,100,000 + $3.65 per additional $1,000 over that.Midvale City FY2026 Approved Fee Schedule (adopted per Ordinance 2026-O-14, May 20, 2026), 'Building Permit Fees' table.
Plan Check Fee65% of the Building Permit FeeMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Plan Check Fee — 65% of Building Fee.'
Electrical Fee (included with building permit for MEP)5% of the Building Permit FeeMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Electrical Fee — 5% of Building Fee.'
Mechanical Fee (included with building permit for MEP)5% of the Building Permit FeeMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Mechanical Fee — 5% of Building Fee.'
Plumbing Fee (included with building permit for MEP)5% of the Building Permit FeeMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Plumbing Fee — 5% of Building Fee.'
State Surcharge1% of the sum of the Building, Electrical, Mechanical, and Plumbing feesMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Surcharge — 1% of the sum of Building, Electrical, Mechanical, and Plumbing Fees.'
Pre-Plan Check Fee (credited toward building permit fee; non-refundable after plan review commences)$0 (<$100,000 valuation); $200 ($100,000–$300,000); $1,000 ($300,000–$500,000); $2,000 ($500,000–$1,000,000); $5,000 ($1,000,000–$10,000,000); $10,000 (>$10,000,000)Midvale City FY2026 Approved Fee Schedule, 'Pre-Plan Check Fees' table.

Residential Addition / Remodel Permit

Verified

Required for remodels, additions, and alterations to existing residential structures in Midvale. Charged as a valuation-based building permit under the same fee structure as new construction; the FY2026 Fee Schedule provides a dedicated Remodel Construction Completion Checklist.

Verified 2026-07-04 · Source

Requirements

  • Additions or enlargements to existing residential structures
  • Interior remodels involving structural, electrical, plumbing, or mechanical work
  • Work exceeding the exemption for detached accessory structures 200 sq ft or less (residential) without utilities, or cosmetic work such as painting or carpet, which does not require a permit

Required documents

  • RequiredBuilding Permit Application (online)Submit via forms.midvaleut.gov; uploads capped at 4 MB per file.
  • RequiredRemodel Construction Completion Checklist (2025 edition)Listed in the Midvale Building & Safety Document Center; required sign-off checklist for remodel projects analogous to the Residential Construction Completion Checklist.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-basedSame valuation-based schedule as new residential construction: $48 + $9.30 per $1,000 up to $100,000; increasing marginal rates through $6,545 for the first $1,100,000 + $3.65 per additional $1,000 above that.Midvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table.
Plan Check Fee65% of the Building Permit FeeMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table.
Electrical / Mechanical / Plumbing Fees (if applicable to remodel scope)5% of the Building Permit Fee eachMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table.
State Surcharge1% of the sum of Building, Electrical, Mechanical, and Plumbing FeesMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table.

Electrical Permit

Verified

Required for standalone electrical work in Midvale not covered under a residential building permit, including electrical service charges and panel work billed as an over-the-counter permit. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the Midvale FY2026 Fee Schedule does not publish an EV-specific line item, so a charger install is billed under the standard Service Charge (over-the-counter) or Electrical Fee category depending on scope.

Verified 2026-07-04 · Source

Requirements

  • Electrical service upgrades or panel changes (standalone, over-the-counter)
  • New electrical circuits or wiring not part of a new-construction building permit

Required documents

  • RequiredBuilding Permit Application (online)Submit via forms.midvaleut.gov.
  • OptionalContractor Verification FormRequired for licensed-contractor work, per the Midvale Building & Safety Document Center.

Fee schedule

Fee typeAmountNotes
Electrical Fee (part of a new building permit)5% of the Building Permit FeeMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Electrical Fee — 5% of Building Fee.'
Service Charge (over-the-counter permit)$47 electrical fee + $0.47 surchargeMidvale City FY2026 Approved Fee Schedule, 'Over the Counter Permit Fees' table: 'Service Charge — $47 electrical fee + 0.47 surcharge.'

Plumbing Permit

Verified

Required for plumbing work in Midvale, including standalone water heater replacement billed as an over-the-counter permit.

Verified 2026-07-04 · Source

Requirements

  • Water heater installation or replacement (standalone, over-the-counter)
  • New plumbing fixtures or line work not part of a new-construction building permit

Required documents

  • RequiredBuilding Permit Application (online)Submit via forms.midvaleut.gov.

Fee schedule

Fee typeAmountNotes
Plumbing Fee (part of a new building permit)5% of the Building Permit FeeMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Plumbing Fee — 5% of Building Fee.'
Water Heater (over-the-counter permit)$25 plumbing fee + $0.28 surchargeMidvale City FY2026 Approved Fee Schedule, 'Over the Counter Permit Fees' table: 'Water Heater — $25 plumbing fee + 0.28 surcharge.'

Mechanical / HVAC Permit

Verified

Required for furnace, air conditioning, and combined HVAC installation/replacement in Midvale. The FY2026 Fee Schedule lists dedicated over-the-counter rates for Furnace, A/C, and Furnace-and-A/C permits.

Verified 2026-07-04 · Source

Requirements

  • Furnace installation or replacement (standalone, over-the-counter)
  • Air conditioning installation or replacement (standalone, over-the-counter)
  • Combined furnace-and-A/C replacement

Required documents

  • RequiredBuilding Permit Application (online)Submit via forms.midvaleut.gov.

Fee schedule

Fee typeAmountNotes
Mechanical Fee (part of a new building permit)5% of the Building Permit FeeMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Mechanical Fee — 5% of Building Fee.'
Furnace (over-the-counter permit)$35 mechanical fee + $0.35 surchargeMidvale City FY2026 Approved Fee Schedule, 'Over the Counter Permit Fees' table: 'Furnace — $35 mechanical fee + 0.35 surcharge.'
A/C (over-the-counter permit)$35 mechanical fee + $0.35 surchargeMidvale City FY2026 Approved Fee Schedule, 'Over the Counter Permit Fees' table: 'A/C — $35 mechanical fee + 0.35 surcharge.'
Furnace and A/C combined (over-the-counter permit)$48 mechanical fee + $0.48 surchargeMidvale City FY2026 Approved Fee Schedule, 'Over the Counter Permit Fees' table: 'Furnace and A/C — $48 mechanical fee + 0.48 surcharge.'

Roofing / Reroof Permit

Verified

Required for reroofing in Midvale. Billed as an over-the-counter building permit fee, distinct from the valuation-based building permit used for full construction.

Verified 2026-07-04 · Source

Requirements

  • Complete reroof / reroofing work (permitted as an over-the-counter Demo/Building line item per the fee schedule's 'Demo' and general building-permit-fee entries)

Required documents

  • RequiredBuilding Permit Application (online)Submit via forms.midvaleut.gov; scope of work and square footage.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (over-the-counter, applies to reroof scope per Midvale's fee schedule structure)$47 building permit fee (Window entry in the 'Over the Counter Permit Fees' table shares this $47 building-permit-fee rate structure; the fee schedule does not list a distinct 'Reroof' line item)
Midvale City FY2026 Approved Fee Schedule, 'Over the Counter Permit Fees' table lists 'Window — $47 building permit fee' and 'Demo — $47 building permit fee' as the two named over-the-counter building-permit-fee items; Show full citation

Midvale City FY2026 Approved Fee Schedule, 'Over the Counter Permit Fees' table lists 'Window — $47 building permit fee' and 'Demo — $47 building permit fee' as the two named over-the-counter building-permit-fee items; no separate 'Reroof' or 'Roofing' line item appears in the fee schedule as fetched on 2026-07-04. Roofing work exceeding over-the-counter scope would default to the standard valuation-based Building Permit Fee table.

Solar PV Permit

Required for rooftop or ground-mounted solar photovoltaic installations, including battery storage, in Midvale. Midvale does not maintain its own municipal electric utility — Rocky Mountain Power is the electric provider serving Midvale (confirmed via the Midvale city website's power-outage reporting link, which routes to rockymountainpower.net). On 2026-07-19 re-verification, the dedicated Solar/KWA/Battery-Storage line items previously cited from the FY2026 Fee Schedule could not be re-located in that same document (fetched and text-extracted directly, 7 pages, zero matches for 'solar', 'KWA', 'photovoltaic', or 'battery'); the schedule's Last-Modified header (Jan 6, 2026) predates the original 2026-07-04 verification, so the figures were not removed after the fact — they could not be substantiated in the source at all. Fees below have been corrected to the schedule's actual valuation-based Building Permit Fee table, which is what a solar installation's building-permit valuation would be charged under absent a distinct solar line item.

Reviewed 2026-07-19 · Source

Requirements

  • Rooftop or ground-mounted solar PV system installation
  • Battery storage system installation

Required documents

  • RequiredBuilding Permit Application (online)Submit via forms.midvaleut.gov.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)$48 + $9.30 per $1,000 valuation (from $100,001-$125,000), scaling up per the standard valuation tableMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table. No separate solar-specific fee line item currently appears in this document (re-checked 2026-07-19); solar installations are billed off installed-system valuation like other building permits.
Plan Check Fee65% of Building FeeMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Plan Check Fee — 65% of Building Fee.'
Electrical Fee5% of Building FeeMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Electrical Fee — 5% of Building Fee.' Applies since a solar PV system involves electrical tie-in work.

Demolition Permit

Verified

Required for structure demolition in Midvale. Requires coordination across multiple departments and agencies: Midvale Utility Billing (utility 'kill letter'), Engineering (SWPPP checklist and Demolition Permit Stormwater Requirements approval), Building & Safety application, Salt Lake County Health Department pre-demolition inspection, Utah DEQ Division of Air Quality asbestos inspection/notification, and Utah DEQ Division of Water Quality UPDES general permit NOI if applicable.

Verified 2026-07-04 · Source

Requirements

  • Utility Billing: terminate water/sewer accounts and obtain a 'Demolition-Kill Letter' confirming a zero balance
  • Engineering: completed SWPPP Checklist and approved 'Demolition Permit – Stormwater Requirements Approval'
  • Building & Safety: completed Building Permit Application and payment
  • Salt Lake County Health Department: completed and approved 'Pre-demolition Building Inspection Form'
  • Utah DEQ Division of Air Quality: asbestos inspection from an approved asbestos inspector, completed 'Demolition Notification Form,' and 'Asbestos Renovation/Abatement Notification Form' if applicable
  • Utah DEQ Division of Water Quality: General Construction (Stormwater) UPDES 'General Permit' Notice of Intent, if applicable
  • Written confirmation (letter or email) that all utilities (Dominion Energy, Rocky Mountain Power, water, sewer providers) have been terminated

Required documents

  • RequiredDemolition Requirements packet (updated 3/14/2024)Lists every required approval and form: Demolition-Kill Letter, SWPPP Checklist, Demolition Permit Stormwater Requirements, Pre-demolition Building Inspection Form (Salt Lake County Health Dept.), DEQ Demolition Notification Form, DEQ Asbestos Renovation/Abatement Notification Form, and UPDES General Permit NOI.
  • RequiredDemolition-Kill LetterUtility Billing form confirming water/sewer/garbage service disposition (meter and garbage cans stay or are pulled) and zero account balance prior to demolition.
  • RequiredSWPPP ChecklistRequired for any construction site disturbing 1 acre or more or part of a common plan of development; submitted with the Stormwater Pollution Prevention Plan (SWPPP). Revised 3/14/2024.

Fee schedule

Fee typeAmountNotes
Building Permit Fee for Demolition (over-the-counter)$47 building permit feeMidvale City FY2026 Approved Fee Schedule, 'Over the Counter Permit Fees' table: 'Demo — $47 building permit fee.'

Commercial Building Permit

Verified

Required for new commercial building construction in Midvale, valuation-based per the FY2026 Approved Fee Schedule (Ordinance 2026-O-14, adopted May 20, 2026), using the same Building Permit Fees table applied to all building permits. A pre-construction meeting is required on all new commercial buildings, per the city's Building & Safety page.

Verified 2026-07-19 · Source

Requirements

  • New commercial building construction
  • Building Permit Application submitted online via forms.midvaleut.gov (document uploads limited to 4 MB each; larger files emailed to Building & Safety)
  • Pre-construction meeting required on all new commercial buildings
  • Commercial Construction Completion Checklist signed off before occupancy

Required documents

  • RequiredBuilding Permit Application (online)Submitted via forms.midvaleut.gov, per Midvale City Building & Safety Document Center.
  • RequiredCommercial Construction Completion ChecklistSign-off matrix required before occupancy: City Engineer, Planning Dept, Finance/Utility Billing, SWMP, LTSWMP, Public Utilities, Backflow Prevention, Digital As-Built Plans, Fire Inspection, South Valley Water Reclamation, Final Inspection Approval.
  • RequiredDigital As-Built Plans (GIS Shapefile)NAD 1983 State Plane Utah Central projection, per the Commercial Construction Completion Checklist.
  • OptionalOwner Builder FormRequired if work is performed by the owner rather than a licensed contractor.
  • OptionalContractor Verification FormVerifies the licensed contractor performing the work, per Midvale City Building & Safety Document Center.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based$48 + $9.30 per $1,000 (or fraction thereof) for $0–$100,000 valuation; $978 for first $100,000 + $14 per additional $1,000 to $125,000; $1,328 for first $125,000 + $10.10 per additional $1,000 to $150,000; $1,580 for first $150,000 + $7 per additional $1,000 to $200,000; $1,930 for first $200,000 + $5.60 per additional $1,000 to $600,000; $4,170 for first $600,000 + $4.75 per additional $1,000 to $1,100,000; $6,545 for first $1,100,000 + $3.65 per additional $1,000 over that.Midvale City FY2026 Approved Fee Schedule (adopted per Ordinance 2026-O-14, May 20, 2026), 'Building Permit Fees' table. Same table used for all building permits, including commercial.
Plan Check Fee65% of the Building Permit FeeMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Plan Check Fee — 65% of Building Fee.'
Electrical Fee (included with building permit for MEP)5% of the Building Permit FeeMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Electrical Fee — 5% of Building Fee.'
Mechanical Fee (included with building permit for MEP)5% of the Building Permit FeeMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Mechanical Fee — 5% of Building Fee.'
Plumbing Fee (included with building permit for MEP)5% of the Building Permit FeeMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Plumbing Fee — 5% of Building Fee.'
State Surcharge1% of the sum of the Building, Electrical, Mechanical, and Plumbing feesMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Surcharge — 1% of the sum of Building, Electrical, Mechanical, and Plumbing Fees.'
Pre-Plan Check Fee (credited toward building permit fee; non-refundable after plan review commences)$0 (<$100,000 valuation); $200 ($100,000–$300,000); $1,000 ($300,000–$500,000); $2,000 ($500,000–$1,000,000); $5,000 ($1,000,000–$10,000,000); $10,000 (>$10,000,000)Midvale City FY2026 Approved Fee Schedule, 'Pre-Plan Check Fees' table.

Commercial Tenant Improvement / Tenant Finish Permit

Required for commercial remodel and tenant-improvement work in Midvale, billed under the same valuation-based Building Permit Fees table as new commercial construction (Ordinance 2026-O-14). The city's Building & Safety page references a separate 'Remodel Construction Completion Checklist (Certificate of Occupancy)' for tenant-improvement/remodel closeout, but the linked PDF returned HTTP 404 on 2026-07-19 — the general Commercial Construction Completion Checklist requirements are used here as the closest verified equivalent. Confidence is 'partial' because that specific TI closeout checklist could not be directly verified.

Reviewed 2026-07-19 · Source

Requirements

  • Commercial remodel or tenant-improvement scope
  • Building Permit Application submitted online via forms.midvaleut.gov (document uploads limited to 4 MB each; larger files emailed to Building & Safety)
  • Pre-construction meeting may be required for some remodels, per the city's Building & Safety page

Required documents

  • RequiredBuilding Permit Application (online)Submitted via forms.midvaleut.gov, per Midvale City Building & Safety Document Center.
  • RequiredRemodel / Commercial Construction Completion ChecklistMidvale's Building & Safety page references a 'Remodel Construction Completion Checklist (Certificate of Occupancy)' distinct from the new-construction checklist, but the linked PDF returned HTTP 404 as of 2026-07-19 — sign-off items from the verified Commercial Construction Completion Checklist (City Engineer, Planning Dept, Finance/Utility Billing, Fire Inspection, Final Inspection Approval) are used as the closest confirmed equivalent.
  • OptionalOwner Builder FormRequired if work is performed by the owner rather than a licensed contractor.
  • OptionalContractor Verification FormVerifies the licensed contractor performing the work, per Midvale City Building & Safety Document Center.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based$48 + $9.30 per $1,000 (or fraction thereof) for $0–$100,000 valuation; $978 for first $100,000 + $14 per additional $1,000 to $125,000; $1,328 for first $125,000 + $10.10 per additional $1,000 to $150,000; $1,580 for first $150,000 + $7 per additional $1,000 to $200,000; $1,930 for first $200,000 + $5.60 per additional $1,000 to $600,000; $4,170 for first $600,000 + $4.75 per additional $1,000 to $1,100,000; $6,545 for first $1,100,000 + $3.65 per additional $1,000 over that.Midvale City FY2026 Approved Fee Schedule (adopted per Ordinance 2026-O-14, May 20, 2026), 'Building Permit Fees' table. Same table used for all building permits, including commercial.
Plan Check Fee65% of the Building Permit FeeMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Plan Check Fee — 65% of Building Fee.'
Electrical Fee (included with building permit for MEP)5% of the Building Permit FeeMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Electrical Fee — 5% of Building Fee.'
Mechanical Fee (included with building permit for MEP)5% of the Building Permit FeeMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Mechanical Fee — 5% of Building Fee.'
Plumbing Fee (included with building permit for MEP)5% of the Building Permit FeeMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Plumbing Fee — 5% of Building Fee.'
State Surcharge1% of the sum of the Building, Electrical, Mechanical, and Plumbing feesMidvale City FY2026 Approved Fee Schedule, 'Building Permit Fees' table: 'Surcharge — 1% of the sum of Building, Electrical, Mechanical, and Plumbing Fees.'
Pre-Plan Check Fee (credited toward building permit fee; non-refundable after plan review commences)$0 (<$100,000 valuation); $200 ($100,000–$300,000); $1,000 ($300,000–$500,000); $2,000 ($500,000–$1,000,000); $5,000 ($1,000,000–$10,000,000); $10,000 (>$10,000,000)Midvale City FY2026 Approved Fee Schedule, 'Pre-Plan Check Fees' table.

Sources & verification

Verified against official sources. Last reviewed 2026-07-04.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Midvale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-16)Later version (2026-07-20) →View current record →All versions →

Permalink: /utah/salt-lake-county/midvale/as-of/2026-07-19/

Snapshot date: 2026-07-19

Commit: 21c3ffb

Reproducible from PermitBase’s version-controlled dataset, commit 21c3ffb.