Commercial Building Permit in Cedar Hills, Utah
Required for new commercial construction (including commercial shell buildings) in Cedar Hills, regulated by the adopted 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 7/1/2026; Cedar Hills' own Building Permit Requirements form still lists the 2021 IBC as of its 06/12/2025 revision, live). Cedar Hills is a small, almost entirely residential planned community with limited commercial zoning concentrated along Cedar Hills Drive, but its Fee Schedule maintains a distinct 'Commercial/Industrial Plan Check' line (65% of the building permit fee), standalone commercial trade-permit and trade-inspection fees, non-residential impact fees, and a Cedar Hills Drive-specific street improvement fee, all separate from the residential fee structure. There is no separate commercial-specific submittal checklist published — the same Building Permit Requirements form used for residential construction governs commercial submittals too, and explicitly references 'COMM Check' energy-code documentation alongside 'RES Check' for residential.
Verified 2026-07-19 · Source
When you need this permit
- New commercial construction, regulated by the adopted 2024 IBC (per Utah Code § 15A-2-103(1)(a), effective 7/1/2026)
- Completed Building Permit Application (submitted via the online iworq permit portal or by print application)
- 2 sets of building plans drawn to scale, including a site plan (north arrow, lot dimensions, setbacks, easements, property lines, water meter/sewer lateral location, driveway/hard-surface locations, retaining walls), per the city's Building Permit Requirements form — the same checklist used for residential submittals
- Construction plans: floor plans, footing/foundation details, structural framing, electrical/mechanical/plumbing design details, and Energy Code compliance documentation via COMM Check (the Building Permit Requirements form explicitly lists 'RES Check, COMM Check, Manual D, J & S, etc. as applicable')
- Structural calculations stamped by a Utah-licensed structural engineer
- Concept/Preliminary/Final Site Plan Review approval for new commercial development — a separate Planning-level review process from the building permit itself, per the city's Fee Schedule
- Commercial/Industrial Plan Check Deposit, estimated actual cost, due at application
- Fire Department in-house plan review submittal if the project includes an automatic fire sprinkler system or fire alarm system
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
City of Cedar Hills Fee Schedule, effective 07/01/2026, Planning/Building/Zoning section: 'Building Permit — Based on valuation — Building Permit — International Building Code.' Same line item used… Show full citationHide
City of Cedar Hills Fee Schedule, effective 07/01/2026, Planning/Building/Zoning section: 'Building Permit — Based on valuation — Building Permit — International Building Code.' Same line item used for both residential and commercial construction; no separate commercial dollar table is published.City of Cedar Hills Fee Schedule, effective 07/01/2026, Development Fees section: 'Concept/Preliminary/Final Site Plan Review – Commercial — $2,000.00 + $150.00/Lot — At Application — Resolution… Show full citationHide
City of Cedar Hills Fee Schedule, effective 07/01/2026, Development Fees section: 'Concept/Preliminary/Final Site Plan Review – Commercial — $2,000.00 + $150.00/Lot — At Application — Resolution 08-05-2025B.' A Planning-level development fee, billed separately from the building permit fee.City of Cedar Hills Fee Schedule, effective 07/01/2026, New Construction Fees (Per ERU) table: 'Gas Line Inspection (Commercial) — $65.00 — Building Permit — Resolution 01-05-2021A' and 'Temporary… Show full citationHide
City of Cedar Hills Fee Schedule, effective 07/01/2026, New Construction Fees (Per ERU) table: 'Gas Line Inspection (Commercial) — $65.00 — Building Permit — Resolution 01-05-2021A' and 'Temporary Power & Permanent Power Inspection (each)(Commercial) — $65.00 — Building Permit — Resolution 01-05-2021A.' Both are higher than the $53.00 residential equivalents on the same table.City of Cedar Hills Fee Schedule, effective 07/01/2026: 'Plumbing Permit (Commercial) — $35.00', 'Mechanical Permit (Commercial) — $35.00', and 'Electrical Permit (Commercial) — $35.00 — Building… Show full citationHide
City of Cedar Hills Fee Schedule, effective 07/01/2026: 'Plumbing Permit (Commercial) — $35.00', 'Mechanical Permit (Commercial) — $35.00', and 'Electrical Permit (Commercial) — $35.00 — Building Permit — Resolution 01-05-2021A' (three separate line items). Residential trade work has no equivalent standalone fee — it is folded into the residential Building Permit fee.City of Cedar Hills Fee Schedule, effective 07/01/2026, Impact Fees (Per ERU) table: 'Public Safety – Non Residential, Per 1,000 Unit — $711.18', 'Sewer (Cedar Hills), Non-Residential' meter-size… Show full citationHide
City of Cedar Hills Fee Schedule, effective 07/01/2026, Impact Fees (Per ERU) table: 'Public Safety – Non Residential, Per 1,000 Unit — $711.18', 'Sewer (Cedar Hills), Non-Residential' meter-size tiers (1" $1,207.44 through 10" $33,808.28), and 'Culinary Water / AWWA RATIOS 2023' meter-size tiers (3/4" $887.53 through 4" $14,795.12), all collected at Building Permit.City of Cedar Hills Fee Schedule, effective 07/01/2026, Transportation table: 'General Office Building, 1,000 SQ FT gross floor area — $1,306.02', 'Business Park, 1,000 SQ FT gross floor area —… Show full citationHide
City of Cedar Hills Fee Schedule, effective 07/01/2026, Transportation table: 'General Office Building, 1,000 SQ FT gross floor area — $1,306.02', 'Business Park, 1,000 SQ FT gross floor area — $1,106.49', 'Shopping Plaza, 1,000 SQ FT gross leasable area (40% Pass-By) — $4,913.91', 'Business Hotel, Rooms — $281.16' — Resolution 02-07-2023B.City of Cedar Hills Fee Schedule, effective 07/01/2026: 'Commercial Street Improvement Fee (Cedar Hills Drive) – Cost Per Acre — $10,750 — Building Permit — Series 2000 Road Bond.' Applies… Show full citationHide
City of Cedar Hills Fee Schedule, effective 07/01/2026: 'Commercial Street Improvement Fee (Cedar Hills Drive) – Cost Per Acre — $10,750 — Building Permit — Series 2000 Road Bond.' Applies specifically to commercial development fronting Cedar Hills Drive, the city's primary commercial corridor.City of Cedar Hills Fee Schedule, effective 07/01/2026, Public Safety section: 'Automatic Fire Protection System / In House Plan Review — <100 heads $75.00, 101-199 heads $100.00, 200-299 heads… Show full citationHide
City of Cedar Hills Fee Schedule, effective 07/01/2026, Public Safety section: 'Automatic Fire Protection System / In House Plan Review — <100 heads $75.00, 101-199 heads $100.00, 200-299 heads $150.00, >300 heads – base fee plus $0.50 per head $200.00 — Resolution 07-16-2019A' and 'Fire Alarm System (Fees are for In-House Plan Reviews Only) / Plan Review — New System $100.00 — Resolution 07-16-2019A.'Review timeline
Inspection process
- 1
Building, Electrical, Mechanical & Plumbing
All inspections are performed by Sunrise Engineering under contract to the City of Cedar Hills. Scheduled by phone at 800-560-6151; 24 hours' notice required, no same-day inspections.
- 2
Fire Alarm / Fire Sprinkler Plan Review and Inspection (if applicable)
Required only when the project includes an automatic fire sprinkler or fire alarm system; in-house plan review billed per the city's Public Safety fee table (see fees).
- 3
Final Inspection (Commercial)
No commercial-specific final inspection checklist distinct from the general Building Department final inspection process was found published separately from the residential/new-construction Final Inspection Checklist.
See the full Cedar Hills inspection guide — scheduling & re-inspection fees →
Tips
- Cedar Hills is a small, mostly residential planned community — commercial construction is concentrated along Cedar Hills Drive, the only corridor subject to the $10,750/acre Commercial Street Improvement Fee.
- The Commercial/Industrial Plan Check rate (65% of the building permit fee) matches the residential new-construction rate — there is no reduced commercial rate analogous to the 26% rate residential basement finishes/small structures/solar receive.
- Commercial trade work (plumbing, mechanical, electrical) is separately fee-scheduled at $35.00 per trade permit — unlike residential trade work, which has no standalone fee and is folded into the Building Permit fee.
- A business operating in commercial space in Cedar Hills also needs its own annual Commercial business license (separate Base/Building-and-Fire-inspection/per-employee fees on the city's Business Licensing fee table) — that is a distinct process from this construction permit and is not itemized in this record's fees.
- No commercial-specific plan-review turnaround time is published anywhere on the city's site; confirm an expected timeline directly with the Building Department (801-785-9668 x204) before committing to a project schedule.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fee schedules
Checklists & handouts
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cedar Hills building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Cedar Hills.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Property Access
Cedar Hills's permit history is searchable by address
4,953 permits on record for Cedar Hills, 1977–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
Other permits in Cedar Hills
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Cedar Hills project checklist
Describe your project once and get every permit, document, and fee it triggers in Cedar Hills — in one checklist. Free, for any city and any number of projects.
Get started →