Commercial Building Permit in Centerville, Utah
Required for new commercial, industrial, or multi-family building construction in Centerville, governed by the 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 7/1/2026; Centerville's own Municipal Code Title 10.03 is confirmed still codified at the 2021 IBC as of live re-check 2026-07-16 — see codesAdopted note). The base Building Permit Fee is calculated from the same Total Building Valuation Chart (Fee Schedule § 4.010) used for residential permits, but Commercial/Industrial/Multi-Family projects are billed a separate, higher Plan Review rate under Fee Schedule § 4.040.
Verified 2026-07-19 · Source
When you need this permit
- New commercial, industrial, or multi-family building construction (per the official Building Permit Application permit-type checkboxes)
- Estimated permit valuation must be provided at time of application, per CMC § 10.04.120
- 'New' Commercial Build projects require (2) sets of 24x36 plans for review, per the official Building Permit Application
- Licensed Contractor Declaration required on the application Contractor
- $1,000 refundable Construction Bond due prior to issuance, per Fee Schedule § 4.010
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Centerville City Fee Schedule § 4.010 (Building Permits), 'Total Building Valuation Chart,' adopted by Res. Show full citationHide
Centerville City Fee Schedule § 4.010 (Building Permits), 'Total Building Valuation Chart,' adopted by Res. 2017-18 on 8/15/2017; re-confirmed live via browser render of centerville.municipalcodeonline.com/book?type=fees 2026-07-19. This is the same table used for residential permits — Centerville does not maintain a separate commercial valuation chart.Centerville City Fee Schedule § 4.040 (Plan Reviews): 'Commercial, Industrial, Multi-Family Building Plan Review (excluding single-family dwellings, private garages, carports, sheds, and agricultural… Show full citationHide
Centerville City Fee Schedule § 4.040 (Plan Reviews): 'Commercial, Industrial, Multi-Family Building Plan Review (excluding single-family dwellings, private garages, carports, sheds, and agricultural buildings) — 65% of Building Permit Fee (Peer review to be added fee of actual billing to City). Prior to Issuance.' Confirmed live 2026-07-19 — more than double the 25% residential plan-review rate.Review timeline
Inspection process
- 1
Scheduled Inspections (Building/Electrical/Mechanical/Plumbing)
Provided by Sunrise Engineering under contract to the City; scheduled by calling 1-800-560-6151, with 24-hour advance notice required, per the official Building and Renovating page.
See the full Centerville inspection guide — scheduling & re-inspection fees →
Tips
- Commercial/Industrial/Multi-Family plan review in Centerville is billed at 65% of the Building Permit Fee — more than double the 25% residential rate — plus actual-cost billing for any required peer review.
- The underlying Building Permit Fee itself uses the SAME Total Building Valuation Chart as residential; only the plan-review percentage and cardfile plan-check fee differ for commercial projects.
- 'New' Commercial Build projects require two sets of 24x36 plans for review, per the official Building Permit Application — confirm sheet size before submitting.
- A $1,000 refundable Construction Bond applies to commercial permits, the same flat amount as residential — Centerville does not publish a larger commercial-specific bond figure.
- Centerville does not publish a distinct fire sprinkler or fire alarm system permit, fee, or plan-review line item — confirmed via a live browser render of the full Fee Schedule (centerville.municipalcodeonline.com/book?type=fees, all 20 chapters, 2026-07-20): Chapter 4 (Building Permit Fees) has no fire-specific fee, and the city's own Chapter 12 'Fire/EMS Impact Fee' (§ 12.040) was adopted by Res. 2017-18 on 8/15/2017 and then REPEALED by Res. 2017-19 on 9/19/2017 — Centerville currently has no fire-related fee of any kind on its published Fee Schedule. Fire suppression/alarm system work for commercial construction is priced through the same valuation-based Building Permit Fee and 65%-of-permit Commercial Plan Review fee used for the project generally.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fee schedules
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Centerville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Centerville.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Centerville's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Centerville yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Centerville lands. Privacy.
Other permits in Centerville
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Centerville project checklist
Describe your project once and get every permit, document, and fee it triggers in Centerville — in one checklist. Free, for any city and any number of projects.
Get started →