Residential Building Permit (New Single-Family Dwelling) in Brigham City, Utah
Required for new single-family dwelling construction in Brigham City. Fees are valuation-based per the city's own published Building Permit Fee worksheet, which itemizes the Building Permit Fee, Plan Review Fee, utility connection fees, State surcharge, and impact fees for new single-family dwellings specifically (impact fees do not apply to additions/alterations/repairs). Brigham City's permit fee materials (Permit_Fee_Sample.pdf and Brigham_City_Permit_Fees_explanation_2023.pdf) note that connection fees for water, sewer, and electrical service do not appear in the valuation-based fee chart and are billed separately, but no distinct EV charger/EVSE fee or permit category was found in any Brigham City building-permit document as of 2026-07-19 — a standalone EV charger installation would be handled as standard electrical work under the general building permit process.
Verified 2026-07-07 · Source
When you need this permit
- New single-family dwelling construction
- One (1) complete electronic set of plans: site plan, elevation drawings (all four sides), wall sections/sectional drawings, floor plan, energy compliance documents
- Manual J (furnace design) and Manual D (mechanical design) required
- Storm Water Connection Permit Application and Storm Water Construction Activity Permit Application (both free, submitted through Brigham City)
- Building Permit Application complete with General/Electrical/Plumbing/Mechanical Contractor names and license numbers
- Structural engineering required for all but the simplest 'box type' structures, per the city's stated seismic zone and structural requirements; engineering must be site-specific and wet-stamped/signed
- $200 non-refundable (once review has started) partial plan-check fee due at submittal; remaining plan-check balance added at permit issuance
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Required Inspections (per official Building Fees worksheet checklist)
Footings/Foundations/Setbacks; Water/Sewer lateral (Public Works inspector); Underground plumbing; Exterior sheeting/vapor barrier; 4-way rough (Framing, Electrical, Plumbing, HVAC); Insulation; Power to panel; Final Inspection.
See the full Brigham City inspection guide — scheduling & re-inspection fees →
Tips
- Impact fees (Storm Drain, Water, Sewer, Parks and Recreation, Electric, Fire, Transportation, Police) are included in new single-family dwelling permits but do NOT apply to additions, alterations, or repairs, per the city's own Building Fees worksheet.
- The $200 plan-check submittal fee is non-refundable once the plan review process has started, per the Single Family Dwelling Building Permit Submittal Requirements sheet.
- Structural engineering (site-specific, wet-stamped) is required for nearly all new construction in Brigham City given its seismic zone (D2) and structural code requirements, unless the structure is a simple 'box type' building.
- An email address is required on the application for inspection results, per the city's own submittal requirements sheet.
- No dedicated EV charger/EVSE permit or fee line item was found in Brigham City's published permit fee documents (files-backend.assets.thrillshare.com, Brigham City Permit Fees explanation 2023) as of 2026-07-19 — EV charger installation is treated as standard electrical work, not a separate permit category.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Brigham City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Brigham City
Residential Building Permit (New Single-Family Dwelling) in other cities
Compare residential building permit (new single-family dwelling) fees across Utah →
Look up this fee in a different city →
Now live
Build your Brigham City project checklist
Describe your project once and get every permit, document, and fee it triggers in Brigham City — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →