Skip to main content
PermitBase

Draper building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Draper, Utah.

Last verified 2026-07-13 · Source · Embed this page’s badge · Version history

Building department

Address
1020 E. Pioneer Rd., Draper, UT 84020
Phone
(801) 576-6399
Office hours
Mon–Fri 8:00 AM – 5:00 PM

Inspection guide

See how inspections work in Draper — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition
  • 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unaffected by the 7/1/2026 statute revision, continues in force
  • 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition
  • 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition
  • 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition
  • 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unaffected by the 7/1/2026 statute revision, continues in force
  • 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition
  • 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition
  • 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition
  • NOTE: Effective July 1, 2026 (now in force) — 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC replaced the 2021 editions per Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027; text independently re-verified live at le.utah.gov 2026-07-16). The 2021 IRC and 2023 NEC were unaffected by this revision and remain in force.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
9units

9 buildings · $9.8M valuation

Trailing 12 months
168units

12 of 12 months reported · #33 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
58units

58 buildings · $36M valuation

5 month(s) reported to Census

Full year 2025
280units

223 buildings · $119.6M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Draper has a mandatory geotechnical engineering report requirement — building permits for homes, townhouses, apartments, and commercial buildings will NOT be accepted unless a soils/geotech report for the specific parcel has been reviewed and approved by Draper City.
  • Draper is in significant hillside terrain. Properties in the Hillside Overlay District face additional engineering and geotechnical requirements.
  • All electronic plan files submitted to the Draper Online Services Portal must be unlocked (not password-protected); locked files are returned immediately without review.
  • Utah Code § 15A-2-103 governs adopted construction codes statewide. Effective July 1, 2026 (now in force), the 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC replaced the 2021 editions. The 2021 IRC and 2023 NEC were unaffected and continue in force. (Re-verified against the live statute text at le.utah.gov 2026-07-16.)
  • Draper's Consolidated Fee Schedule (Resolution 26-29, July 2026 — supersedes Resolution 26-29 Oct 2025; same fee amounts) is the authoritative fee document — the building permit uses the ICC Building Valuation Data schedule; electrical, plumbing, and mechanical permits each have flat $150 fees.
  • The $500 deposit due at permit application is applied toward the total building permit fee; refunds on canceled/changed permits are capped at 60% of the permit fee.
  • Draper processes permits through the Online Services Portal at draper.onlama.com — create an account before applying.

Comparable nearby cities

West Jordan
Both in Salt Lake County19 shared permit types~10 mi away
Compare fees →
Herriman
Both in Salt Lake County18 shared permit types~8 mi away
Compare fees →
Bountiful
19 shared permit typesBoth on the 2024 International Existing Building Code (IEBC)~26 mi away
Compare fees →