Version history — Riverton, Utah
This is PermitBase’s own verified record for Riverton, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Riverton’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-07-16Current record
- 2026-07-01Superseded
- Riverton, Utah — Electrical Permit fee record updated: Fees based on the 1994 Modified UBC 1-A Fee Table (same table as building permit); valuation estimated from scope of work → Assessed on project valuation per the 1994 Modified UBC 1-A Fee Table (same table as the building permit); valuation estimated from scope of work per February 2020 ICC BVD Table
- Riverton, Utah — Plumbing Permit fee record updated: Fees based on the 1994 Modified UBC 1-A Fee Table (same table as building permit); valuation estimated from scope of work → Assessed on project valuation per the 1994 Modified UBC 1-A Fee Table (same table as the building permit); valuation estimated from scope of work per February 2020 ICC BVD Table
- Riverton, Utah — Mechanical / HVAC Permit fee record updated: Fees based on the 1994 Modified UBC 1-A Fee Table (same table as building permit); valuation estimated from scope of work → Assessed on project valuation per the 1994 Modified UBC 1-A Fee Table (same table as the building permit); valuation estimated from scope of work per February 2020 ICC BVD Table
- Riverton, Utah — Accessory Dwelling Unit (ADU) fee record updated: Fees based on the 1994 Modified UBC 1-A Fee Table; valuation per February 2020 ICC BVD Table → Assessed on project valuation per the 1994 Modified UBC 1-A Fee Table; valuation per February 2020 ICC BVD Table
- 2026-06-30Superseded
- Riverton, Utah — fee schedule re-verified across 10 permit types
- Riverton, Utah — permit-type records re-verified (24 updates)
- 2026-06-27Initial record — coverage of Riverton began