Accessory Dwelling Unit (ADU) in Sandy, Utah

Required for construction of a secondary dwelling unit on a residential property in Sandy, including basement apartments, detached cottages, and garage conversions.

Verified 2026-06-27 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
ADU Permit (valuation < $50,000)$553
ADU Permit (valuation $50,000-$100,000)$1,524
ADU Permit (valuation $100,000-$250,000)$2,042
ADU Permit (valuation $250,000-$500,000)$2,930
ADU Permit (valuation > $500,000)$3,753+

Review timeline

~1430 business days

Typical estimate — confirm current times with the Sandy building department

Inspection process

  1. 1

    Foundation

    Footings, forms, rebar — before concrete pour

  2. 2

    Framing

    Structure, fire separation, egress windows

  3. 3

    MEP Rough-In

    Mechanical, electrical, plumbing rough-ins before walls closed

  4. 4

    Insulation

    Insulation and vapor barrier before drywall

  5. 5

    Final

    All work complete, smoke/CO detectors, address posted, ready for occupancy

Tips

Frequently asked questions

Can I build an ADU in Sandy?
Most likely yes. Utah state law (HB 82) requires cities to allow internal ADUs. Sandy may also allow detached ADUs depending on zoning. Contact Sandy planning department to confirm your property qualifies.
How much does an ADU permit cost in Sandy?
ADU permit fees in Sandy follow the city fee schedule: ADU Permit (valuation < $50,000) — $553; ADU Permit (valuation $50,000-$100,000) — $1,524; ADU Permit (valuation $100,000-$250,000) — $2,042; ADU Permit (valuation $250,000-$500,000) — $2,930; ADU Permit (valuation > $500,000) — $3,753+. Under Utah law, impact fees for internal or attached ADUs may be reduced or waived — confirm with the building department.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-06-27.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sandy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Sandy

Related guides

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.