Fire Sprinkler Permit — Draper, Utah · Requirements sheet
Verified 2026-07-21 · Source: https://www.draperutah.gov/media/1e5lpwqo/consolidated-fee-schedule-jul-2026-clean-copy-without-short-term-rental.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Fire Sprinkler Permit in Draper, Utah
Required for installation, alteration, or repair of an automatic fire sprinkler system in Draper. Draper has operated its own city Fire Department since exiting Unified Fire Authority on July 1, 2017 (Draper City Council voted 4-1 to withdraw); the Draper Fire Marshal's Office handles fire sprinkler plan review, permitting, and inspection directly, billed through the same Consolidated Fee Schedule (Resolution 26-29) that covers the city's other permits. Residential systems use a flat inspection fee; commercial new-system installs and commercial remodel/tenant-finish work are billed on separate head-count tiers, with the remodel/tenant-finish tiers priced lower than new-system installs.
Verified 2026-07-21 · Source
When you need this permit
- Installation, alteration, or repair of an automatic fire sprinkler system in a residential or commercial building
- New commercial systems billed by sprinkler head count (under 100, 100-199, 200-299, or over 300 heads) plus a per-head charge
- Commercial remodel or tenant-finish sprinkler work billed on a separate, lower head-count fee tier (under 20, 21-50, or over 50 heads) plus a per-head charge
- Residential fire sprinkler systems billed a flat inspection fee that includes two inspections
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In / Underground
Piping, hangers, and underground supply verified before concealment
- 2
Acceptance Test / Final
Hydrostatic test, flow test, and final acceptance of the completed system; included in the base plan review fee (2 inspections residential, 3 inspections commercial)
See the full Draper inspection guide — scheduling & re-inspection fees →
Tips
- Draper left Unified Fire Authority on July 1, 2017 and operates its own Draper City Fire Department — fire sprinkler permitting is handled by Draper's own Fire Marshal's Office, not UFA.
- Commercial remodel/tenant-finish sprinkler work is billed at a lower rate than a brand-new system install — confirm which tier applies with the Fire Marshal's Office before budgeting.
- Residential fire sprinkler inspections include 2 inspections in the base $100.00 fee; commercial plan reviews include 3 inspections in the base fee.
- An expedited fire plans review doubles the applicable permit fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-21.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Draper building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Draper
Fire Sprinkler Permit in other cities
Compare fire sprinkler permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Draper project checklist
Describe your project once and get every permit, document, and fee it triggers in Draper — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →