Residential Solar / PV System (Distributed Generation Interconnection) — Brigham City, Utah · Requirements sheet
Verified 2026-07-19 · Source: https://www.bcutah.gov/o/brighamcity/page/solar-power
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Solar / PV System (Distributed Generation Interconnection) in Brigham City, Utah
Required for residential rooftop or ground-mount solar photovoltaic installations in Brigham City. Because Brigham City operates its own municipal electric utility (Brigham City Power), solar PV installs go through a distinct Distributed Generation Interconnection process administered by Brigham City Power rather than the standard Building Division — separate from a general electrical permit, with its own application portal, fee schedule, and third-party plan-review/inspection consultant (West Coast Code Consultants, WC3).
Verified 2026-07-19 · Source
When you need this permit
- Homeowner must watch the solar orientation video and answer the accompanying questions before making any non-refundable payments to Brigham City or a solar company
- Homeowner must review the City Code section on Distributed Generation Interconnection (Brigham City Code § via amlegal Title, chapter 0-0-0-19707)
- Homeowner must complete the required interconnection forms and submit them to the installing contractor for inclusion with the permit application
- Contractor submits the permit application with required documents through Brigham City Power's Connect Portal and pays the non-refundable $50 administrative fee
- System design is reviewed by West Coast Code Consultants (WC3), Brigham City's third-party plan-review/inspection consultant for distributed generation, following a preliminary onsite inspection by Brigham City Power
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Preliminary Onsite Inspection
Brigham City Power performs a preliminary onsite inspection before referring the application to WC3 for design review, per the official Solar Power page.
- 2
WC3 Design Review
West Coast Code Consultants (WC3) conducts the system design review; paid directly to WC3, separate from Brigham City's own permit fees.
- 3
WC3 Post-Installation Inspection
Scheduled by calling WC3 inspector Josh Goodman at (801) 455-0029 following system installation; paid to WC3.
- 4
Permission to Operate
Once WC3's final inspection is received, Brigham City issues a 'Permission to Operate' letter authorizing the system to be turned on.
See the full Brigham City inspection guide — scheduling & re-inspection fees →
Tips
- Because Brigham City runs its own municipal electric utility, solar PV permitting here is handled by Brigham City Power (not the Community and Economic Development Building Division) and involves a third-party plan reviewer, WC3 — budget extra lead time versus a standard building-department-only process.
- Watch the required solar orientation video and complete the Distributed Generation Interconnection forms BEFORE signing a contract or making any non-refundable payment to a solar company, per the city's explicit guidance.
- The $50 administrative fee is paid up front and is non-refundable, even if the project does not proceed.
- WC3's own design-review and post-install inspection fees are separate from and in addition to Brigham City's $50/$150/$315/$1.50/$50+ fee schedule.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Brigham City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Brigham City
Residential Solar / PV System (Distributed Generation Interconnection) in other cities
Compare residential solar / pv system (distributed generation interconnection) fees across Utah →
Look up this fee in a different city →
Now live
Build your Brigham City project checklist
Describe your project once and get every permit, document, and fee it triggers in Brigham City — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →