Automatic Fire Protection (Fire Sprinkler) System Permit in Cedar Hills, Utah

Required in Cedar Hills for installation of an automatic fire sprinkler system, plan-reviewed in-house by the City (not delegated to a third-party reviewer) under the Public Safety section of the City's own Fee Schedule (effective 07/01/2026), Resolution 07-16-2019A. These are the same 'Automatic Fire Protection System / In House Plan Review' fees already itemized within this record's commercial-building-permit entry; this entry consolidates them as their own permit type, matching the convention used for this permit category in peer Utah County jurisdictions (e.g. American Fork's fire-sprinkler-permit). Fees are priced by sprinkler head count, plus separate acceptance-testing fees; there is no distinct fee schedule from a separate joint fire authority — Cedar Hills' own Public Safety fee table is the governing source.

Verified 2026-07-21 · Source

When you need this permit

  • Automatic fire sprinkler system installation (or remodel/extension) in a commercial building or tenant space within Cedar Hills
  • Sprinkler system plans, including sprinkler head count, submitted to the City for in-house plan review under Resolution 07-16-2019A
  • Filed alongside the underlying Building Permit (new commercial construction or tenant improvement) — Cedar Hills does not publish a standalone sprinkler-permit application separate from the Building Permit Application
  • Acceptance testing (underground flush, hydrostatic, and acceptance tests) required prior to final approval

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Automatic Fire Protection System — In House Plan Review, <100 headsCity of Cedar Hills Fee Schedule, effective 07/01/2026, Public Safety section, page 9: '<100 heads — $75.00 — Resolution 07-16-2019A.' Confirmed 2026-07-21 by rendering page 9 of the current fee-schedule PDF to a PNG image and reading it visually, since plain-text extraction jumbled the table (same column-jumbling issue previously documented for this fee schedule's Sign Permit row).
$75.00
Automatic Fire Protection System — In House Plan Review, 101-199 headsCity of Cedar Hills Fee Schedule, effective 07/01/2026, Public Safety section: '101-199 heads — $100.00 — Resolution 07-16-2019A.'
$100.00
Automatic Fire Protection System — In House Plan Review, 200-299 headsCity of Cedar Hills Fee Schedule, effective 07/01/2026, Public Safety section: '200-299 heads — $150.00 — Resolution 07-16-2019A.'
$150.00
Automatic Fire Protection System — In House Plan Review, >300 headsCity of Cedar Hills Fee Schedule, effective 07/01/2026, Public Safety section: '>300 heads – base fee plus $0.50 per head — $200.00 — Resolution 07-16-2019A.'
$200.00 base fee plus $0.50 per head
Acceptance Testing (Underground Flush, Hydrostatic, Acceptance)City of Cedar Hills Fee Schedule, effective 07/01/2026, Public Safety section, Acceptance Testing sub-table: 'Underground Flush — $50.00', 'Hydrostatic (2) — $50.00', 'Acceptance (2) — $50.00', 'Any Acceptance (2) — $50.00' — all Resolution 07-16-2019A.
$50.00 each (Underground Flush; Hydrostatic (2); Acceptance (2); Any Acceptance (2))

Review timeline

Plan review
Not published — contact the department

How long did your Automatic Fire Protection (Fire Sprinkler) System Permit permit actually take in Cedar Hills?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Acceptance Testing

    Underground flush, hydrostatic, and acceptance tests of the completed sprinkler system, billed per the City's Public Safety fee table, prior to final approval.

See the full Cedar Hills inspection guide — scheduling & re-inspection fees →

Tips

  • Sprinkler plan review fees are priced by head count (number of sprinkler heads), not a flat fee — confirm the head count before budgeting for plan review.
  • These are the same fees already itemized within this record's Commercial Building Permit entry's fee list — a sprinkler system is filed and reviewed as part of that Building Permit, not as a separate standalone application.
  • A separate $100.00 'Fire Department Administrative Fee' (Resolution 07-16-2019A) also appears in the City's Public Safety fee table, but its scope is not itemized to a specific permit type on the fee schedule — confirm with the Building Department whether it applies to a routine sprinkler plan review before assuming it does.

Frequently asked questions

Cedar Hills requires an automatic fire protection (fire sprinkler) system permit for: Automatic fire sprinkler system installation (or remodel/extension) in a commercial building or tenant space within Cedar Hills; Sprinkler system plans, including sprinkler head count, submitted to the City for in-house plan review under Resolution 07-16-2019A; Filed alongside the underlying Building Permit (new commercial construction or tenant improvement) — Cedar Hills does not publish a standalone sprinkler-permit application separate from the Building Permit Application; Acceptance testing (underground flush, hydrostatic, and acceptance tests) required prior to final approval. If your project isn't listed, confirm with City of Cedar Hills Building Department (staffed under Public Works; permit administration is independent of Utah County) at (801) 785-9668 x204 before starting work.

Per the City of Cedar Hills Fee Schedule (effective July 1, 2026), in-house plan review for an Automatic Fire Protection System is priced by sprinkler head count: $75.00 for under 100 heads, $100.00 for 101-199 heads, $150.00 for 200-299 heads, and $200.00 base plus $0.50 per head for 300 or more heads, plus $50.00 each for underground flush, hydrostatic, and acceptance testing.

Cedar Hills does not publish a plan-review timeline for this permit. Contact City of Cedar Hills Building Department (staffed under Public Works; permit administration is independent of Utah County) at (801) 785-9668 x204 for current turnaround.

You'll need: Building Permit Application; Automatic Fire Protection System Plans. See the required-documents checklist on this page for details on each.

Cedar Hills requires 1 inspection(s) for an automatic fire protection (fire sprinkler) system permit, in order: Acceptance Testing. Schedule each through City of Cedar Hills Building Department (staffed under Public Works; permit administration is independent of Utah County) ((801) 785-9668 x204).

Apply through City of Cedar Hills Building Department (staffed under Public Works; permit administration is independent of Utah County) at 10246 N Canyon Road, Cedar Hills, UT 84062. Phone: (801) 785-9668 x204, email: ssampson@cedarhillsutah.gov. Official information: https://www.cedarhills.org/page/building-department.

Cedar Hills, Utah has adopted: 2021 International Residential Code (IRC) — REMAINS CURRENT, Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 amendment; per Cedar Hills' official Building Permit Requirements form (revised 06/12/2025, live re-checked 2026-07-16): 'Current codes are 2021 IRC, 2021 IBC, 2021 IMC, 2021 IPC, 2020 NEC, 2018 IECC Commercial, 2018 IECC Residential, and 2021 IFGC and Utah State Amendments Title 15A.'; 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition Cedar Hills' Building Permit Requirements form still listed as of live re-check 2026-07-16.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition Cedar Hills' Building Permit Requirements form still listed as of live re-check 2026-07-16.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition Cedar Hills' Building Permit Requirements form still listed as of live re-check 2026-07-16.; 2023 National Electrical Code (NEC) per Utah Code § 15A-2-103(1)(g), unchanged by the 7/1/2026 amendment — Cedar Hills' own Building Permit Requirements form lists '2020 NEC,' which was ALREADY STALE before this code-cycle transition (the statewide-governing NEC edition has been 2023 since an earlier version of the statute). This is a pre-existing discrepancy in the city's own form, independent of the 7/1/2026 IBC/IPC/IMC/IFGC/IECC bump; reported as-published rather than corrected, per grounded-data policy.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes BOTH split editions ('2018 IECC Commercial, 2018 IECC Residential') Cedar Hills' Building Permit Requirements form still listed as of live re-check 2026-07-16 — those 2018 figures were already stale before the 7/1/2026 transition (the prior statewide edition was 2021), compounding with the new 2024 bump.; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition Cedar Hills' Building Permit Requirements form still listed as of live re-check 2026-07-16.; 2024 International Existing Building Code (IEBC) and residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(i)/(n); not itemized on Cedar Hills' Building Permit Requirements form at all, added here per statute since the City's own form omits them.; Utah State Amendments, Utah Code Title 15A — per the same official Building Permit Requirements form.; NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Cedar Hills' Building Permit Requirements form (5il.co/26de1, redirecting to a Cedar Hills-hosted PDF) was live re-fetched 2026-07-16 and remains marked 'Revised 6/12/2025' with NO update: it still lists 2021 IBC/IMC/IPC/IFGC, 2020 NEC, and split 2018 IECC. The NEC (2020, should be 2023) and IECC (2018, should now be a single 2024 edition) entries were already stale under the PRE-7/1/2026 version of the statute — this form has not tracked Utah's construction-code cycle for multiple revisions. No newer Cedar Hills-specific code-adoption publication was found. The Utah Code § 15A-2-103 citation has been added to the sources array below, pointing to the current in-force version link.. Local amendments apply — see the Cedar Hills overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-21.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cedar Hills building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.