You are viewing the permanent link for the record currently in effect, published 2026-07-16.
Millcreek building permits
VerifiedMillcreek, Utah — as published 2026-07-16.
Verified 2026-06-30 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new residential construction, additions, structural alterations, and work requiring plan review in Millcreek. Governed by the 2021 International Residential Code (IRC) for residential construction and the 2024 International Building Code (IBC) for commercial construction, as adopted by Utah Code § 15A-2-103; the 2024 IBC superseded the 2021 IBC on July 1, 2026.
Verified 2026-06-30 · Source
Requirements
- New single-family, two-family, or townhome construction
- Residential additions or structural modifications
- Conversion of non-habitable space to habitable space
- Any work requiring plan review under Millcreek Municipal Code § 15-08-030
Required documents
- RequiredBuilding Permit Application (iWorQ portal)Submit via millcreekpermit.portal.iworq.net — include total project cost (market value of labor and materials) per MKC § 15-08-030.
- RequiredConstruction PlansComplete drawings to scale — site plan, floor plans, elevations, sections, structural details, and code analysis (applicable codes, use, square footage). Required per MKZ 19.02.080 and Millcreek 1,2-Family Dwelling and Townhome Requirements.
- RequiredEnergy Code ComplianceShow R-values of slab, walls, floors, and ceiling; window U-factors. Prescriptive requirements or REScheck to verify R-values and U-factors per Millcreek Required Inspections guide.
- RequiredContractor Information Sheet or Owner/Builder CertificationAvailable at millcreekut.gov/DocumentCenter/View/140/Owner-Builder-Certification-PDF or millcreekut.gov/DocumentCenter/View/376/Millcreek-Contractor-Information-PDF.
- OptionalMechanical Plans with Manual J/D/SLocation of furnace, supply/return duct layout, combustion air location; Manual J/D/S may be required to verify equipment sizing per Millcreek 1,2-Family Dwelling Requirements guide.
- OptionalStructural CalculationsSealed by a licensed Utah PE for projects requiring engineered design.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit — valuation up to $2,000 | $76.50 | Millcreek FY25 Consolidated Fee Schedule, Item 30, MKC § 15-08-030 (dated 8/12/2024) |
| Building Permit — valuation $2,001–$25,000 | $76.50 for the first $2,000, plus $16.50 for each additional $1,000 or fraction thereof, up to and including $25,000 | Millcreek FY25 Consolidated Fee Schedule, Item 31, MKC § 15-08-030 |
| Building Permit — valuation $25,001–$50,000 | $456 for the first $25,000, plus $12 for each additional $1,000 or fraction thereof, up to and including $50,000 | Millcreek FY25 Consolidated Fee Schedule, Item 32, MKC § 15-08-030 |
| Building Permit — valuation $50,001–$100,000 | $765 for the first $50,000, plus $8.50 for each additional $1,000 or fraction thereof, up to and including $100,000 | Millcreek FY25 Consolidated Fee Schedule, Item 33, MKC § 15-08-030 |
| Building Permit — valuation $100,001–$500,000 | $1,181 for the first $100,000, plus $6.50 for each additional $1,000 or fraction thereof, up to and including $500,000 | Millcreek FY25 Consolidated Fee Schedule, Item 34, MKC § 15-08-030 |
| Building Permit — valuation $500,001–$1,000,000 | $3,781 for the first $500,000, plus $5.50 for each additional $1,000 or fraction thereof, up to and including $1,000,000 | Millcreek FY25 Consolidated Fee Schedule, Item 35, MKC § 15-08-030 |
| Building Permit — valuation over $1,000,000 | $6,531 for the first $1,000,000, plus $4.50 for each additional $1,000 or fraction thereof | Millcreek FY25 Consolidated Fee Schedule, Item 36, MKC § 15-08-030 |
| Plan Review Fee (Residential) | 40% of building permit fee | Millcreek FY25 Consolidated Fee Schedule, Item 19, MKC § 15-08-030 |
| Plan Review Fee (Commercial / FCOZ) | 65% of building permit fee | Millcreek FY25 Consolidated Fee Schedule, Items 20–21, MKC § 15-08-030 |
| Re-Inspection Fee | $75 per occurrence | Millcreek FY25 Consolidated Fee Schedule, Item 23, MKC § 15-08-040 |
| State Surcharge | 1% of building permit fee | Millcreek FY25 Consolidated Fee Schedule, Item 29, MKC § 15-08-040 — applies to all permits |
Electrical Permit
VerifiedRequired for electrical work in Millcreek including new circuits, panel upgrades, service changes, and new construction wiring. Governed by the 2023 National Electrical Code (NEC) statewide per Utah Code § 15A-2-103(1)(g). EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the Millcreek FY25 Consolidated Fee Schedule does not publish an EV-specific line item, so a charger install is billed under the standard Electrical Permit Base Fee.
Verified 2026-07-20 · Source
Requirements
- New electrical circuits or wiring installations
- Electrical panel upgrades or replacements
- Service entrance changes
- Adding or relocating outlets, switches, or fixtures
- Generator or solar panel electrical connections
Required documents
- RequiredBuilding Permit Application (iWorQ portal)Submit via millcreekpermit.portal.iworq.net.
- OptionalElectrical Single-Line DiagramRequired for service upgrades and new construction — panel schedule, circuit layout, and load calculations per NEC Article 220.
- OptionalContractor LicenseValid Utah electrical contractor license (Utah DOPL) for work not performed by the homeowner/owner-builder.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Base Fee | $70 | Millcreek FY25 Consolidated Fee Schedule, Item 3, MKC § 15-16-020 (dated 8/12/2024). Covers circuit, electrical service charge, power to panel, temporary panel. |
| Additional Appliance or Fixture | $20 per additional item | Millcreek FY25 Consolidated Fee Schedule, Item 4, MKC § 15-16-020 |
| Re-Inspection Fee | $75 per occurrence | Millcreek FY25 Consolidated Fee Schedule, Item 23, MKC § 15-08-040 |
| State Surcharge | 1% of permit fee | Millcreek FY25 Consolidated Fee Schedule, Item 29, MKC § 15-08-040 |
Plumbing Permit
VerifiedRequired for plumbing installations, alterations, and repairs in Millcreek including water heaters, re-pipes, and fixture additions. Governed by the 2024 International Plumbing Code (IPC) as adopted by Utah Code § 15A-2-103, effective July 1, 2026 (superseded the 2021 edition).
Verified 2026-06-30 · Source
Requirements
- New plumbing fixture installations (sinks, toilets, showers)
- Water heater installation or replacement
- Water line or sewer line replacement or extension
- Gas line installation or modification
- Backflow prevention device installation
Required documents
- RequiredBuilding Permit Application (iWorQ portal)Submit via millcreekpermit.portal.iworq.net.
- OptionalPlumbing PlanLocation of water heater, all plumbing fixtures, shut-off valves, and floor drains; gas line diagram. Required per Millcreek 1,2-Family Dwelling Requirements guide.
- OptionalGas Line DiagramRequired when gas line work is involved — verify sizing. See Millcreek Gas Line Schematic Example at millcreekut.gov/DocumentCenter/View/2357/Gas-Line-Schematic-Example.
- OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) for work not performed by homeowner/owner-builder.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit Base Fee | $70 | Millcreek FY25 Consolidated Fee Schedule, Item 3, MKC § 15-16-020 (dated 8/12/2024). Covers water heater, re-pipe, and similar plumbing scopes. |
| Additional Appliance or Fixture | $20 per additional item | Millcreek FY25 Consolidated Fee Schedule, Item 4, MKC § 15-16-020 |
| Re-Inspection Fee | $75 per occurrence | Millcreek FY25 Consolidated Fee Schedule, Item 23, MKC § 15-08-040 |
| State Surcharge | 1% of permit fee | Millcreek FY25 Consolidated Fee Schedule, Item 29, MKC § 15-08-040 |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in Millcreek. Governed by the 2024 International Mechanical Code (IMC) as adopted by Utah Code § 15A-2-103, effective July 1, 2026 (superseded the 2021 edition).
Verified 2026-06-30 · Source
Requirements
- Furnace or boiler installation or replacement
- Air conditioning system installation or replacement
- Ductwork installation or major modification
- Evaporative cooler installation
- Fireplace or gas appliance installation (may also trigger gas line inspection)
Required documents
- RequiredBuilding Permit Application (iWorQ portal)Submit via millcreekpermit.portal.iworq.net.
- OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, heat pump, or evaporative cooler.
- OptionalMechanical Plans with Manual J/D/SLocation of furnace, supply/return duct layout, combustion air location. Manual J/D/S may be required to verify equipment sizing per Millcreek Required Inspections guide.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit Base Fee | $70 | Millcreek FY25 Consolidated Fee Schedule, Item 3, MKC § 15-16-020 (dated 8/12/2024). Covers furnace/AC, ductwork. |
| Additional Appliance | $20 per additional item | Millcreek FY25 Consolidated Fee Schedule, Item 4, MKC § 15-16-020 |
| Re-Inspection Fee | $75 per occurrence | Millcreek FY25 Consolidated Fee Schedule, Item 23, MKC § 15-08-040 |
| State Surcharge | 1% of permit fee | Millcreek FY25 Consolidated Fee Schedule, Item 29, MKC § 15-08-040 |
Roofing Permit
VerifiedRequired for residential roof replacement (re-roof) in Millcreek. The FY25 fee schedule lists a flat $70 residential re-roof fee, distinct from the standard ICC valuation-based building permit fee.
Verified 2026-06-30 · Source
Requirements
- Complete roof replacement (tear-off and re-roof)
- Overlay of new roofing over existing (where allowed by the 2021 IRC)
- Structural roof repairs or modifications
Required documents
- RequiredBuilding Permit Application (iWorQ portal)Submit via millcreekpermit.portal.iworq.net — include total project cost.
- OptionalContractor LicenseValid Utah roofing/contractor license (Utah DOPL) for work not performed by the homeowner.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Re-Roof Permit | $70 | Millcreek FY25 Consolidated Fee Schedule, Item 11 (Re-roof, Residential), MKC § 15-08-030 (dated 8/12/2024) |
| Commercial Re-Roof — $1–$9,999 | $150 | Millcreek FY25 Consolidated Fee Schedule, Item 12, MKC § 15-08-030 |
| Commercial Re-Roof — $10,000–$49,999 | $300 | Millcreek FY25 Consolidated Fee Schedule, Item 13, MKC § 15-08-030 |
| Commercial Re-Roof — $50,000 and up | $500 | Millcreek FY25 Consolidated Fee Schedule, Item 14, MKC § 15-08-030 |
| Re-Inspection Fee | $75 per occurrence | Millcreek FY25 Consolidated Fee Schedule, Item 23, MKC § 15-08-040 |
| State Surcharge | 1% of permit fee | Millcreek FY25 Consolidated Fee Schedule, Item 29, MKC § 15-08-040 |
Solar Panel Permit
VerifiedRequired for installation of rooftop or ground-mounted solar photovoltaic (PV) systems in Millcreek. The FY25 fee schedule lists a flat $70 base permit fee plus a $30 per-kW fee and a $100 plan review fee. The 2021 IRC and 2023 NEC govern the installation.
Verified 2026-07-19 · Source
Requirements
- Rooftop solar panel installation
- Ground-mounted solar array installation
- Battery storage system installation
- Electrical service upgrade for solar interconnection
Required documents
- RequiredBuilding Permit Application (iWorQ portal)Submit via millcreekpermit.portal.iworq.net — note total project cost.
- RequiredSolar Site Plan / Roof PlanScaled site plan noting setbacks from roof ridge and eave (fire setbacks), direction of north, utility locations. Scale of 1"=10' is typical. Required per Millcreek Rooftop Solar PV Requirements guide.
- RequiredElectrical One-Line DiagramDetailed one-line diagram showing PV system type, number and layout of modules, all wire types and sizes, conduit types and sizes, grounding wiring, locations of all circuits and components, and ratings of all fuses or breakers. Required per Millcreek Rooftop Solar PV Requirements guide.
- RequiredMounting System / Structural ApprovalDetailed mounting system information, module weight, support manufacturer specs for local wind and snow loads. Letter from a structural engineer approving the new PV system on the existing roof. Required per Millcreek Rooftop Solar PV Requirements guide.
- RequiredModule and Inverter Specification SheetsPV module spec sheets (STC rated Pmp, Vmp, Imp, Voc, Isc; UL 1703 listed). Inverter spec sheets (watts, volts, max AC output amps; UL 1741 listed for utility-tied inverters). Required per Millcreek Rooftop Solar PV Requirements guide.
- OptionalInterconnection AgreementUtility approval for grid-tied systems (Rocky Mountain Power).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Base Solar Permit | $70 | Millcreek FY25 Consolidated Fee Schedule, Item 8 (Base Solar Permit, charged with KWA fee), MKC § 15-08-030 (dated 8/12/2024) |
| KWA Fee (per kW, in addition to base permit) | $30 per kW | Millcreek FY25 Consolidated Fee Schedule, Item 9, MKC § 15-08-030 |
| Plan Review Fee (Solar) | $100 flat | Millcreek FY25 Consolidated Fee Schedule, Item 10, MKC § 15-08-030 |
| Re-Inspection Fee | $75 per occurrence | Millcreek FY25 Consolidated Fee Schedule, Item 23, MKC § 15-08-040 |
| State Surcharge | 1% of permit fee | Millcreek FY25 Consolidated Fee Schedule, Item 29, MKC § 15-08-040 |
Water Heater Permit
VerifiedRequired for water heater installation, replacement, or conversion (tank to tankless) in Millcreek. Processed as a plumbing permit under MKC § 15-16-020. The FY25 fee schedule explicitly lists 'Water Heater' as a covered MEP item under the $70 base fee.
Verified 2026-06-30 · Source
Requirements
- Water heater replacement (including like-for-like swaps)
- New water heater installation
- Conversion from tank to tankless water heater
- Gas line modification for water heater
Required documents
- RequiredBuilding Permit Application (iWorQ portal)Submit via millcreekpermit.portal.iworq.net.
- OptionalGas Line DiagramRequired if gas line work is involved. See Millcreek Gas Line Schematic Example at millcreekut.gov/DocumentCenter/View/2357/Gas-Line-Schematic-Example.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit Base Fee (covers water heater) | $70 | Millcreek FY25 Consolidated Fee Schedule, Item 3, MKC § 15-16-020 (dated 8/12/2024). Fee schedule explicitly lists 'Water Heater' as one of the MEP permit types covered by the $70 base fee. |
| Additional Appliance (e.g., second water heater) | $20 per additional item | Millcreek FY25 Consolidated Fee Schedule, Item 4, MKC § 15-16-020 |
| Re-Inspection Fee | $75 per occurrence | Millcreek FY25 Consolidated Fee Schedule, Item 23, MKC § 15-08-040 |
| State Surcharge | 1% of permit fee | Millcreek FY25 Consolidated Fee Schedule, Item 29, MKC § 15-08-040 |
Demolition Permit
VerifiedRequired for partial or complete demolition of structures in Millcreek. Permit fee is valuation-based using the ICC Building Valuation Data. DEQ asbestos and lead paint requirements apply per Utah DEQ and federal NESHAP regulations.
Verified 2026-07-01 · Source
Requirements
- Complete demolition of any structure
- Partial demolition involving structural elements
- Demolition of structures with potential asbestos or lead paint
Required documents
- RequiredDemolition Permit Application (iWorQ portal)Submit via millcreekpermit.portal.iworq.net. See Millcreek Demolition Permit Requirements checklist at millcreekut.gov/DocumentCenter/View/2362/Demolition-Permit-Requirements.
- RequiredUtility Disconnect ConfirmationGas, electric, water, and sewer must be disconnected prior to demolition.
- OptionalAsbestos / Hazardous Materials ComplianceFederal NESHAP asbestos inspection may be required before demolition of applicable structures. See Utah DEQ Asbestos Program (deq.utah.gov/air-quality/atlas-air-toxics-lead-and-asbestos-section/asbestos-program) and DEQ Lead Based Paint Program linked from Millcreek's building services page.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit | Based on ICC Building Valuation Data (same valuation table as building permit — Items 30–36 of FY25 fee schedule: $76.50 minimum up to $2,000 valuation) | Millcreek FY25 Consolidated Fee Schedule, Item 2, MKC § 15-08-030 (dated 8/12/2024) — PDF confirms verbatim: "Demolition Permit ... 15-08-030 ... Based on current ICC Valuation Table," the identical valuation-based fee structure as the Building Permit (Item 1). Grounded/verified per valuation-based-fee rule. |
| Re-Inspection Fee | $75 per occurrence | Millcreek FY25 Consolidated Fee Schedule, Item 23, MKC § 15-08-040 |
| State Surcharge | 1% of permit fee | Millcreek FY25 Consolidated Fee Schedule, Item 29, MKC § 15-08-040 |
Window and Door Replacement Permit
VerifiedRequired for replacement of windows and doors (residential, replacement only with no other structural work) in Millcreek. The FY25 fee schedule lists a flat $70 residential window/door replacement-only fee.
Verified 2026-06-30 · Source
Requirements
- Replacement of existing windows or doors in the same opening (residential, no other structural work)
Required documents
- RequiredBuilding Permit Application (iWorQ portal)Submit via millcreekpermit.portal.iworq.net.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Window and Door Permit (Residential — replacement only, no other work) | $70 | Millcreek FY25 Consolidated Fee Schedule, Item 15, MKC § 15-08-030 (dated 8/12/2024) |
| Window and Door Permit (Commercial) | Based on ICC valuation table | Millcreek FY25 Consolidated Fee Schedule, Item 16, MKC § 15-08-030 |
| Re-Inspection Fee | $75 per occurrence | Millcreek FY25 Consolidated Fee Schedule, Item 23, MKC § 15-08-040 |
| State Surcharge | 1% of permit fee | Millcreek FY25 Consolidated Fee Schedule, Item 29, MKC § 15-08-040 |
Commercial Building Permit
VerifiedRequired for new commercial construction in Millcreek, regulated by the 2024 International Building Code (current statewide as of July 1, 2026, per Utah Code § 15A-2-103(1)(a)). Millcreek's own Building Department page carries a banner stating 'Any Commercial project submitted on or after July 1st will need to be designed to these standards' — the 2024 I-Codes. Fees use the same ICC-valuation-based Building Permit table as residential construction (Millcreek FY25 Consolidated Fee Schedule, Item 1, MKC § 15-08-030), with plan review billed at the Commercial rate of 65% of the building permit fee (Item 20) rather than the 40% residential rate (Item 19).
Verified 2026-07-19 · Source
Requirements
- New commercial construction regulated by the 2024 IBC (current statewide 2026-07-01) — Millcreek's own Building Department page banner states any commercial project submitted on or after July 1, 2026 must be designed to the 2024 I-Codes with State Amendments
- Architect and engineer required — per Millcreek's official 'New Commercial Building Permit Requirements' guide
- Code/design analysis: applicable building codes, occupancy type, construction type, fire sprinkler and alarm requirements, design occupant load, restroom/fixture count, floor area, egress design
- Site plan and elevations per MKZ § 19.02.080, including public improvements (sidewalk, curb, and gutter along the frontage, per Millcreek Standard Plans 140 and 145)
- Applied for via the iWorQ permit portal (millcreekpermit.portal.iworq.net)
Required documents
- RequiredBuilding Permit Application (iWorQ portal)Submit via millcreekpermit.portal.iworq.net — include total project cost (market value of labor and materials) per MKC § 15-08-030.
- RequiredNew Commercial Building Permit Requirements ChecklistCity-published guide covering site plan (setbacks, storm drainage, liquefaction/floodplain review), building plans (code/design analysis, structural plans, ADA details, wall sections), structural calculations (engineer-stamped, wind/seismic design criteria), electrical/mechanical/plumbing plans, and public improvements (sidewalk, curb, and gutter per Millcreek Standard Plans 140/145). Sourced from millcreekut.gov 'New Commercial Building Permit Requirements' (DocumentCenter/View/2363), fetched 2026-07-19.
- RequiredStructural CalculationsSealed by a licensed Utah PE, showing all applicable design loads and calculations, per the New Commercial Building Permit Requirements checklist.
- RequiredEnergy Code Compliance (COMcheck)Site-specific envelope and lighting COMcheck, per the New Commercial Building Permit Requirements checklist.
- OptionalGeotechnical ReportSoil report and slope stability evaluation, required where applicable per the Engineering Department section of the New Commercial Building Permit Requirements checklist.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit — valuation up to $2,000 | $76.50 | Millcreek FY25 Consolidated Fee Schedule, Item 1 (Building Permit) and Item 30, MKC § 15-08-030 (dated 8/12/2024). This is the same ICC-valuation-based table used for the Residential Building Permit — the fee schedule's Item 1 'Building Permit' line applies regardless of occupancy type. |
| Building Permit — valuation $2,001–$25,000 | $76.50 for the first $2,000, plus $16.50 for each additional $1,000 or fraction thereof, up to and including $25,000 | Millcreek FY25 Consolidated Fee Schedule, Item 31, MKC § 15-08-030 |
| Building Permit — valuation $25,001–$50,000 | $456 for the first $25,000, plus $12 for each additional $1,000 or fraction thereof, up to and including $50,000 | Millcreek FY25 Consolidated Fee Schedule, Item 32, MKC § 15-08-030 |
| Building Permit — valuation $100,001–$500,000 | $1,181 for the first $100,000, plus $6.50 for each additional $1,000 or fraction thereof, up to and including $500,000 | Millcreek FY25 Consolidated Fee Schedule, Item 34, MKC § 15-08-030 |
| Building Permit — valuation over $1,000,000 | $6,531 for the first $1,000,000, plus $4.50 for each additional $1,000 or fraction thereof | Millcreek FY25 Consolidated Fee Schedule, Item 36, MKC § 15-08-030 |
| Plan Review Fee (Commercial / FCOZ) | 65% of building permit fee | Millcreek FY25 Consolidated Fee Schedule, Item 20, MKC § 15-08-030 — distinct from the 40% Residential rate (Item 19). |
| Re-Inspection Fee | $75 per occurrence | Millcreek FY25 Consolidated Fee Schedule, Item 23, MKC § 15-08-040 |
| State Surcharge | 1% of building permit fee | Millcreek FY25 Consolidated Fee Schedule, Item 29, MKC § 15-08-040 — applies to all permits |
Commercial Tenant Improvement / Tenant Finish Permit
VerifiedMillcreek terms this permit type 'Commercial Alteration' in its own published requirements guide. Required for tenant finish, remodel, and alteration work in existing commercial buildings, regulated by the 2024 IBC (current statewide 2026-07-01) and reviewed under the International Existing Building Code (IEBC) 'Level of Alteration' compliance method. Fees use the same ICC-valuation-based Building Permit table as new commercial construction, billed at the Commercial plan review rate of 65% (MKC § 15-08-030, Item 20).
Verified 2026-07-19 · Source
Requirements
- Commercial alteration / tenant improvement work regulated by the 2024 IBC and reviewed under the IEBC compliance method for remodeling existing buildings (Level of Alteration), per Millcreek's official Commercial Alteration Building Permit Requirements checklist
- Spaces over 3,000 sq ft, or any project changing structural elements, require a Utah-registered design professional's stamp, per the checklist
- Certain commercial uses require Salt Lake County Health Department approval (e.g. food service), per the checklist
- Applied for via the iWorQ permit portal (millcreekpermit.portal.iworq.net)
Required documents
- RequiredBuilding Permit Application (iWorQ portal)Submit via millcreekpermit.portal.iworq.net.
- RequiredCommercial Alteration Building Permit Requirements ChecklistCity-published guide covering code/design analysis (including IEBC Level of Alteration compliance method), contractor information, proposed floor plans (egress, ADA accessibility, reflected ceiling plan), energy code compliance (site-specific COMcheck), structural plans/calculations (engineer-stamped), mechanical/electrical/plumbing plans (including grease interceptor sizing for food service), and fire sprinkler/alarm plans routed to Unified Fire Authority for approval before installation. Sourced from millcreekut.gov 'Commercial Alteration Requirements' (DocumentCenter/View/2361), fetched 2026-07-19.
- OptionalArchitect/Engineer Stamp (spaces over 3,000 sq ft or structural changes)Required per Utah Title 58, per the Commercial Alteration Building Permit Requirements checklist.
- OptionalFire Sprinkler and Alarm PlansMust be submitted to Unified Fire Authority for approval before installation, per the checklist.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit — valuation up to $2,000 | $76.50 | Millcreek FY25 Consolidated Fee Schedule, Item 1 (Building Permit) and Item 30, MKC § 15-08-030. Millcreek does not publish a separate commercial-alteration/tenant-improvement fee tier — the same ICC-valuation-based Building Permit table applies as new commercial construction and residential permits. |
| Building Permit — valuation $2,001–$25,000 | $76.50 for the first $2,000, plus $16.50 for each additional $1,000 or fraction thereof, up to and including $25,000 | Millcreek FY25 Consolidated Fee Schedule, Item 31, MKC § 15-08-030 |
| Plan Review Fee (Commercial / FCOZ) | 65% of building permit fee | Millcreek FY25 Consolidated Fee Schedule, Item 20, MKC § 15-08-030 |
| Re-Inspection Fee | $75 per occurrence | Millcreek FY25 Consolidated Fee Schedule, Item 23, MKC § 15-08-040 |
| State Surcharge | 1% of building permit fee | Millcreek FY25 Consolidated Fee Schedule, Item 29, MKC § 15-08-040 |
Sign Permit
VerifiedRequired in Millcreek for new or altered signage. The Consolidated Fee Schedule separately lists a $500.00 Site Plan Review fee for Permitted Uses and Signs alongside the $110.00 sign permit fee, suggesting a site-plan-review step may apply in some cases; the flat fee is set by the city's Consolidated Fee Schedule.
Verified 2026-07-20 · Source
Requirements
- New sign installation or alteration requiring Planning & Zoning approval before the sign permit is issued
- Site Plan Review is separately required for permitted uses and signs under Millcreek City Code 19-02-130
Required documents
- RequiredSign Permit ApplicationSubmit after obtaining prior Planning & Zoning approval; contact Planner@millcreekut.gov with questions
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit | $110.00 | Millcreek Consolidated Fee Schedule (Ordinance No. 24-37), item #129, code reference 19-02-130. This is the flat fee listed in the fee table; it is separate from the $500.00 'Site Plan Review for Permitted Uses and Signs' fee (item #124, same code section) that applies when a full site plan review is triggered. |
EV Charger / EVSE Permit
VerifiedMillcreek does not publish a distinct EV-charger fee line item. Per the Millcreek FY25 Consolidated Fee Schedule (Millcreek Municipal Code § 15-16-020), installing an EV charger (EVSE) is electrical work billed under the city's general Electrical Permit Base Fee.
Verified 2026-07-20 · Source
Requirements
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
- New dedicated circuit and/or panel/service capacity to serve the charger
- Compliance with the 2023 NEC, adopted statewide by Utah Code § 15A-2-103(1)(g)
Required documents
- RequiredBuilding Permit Application (iWorQ portal)Submit via millcreekpermit.portal.iworq.net.
- OptionalElectrical Single-Line DiagramRequired if the installation involves a panel or service upgrade — panel schedule, circuit layout, and load calculations per NEC Article 220.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Base Fee | $70 | Millcreek FY25 Consolidated Fee Schedule, Item 3, MKC § 15-16-020 (dated 8/12/2024). Covers circuit, electrical service charge, power to panel, temporary panel — the category an EV charger install is billed under. |
| Additional Appliance or Fixture | $20 per additional item | Millcreek FY25 Consolidated Fee Schedule, Item 4, MKC § 15-16-020. Applies to installing more than one charger/circuit in the same permit. |
| State Surcharge | 1% of permit fee | Millcreek FY25 Consolidated Fee Schedule, Item 29, MKC § 15-08-040 |
Fire Sprinkler System Permit
Millcreek is served by the Unified Fire Authority (UFA), which acts as the fire code official under International Fire Code (IFC) Sections 104.7.2 and 105.1.1 and issues its own permit for installation or modification of automatic fire sprinkler systems — this permit is issued and administered entirely by UFA, not by the Millcreek Building Department. Plans generally require an independent third-party peer review before UFA's final review and permitting. Neither Millcreek's own FY25 Consolidated Fee Schedule nor UFA's own published Fee Schedule 2025 lists a specific dollar fee for this permit type (both checked in full); when a sprinkler system is installed as part of new construction or a tenant improvement, Millcreek's separate valuation-based Building Permit fee (see the Commercial Building Permit and Commercial Tenant Improvement / Alteration Permit entries) still applies to the overall project.
Reviewed 2026-07-21 · Source
Requirements
- Installation or modification of an automatic fire protection (sprinkler) system, including new construction, tenant improvement, and standalone retrofit projects
- Design via the most recent version of NFPA 13, NFPA 13-R, or NFPA 13-D adopted by the State of Utah, per UFA's Automatic Fire Sprinkler System Submittal guide
- System designer must be NICET Level III or better (Water-Based Fire Protection Systems Layout), a Fire Protection Engineer, or a licensed engineer with specific additional fire protection system training
- Any change to a system's hazard classification design requires a new permit and new third-party plan review
- Systems with 20 or more sprinkler heads (with limited 13-D/13-R exceptions) require off-site/remote monitoring by an approved monitoring company
Required documents
- RequiredThird-Party Peer Review ReportRequired in compliance with IFC Section 104.7.2/104.8.2 for installation or modification of an automatic fire protection system. Exempt for installation or relocation of fewer than 20 sprinkler heads. Must be performed by a UFA-approved reviewer (list published on UFA's Plan Reviews page); the approved reviewer may not review its own firm's plans.
- RequiredWorking Plans, Manufacturer Cut Sheets, and Hydraulic CalculationsWorking plans drawn to scale, one per floor, with manufacturer cut sheets and hydraulic calculations, designer's NICET certification number/signature or engineer stamp/signature. Per UFA's Automatic Fire Sprinkler System Submittal guide.
- RequiredUFA Plan SubmittalAfter peer-review corrections are made, plans are submitted to ufaplansubmittal@unifiedfire.org for UFA's final review and permit issuance.
- OptionalMaterial and Test Certificate — Aboveground/Underground PipingUFA-published completion forms documenting hydrostatic/flush testing of piping prior to final acceptance.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| UFA Fire Sprinkler System Permit / Plan Review Fee | Not published | Exhaustively checked both potential fee-charging authorities' official documents in full: Millcreek's FY25 Consolidated Fee Schedule (317 line items, MKC §§ 15-08-030/15-16-020/19-02-130 etc., dated 8/12/2024) contains no fire sprinkler line item, and UFA's own 'UFA Fee Schedule 2025' PDF (unifiedfireut.gov/wp-content/uploads/UFA-Fee-Schedule-2025.pdf) covers only hazmat/operational annual permits, community events, medical training, records, and special enforcement — no fire sprinkler system installation or plan-review fee is listed. Confirm current pricing directly with UFA Fire Prevention at (801) 743-7200. |
| Third-Party Peer Review Fee | Market rate (varies by reviewer) | Paid directly to the UFA-approved third-party design professional selected by the applicant; this is a private consulting fee, not a government fee, and is not set or published by UFA. |
| Underlying Building/Alteration Permit (if tied to new construction or tenant improvement) | See Commercial Building Permit / Commercial Tenant Improvement Permit entries | Millcreek's Commercial Alteration Requirements checklist confirms fire sprinkler plans for a tenant improvement are 'routed to Unified Fire Authority for approval before installation' as an added step within the Building Department's own permit — the valuation-based Building Permit fee still applies to the overall project. |
Fire Alarm System Permit
Millcreek is served by the Unified Fire Authority (UFA), which acts as the fire code official under International Fire Code (IFC) Sections 104.7.2 and 105.1.1. Per UFA's own Fire Alarm and Detection System Submittal guide, 'All new commercial fire alarm system installations and existing system additions or modifications require a plan submittal and permit from UFA' — this permit is issued and administered entirely by UFA, not by the Millcreek Building Department. Neither Millcreek's own FY25 Consolidated Fee Schedule nor UFA's own published Fee Schedule 2025 lists a specific dollar fee for this permit type (both checked in full); when a fire alarm system is installed as part of new construction or a tenant improvement, Millcreek's separate valuation-based Building Permit fee (see the Commercial Building Permit and Commercial Tenant Improvement / Alteration Permit entries) still applies to the overall project.
Reviewed 2026-07-21 · Source
Requirements
- All new commercial fire alarm system installations and existing system additions or modifications require a plan submittal and permit from UFA
- Design and installation via the most recent version of NFPA 72 adopted by the State of Utah
- System designer must be NICET Level III or better (Engineering Technician), a Fire Protection Engineer, or a licensed engineer with specific additional fire protection system training
- Any structure (except one- and two-family dwellings) with 20 or more fire sprinkler heads installed must also have off-site alarm monitoring
Required documents
- RequiredThird-Party Peer Review ReportRequired where more than 5 horn/strobe notification appliances are added or relocated, per UFA's Fire Alarm and Detection System Submittal guide and IFC Section 104.7.2/104.8.2. Corrections from the third-party review must be made before submittal to UFA.
- RequiredWorking Plans, Manufacturer Cut Sheets, and Battery CalculationsPlans drawn to scale, one per floor, showing proposed use of each room, horn/strobe candela settings, and battery calculations; designer's NICET certification number/signature or engineer stamp/signature.
- RequiredUFA Plan SubmittalAfter peer-review corrections are made, plans are submitted to UFA for final review and permit issuance.
- OptionalRecord of Completion — Fire Alarm SystemUFA-published completion form documenting final system testing and acceptance.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| UFA Fire Alarm System Permit / Plan Review Fee | Not published | Exhaustively checked both potential fee-charging authorities' official documents in full: Millcreek's FY25 Consolidated Fee Schedule (317 line items, dated 8/12/2024) contains no fire alarm line item, and UFA's own 'UFA Fee Schedule 2025' PDF (unifiedfireut.gov/wp-content/uploads/UFA-Fee-Schedule-2025.pdf) covers only hazmat/operational annual permits, community events, medical training, records, and special enforcement — no fire alarm system installation or plan-review fee is listed. Confirm current pricing directly with UFA Fire Prevention at (801) 743-7200. |
| Third-Party Peer Review Fee | Market rate (varies by reviewer) | Paid directly to the UFA-approved third-party design professional selected by the applicant (required for 5+ horn/strobe additions/relocations); this is a private consulting fee, not a government fee, and is not set or published by UFA. |
| Underlying Building/Alteration Permit (if tied to new construction or tenant improvement) | See Commercial Building Permit / Commercial Tenant Improvement Permit entries | Millcreek's Commercial Alteration Requirements checklist confirms fire alarm plans for a tenant improvement are 'routed to Unified Fire Authority for approval before installation' as an added step within the Building Department's own permit — the valuation-based Building Permit fee still applies to the overall project. |
Change of Use Permit
VerifiedRequired when a developed property in Millcreek changes from one zoning use classification to another under Millcreek Zoning Code (MKZ) Title 18. Millcreek runs two tiers: an administrative Change of Use Permit (MKZ 18.15.030(C)), decided by the Planning Director with no public hearing, for use changes where the new use is itself a permitted use in that zone; and a Conditional Use Permit (MKZ 18.15.030(A)), decided by the Planning Commission after a public hearing, when the new use is classified in that zone as a conditional use rather than a permitted use. The Millcreek Consolidated Fee Schedule (dated 8/12/2024, predating the City's April 28, 2025 Title 18 recodification) lists these fees under their prior code citations as 'Tenant Change' (19-02-130, $110.00, staff-level) and 'Conditional Use – Change of Use and No New Development' (19-84-030, $1,200.00, Planning Commission-level, includes site plan review).
Verified 2026-07-21 · Source
Requirements
- Administrative tier: required whenever an existing developed property changes from one use classification established in MKZ Title 18 to another use classification also established in that Title, where the new use is a permitted use in the applicable zone (MKZ 18.15.030(C)(2))
- Heavier tier: a Conditional Use Permit is required instead, per MKZ 18.15.030(C)(1), when the new use classification is established in Title 18 as a conditional use rather than a permitted use — this follows the Conditional Use Permit procedure at MKZ 18.15.030(A), including a Planning Commission public hearing, and (where there is property development, redevelopment, construction, reconstruction, or alteration of a building/structure) a Site Plan Approval under MKZ 18.15.030(B)
- The new use must be permitted (or approved as conditional) in the governing zoning district and comply with all applicable development standards — landscaping, parking and mobility standards, minimum driveway/roadway widths, and any dedication or public improvement requirements (MKZ 18.15.030(C)(4))
Required documents
- RequiredMillcreek Land Use ApplicationCompleted and signed application form, per the Change of Use Application Checklist (millcreekut.gov/DocumentCenter/View/5475/Change-of-Use-Checklist).
- RequiredChange of Use Permit ChecklistCity-published checklist for the administrative tier (MKZ 18.15.030(C)(5)) covering summary requirements, property survey requirements, site plan requirements, and required studies.
- RequiredNotarized Property Owner AffidavitRequired per the Change of Use Application Checklist.
- RequiredLetter of IntentDescribing the proposed change of use, per the Change of Use Application Checklist.
- RequiredProperty SurveyShowing, at minimum, property boundaries, topography (existing/proposed elevations, contours), easements/encroachments, existing rights-of-way, existing buildings/structures/utilities, trees of 4-inch caliper or greater, and any sensitive lands features.
- RequiredSite PlanShowing existing buildings/structures, existing off-street and on-street parking with total space count, a summary table of floor area and required parking by proposed use, driveway/access design and cross-sections, proposed sign details, and existing fire hydrant locations.
- OptionalGeological Hazards / Parking and Traffic Impact / Photometric StudiesRequired if applicable, per the Change of Use Application Checklist.
- OptionalConditional Use Permit Checklist and Site Plan Approval submittalRequired instead of (or in addition to) the administrative checklist when the new use is classified as a conditional use, per MKZ 18.15.030(A)/(B).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Change of Use Permit (administrative, Planning Director decision) | $110.00 | Millcreek Consolidated Fee Schedule, Item 128 ('Tenant Change'), pre-recodification code cite 19-02-130 (dated 8/12/2024, Ordinance No. 24-37). Millcreek's current zoning code (MKZ 18.15.030(C), per Exhibit A adopted 4/28/2025) names this application a 'Change of Use Permit'; no separately renumbered post-recodification fee item was found, so this staff-review fee is treated as the governing figure for the administrative tier. |
| Conditional Use – Change of Use and No New Development (Planning Commission decision, includes site plan review) | $1,200.00 | Millcreek Consolidated Fee Schedule, Item 138, pre-recodification code cite 19-84-030 (dated 8/12/2024). Applies when the new use classification is a conditional use rather than a permitted use, per MKZ 18.15.030(C)(1). |
| Public Notice Mailings (heavier tier only) | $1.25 per notice | Millcreek Consolidated Fee Schedule, Item 143, code 19-02-160 — applies to the Conditional Use Permit public-hearing tier, which requires mailed notice to property owners within 300 feet. |
Sources & verification
Verified against official sources. Last reviewed 2026-06-30.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Millcreek building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.