Commercial Building Permit in Brigham City, Utah
Required for new commercial construction in Brigham City. Uses the same valuation-based Building Permit Fee table as residential (Fee Code 701), but the Plan Review Fee is charged at a distinctly higher commercial rate than the residential rate — the city's official Building Fees worksheet prints side-by-side residential and commercial worked examples off the same building valuation.
Verified 2026-07-19 · Source
When you need this permit
- New commercial construction
- Site-specific soils report meeting 2021 IBC Section 1803 requirements, no older than 2 years, required for ALL commercial projects and new subdivisions (additions to existing facilities under 3,000 sq ft are exempted)
- Compliance with the state-adopted 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 7/1/2026) — Brigham City's own Design Criteria document still cites the 2021 IBC
- Building Permit Application complete with General/Electrical/Plumbing/Mechanical Contractor names and license numbers
- Structural engineering (site-specific, wet-stamped) given the city's Seismic Design Category D2 and 90 mph wind design criteria
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Brigham City official Building Fees worksheet ('BRIGHAM CITY FEE SCHEDULE,' fee code 701): 'If your project is valued at $300,000.00 then you find that amount in the left column under the header valuation. Show full citationHide
Brigham City official Building Fees worksheet ('BRIGHAM CITY FEE SCHEDULE,' fee code 701): 'If your project is valued at $300,000.00 then you find that amount in the left column under the header valuation. In the 4th column to the left you will see that the building permit fee is $2,249.93.' Same valuation-based Building Permit Fee table is used for both residential and commercial projects — only the Plan Check Fee column differs (see below).Brigham City official Building Fees worksheet: 'If your project is a commercial project you will go to the Com Plan Check Fee column and see that your plan review fee is $899.97' on a $2,249.93… Show full citationHide
Brigham City official Building Fees worksheet: 'If your project is a commercial project you will go to the Com Plan Check Fee column and see that your plan review fee is $899.97' on a $2,249.93 building permit fee ($899.97 / $2,249.93 = 40.0%). This is DOUBLE the 15% residential plan-check rate charged on the same valuation ($337.49 residential vs $899.97 commercial on an identical $300,000 project) — the worksheet explicitly prints both columns side by side for direct comparison.Review timeline
Inspection process
- 1
Required Inspections (per official Building Fees worksheet checklist)
Footings/Foundations/Setbacks; Water/Sewer lateral (Public Works inspector); Underground plumbing; Exterior sheeting/vapor barrier; 4-way rough (Framing, Electrical, Plumbing, HVAC); Insulation; Power to panel; Final Inspection — the same general sequence documented for residential permits; Brigham City does not publish a separate commercial inspection checklist.
See the full Brigham City inspection guide — scheduling & re-inspection fees →
Tips
- Brigham City's commercial Plan Check Fee (40% of the building permit fee) is more than double the residential rate (15%) on an identical project valuation — budget accordingly; the city's own Building Fees worksheet prints both columns side by side to make this comparison explicit.
- A site-specific soils report (2021 IBC Section 1803, no older than 2 years) is mandatory for essentially all commercial projects and new subdivisions in Brigham City — additions under 3,000 sq ft to an existing facility are the only exemption.
- Impact fees do NOT apply to commercial permits — they are reserved for new single-family dwelling permits only, per the city's own Building Fees worksheet.
- Brigham City Municipal Code § 156.300 (Fire Protection) authorizes the Fire Marshal to require 'approved fire sprinkler and suppression systems' as a condition of meeting the city's development level-of-service standard, and to require a written fire protection mitigation plan when the standard level of service cannot otherwise be met — but no distinct fire sprinkler/alarm permit application, fee line item, or plan-review fee schedule is published by Brigham City (not in the official Building Fees worksheet, the Design Criteria document, or the city's Fire Codes and Standards / Fire and EMS pages). Fire suppression system review for commercial construction appears to be handled through the general commercial building permit's Plan Check Fee rather than a separate fire-specific fee — confirm directly with the Fire Marshal's office (Brigham City Fire Station, 442 W. Forest Street, (435) 723-3611) before budgeting a project requiring sprinklers.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Brigham City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Brigham City.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Property Access
Brigham City's permit history is searchable by address
1 permits on record for Brigham City, 2024–2024 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
0% of Brigham City's records carry a street address to match against, so a search that finds nothing here means we could not look — not that the property is clear.
Other permits in Brigham City
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Brigham City project checklist
Describe your project once and get every permit, document, and fee it triggers in Brigham City — in one checklist. Free, for any city and any number of projects.
Get started →