Roofing Permit in Draper, Utah

Required for roof replacement and re-roofing in Draper. Listed as 'Re-Roof' in Draper's Online Services Portal. Fees are valuation-based under the ICC Schedule per Resolution 26-29.

Verified 2026-07-13 · Source

When you need this permit

  • Complete roof replacement (tear-off and re-roof)
  • Overlay of new roofing over existing (where code allows — max two layers)
  • Structural roof repairs or modifications
  • Changes to roofing material type

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Re-Roof Permit — valuation-basedAssessed on project valuation per Draper's building permit fee schedule, cited: Draper Consolidated Fee Schedule, Resolution 26-29 (Jul 2026), item 44 — re-fetched and confirmed live 2026-07-13. Re-Roof is a distinct permit type in Draper's Online Services Portal but is billed as a Building Permit (100% ICC Schedule), confirmed against Draper's published Applications/Licenses/Permits type list. Prior citation (Resolution 25-52, Oct 2025 PDF) went dead (404); superseded by Resolution 26-29 (Jul 2026) at the same media URL with identical fee figures.
100% of the ICC Schedule (based on total value of roofing work)
Plan ReviewDraper Consolidated Fee Schedule, Resolution 26-29, item 45
65% of the building permit fee
Re-inspection FeeDraper Consolidated Fee Schedule, Resolution 26-29, item 56
$85.00 per inspection

Review timeline

Plan reviewTypical estimate — confirm current times with the Draper building department
~1–5 business days

How long did your Roofing Permit permit actually take in Draper?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Deck / Substrate

    After tear-off — verify sheathing condition, replace damaged decking before proceeding

  2. 2

    Final

    Completed roof — verify ice and water shield, flashing, drip edge, and nailing pattern

See the full Draper inspection guide — scheduling & re-inspection fees →

Tips

  • Draper's permit portal lists 'Re-Roof' as a separate permit category — apply through the Online Services Portal at draper.onlama.com.
  • The adopted 2021 IRC governs roofing material and installation requirements.
  • Ice and water shield is required in valleys and at eaves per the adopted IRC.
  • A maximum of two roofing layers is permitted; full tear-off is required if two layers already exist.

Frequently asked questions

Yes. Draper requires a Re-Roof permit for all roof replacements and re-roofing projects. The fee is valuation-based under the ICC Building Valuation Schedule per Resolution 26-29. Apply via the Online Services Portal at draper.onlama.com.

Draper roofing permit fees are valuation-based at 100% of the ICC Building Valuation Schedule plus plan review at 65% of the permit fee, per Resolution 26-29. Contact the Building Division at (801) 576-6399 for an estimate.

Plan review for a roofing permit in Draper typically runs 1–5 business days. This is an estimate, not a published figure — confirm current review times with Draper City Building Division at (801) 576-6399.

You'll need: Re-Roof Permit Application. Depending on your project, Draper may also ask for: Contractor License. See the required-documents checklist on this page for details on each.

Draper requires 2 inspection(s) for a roofing permit, in order: Deck / Substrate, Final. Schedule each through Draper City Building Division ((801) 576-6399).

Apply through Draper City Building Division at 1020 E. Pioneer Rd., Draper, UT 84020. Phone: (801) 576-6399, email: building@draperutah.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.draperutah.gov/business-development/building-and-renovating/.

Draper, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unaffected by the 7/1/2026 statute revision, continues in force; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unaffected by the 7/1/2026 statute revision, continues in force; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition; NOTE: Effective July 1, 2026 (now in force) — 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC replaced the 2021 editions per Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027; text independently re-verified live at le.utah.gov 2026-07-16). The 2021 IRC and 2023 NEC were unaffected by this revision and remain in force..

Sources & verification

Verified against official sources. Last reviewed 2026-07-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Draper building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.