Residential Building Permit in Cedar Hills, Utah

Required for all new residential construction in Cedar Hills, regulated by the adopted 2021 IRC / 2024 IBC (per Utah Code § 15A-2-103, effective 7/1/2026 — Cedar Hills' own Building Permit Requirements form has not yet been updated to reflect the 2024 IBC as of 2026-07-16). The city's fee schedule charges a valuation-based Building Permit fee (no separate printed dollar table; assessed 'Based on valuation' per the International Building Code, i.e. IBC Section 109 / ICC Building Valuation Data methodology) plus a mandatory Residential Plan Check fee (65% of the building permit fee) and a tiered, square-footage-based Plan Check Deposit due at application. Cedar Hills' Master Fee Schedule lists a 'Temporary Power & Permanent Power Inspection (Residential)' fee of $65.00 and a separate 'Electrical Permit (Commercial)' fee category, both collected as part of the Building Permit, but no distinct EV charger/EVSE line item was found as of 2026-07-19 — a standalone home EV charger circuit would fall under the standard Temporary/Permanent Power Inspection fee rather than a dedicated EV charge.

Verified 2026-07-08 · Source

When you need this permit

  • New single-family residential construction regulated by the adopted 2021 IRC / 2024 IBC (per Utah Code § 15A-2-103, effective 7/1/2026)
  • Completed Building Permit Application (submitted via the online iworq permit portal or by print application)
  • 2 sets of building plans drawn to scale, including a site plan (north arrow, lot dimensions, setbacks, easements, property lines, water meter/sewer lateral location, driveway/hard-surface locations, retaining walls, and topographical details if slope exceeds 10%)
  • Construction plans: floor plans, footing/foundation details, structural framing, electrical/mechanical/plumbing design details, energy code compliance documentation (RES Check, COMM Check, Manual D/J/S as applicable)
  • Structural calculations stamped by a Utah-licensed structural engineer (roof trusses may be a deferred submittal)
  • Geotechnical report, including slope stability evaluation and retaining wall design, if lot slope exceeds 15%
  • HOA approval if applicable
  • Plan Check Deposit, based on gross square footage and/or valuation, due at application

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit Fee (valuation-based)
City of Cedar Hills Fee Schedule, effective 07/01/2026, Planning/Building/Zoning section: 'Building Permit — Based on valuation — Building Permit — International Building Code.' No standalone… Show full citationCity of Cedar Hills Fee Schedule, effective 07/01/2026, Planning/Building/Zoning section: 'Building Permit — Based on valuation — Building Permit — International Building Code.' No standalone dollar/square-footage table is published by Cedar Hills; valuation is assessed under the adopted 2021 IBC's valuation-based permit fee framework.
Based on valuation (no flat table published; assessed per International Building Code valuation methodology)
Residential Plan Check FeeCity of Cedar Hills Fee Schedule, effective 07/01/2026: 'Residential Plan Check — 65% of building permit fee — Building Permit — Resolution 04-21-2015A.'
65% of building permit fee
1% State FeeCity of Cedar Hills Fee Schedule, effective 07/01/2026: '1% State Fee — 1% of Building Permit — Building Permit — International Building Code' (statewide surcharge collected via the local building permit).
1% of Building Permit fee
Residential Plan Check DepositCity of Cedar Hills Fee Schedule, effective 07/01/2026, full tiered table (e.g. 1,801-2,100 sq ft: $1,100.00; 2,701-3,000 sq ft: $1,500.00; 4,701-5,000 sq ft: $2,300.00), due 'At Application' per Resolution 02-07-2017A.
$300.00 (1-275 sq ft) up to $3,900.00 (9,501-10,000 sq ft), tiered by gross square footage; Estimated Actual Cost for 10,000+ sq ft
Refundable Improvement BondCity of Cedar Hills Fee Schedule, effective 07/01/2026: 'Refundable Improvement Bond — $4,000.00 — Building Permit — Resolution 05-21-2024B' and 'Refundable Improvement Bond – Pools and Accessory Structures — $3,000.00.'
$4,000.00 (general); $3,000.00 for pools and accessory structures
New Construction Utility Fees (Per ERU)City of Cedar Hills Fee Schedule, effective 07/01/2026, 'New Construction Fees (Per ERU)' table, all collected at Building Permit issuance.
Construction Water Fee $150.00; Water Meter (3/4") & Installation $575.00; Water Lateral Inspection $75.00; Sewer Lateral Inspection $75.00; Gas Line Inspection (Residential) $53.00; Temporary/Permanent Power Inspection, each (Residential) $53.00; Pressurized Irrigation Infrastructure $656.90
Impact Fees (Per ERU)City of Cedar Hills Fee Schedule, effective 07/01/2026, 'Impact Fees (Per ERU)' and 'Transportation' tables, collected at Building Permit.
Parks (Single Family) $2,256.00; Public Safety (Residential, per unit) $495.13; Sewer (Cedar Hills, 3/4") $928.80; Culinary Water (3/4" meter) $887.53; plus Transportation impact fee (Single Family Detached Housing) $852.54
Re-inspection FeeCity of Cedar Hills Fee Schedule, effective 07/01/2026: 'Re-inspection Fee — $100.00 — Prior to Re-inspect — Resolution 09-20-2005A.'
$100.00

Review timeline

Plan reviewCedar Hills’s published plan-review target
14–14 business days

How long did your Residential Building Permit permit actually take in Cedar Hills?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Building, Electrical, Mechanical & Plumbing

    All inspections are performed by Sunrise Engineering under contract to the City of Cedar Hills (inspection services are contracted; permit issuance, plan review, and administration remain with the city's own Building Department). Scheduled by phone at 800-560-6151; 24 hours' notice required, no same-day inspections. Caller must have the permit number, site address, and inspection type ready.

  2. 2

    Final Inspection (New Construction)

    Governed by the city's official Final Inspection Checklist (new construction), downloadable from the Building Department page.

See the full Cedar Hills inspection guide — scheduling & re-inspection fees →

Tips

  • Cedar Hills' Building Department is staffed directly by the city (Building Assistant / Zoning-Code Enforcement Officer Sarah Sampson, ext. 204) — it is not contracted to Utah County. Only field inspections are contracted out, to Sunrise Engineering.
  • The Building Permit fee itself has no printed flat-dollar or per-square-foot table on Cedar Hills' fee schedule; it is assessed 'Based on valuation' per the adopted IBC. Applicants should confirm the specific valuation methodology (e.g. ICC Building Valuation Data table) directly with the Building Department at application.
  • A Plan Check Deposit (tiered $300–$3,900 by gross square footage) is required for all construction except basement finishes, due at application — separate from and in addition to the building permit and plan check fees.
  • Sunrise Engineering requires 24 hours' notice for inspections; no same-day inspections are available.
  • The Owner/Builder path is available (write 'Owner/Builder' in the contractor field) but requires filing the state DOPL Owner/Builder Certification form with the city. Owner-builder
  • Cedar Hills' Master Fee Schedule (fetched via 5il.co/34m6a) has no distinct EV charger/EVSE fee category as of 2026-07-19; a standalone charger install falls under the standard $65.00 Temporary & Permanent Power Inspection fee that also covers other residential electrical hookups.

Frequently asked questions

Cedar Hills requires a residential building permit for: New single-family residential construction regulated by the adopted 2021 IRC / 2024 IBC (per Utah Code § 15A-2-103, effective 7/1/2026); Completed Building Permit Application (submitted via the online iworq permit portal or by print application); 2 sets of building plans drawn to scale, including a site plan (north arrow, lot dimensions, setbacks, easements, property lines, water meter/sewer lateral location, driveway/hard-surface locations, retaining walls, and topographical details if slope exceeds 10%); Construction plans: floor plans, footing/foundation details, structural framing, electrical/mechanical/plumbing design details, energy code compliance documentation (RES Check, COMM Check, Manual D/J/S as applicable); Structural calculations stamped by a Utah-licensed structural engineer (roof trusses may be a deferred submittal); Geotechnical report, including slope stability evaluation and retaining wall design, if lot slope exceeds 15%; HOA approval if applicable; Plan Check Deposit, based on gross square footage and/or valuation, due at application. If your project isn't listed, confirm with City of Cedar Hills Building Department (staffed under Public Works; permit administration is independent of Utah County) at (801) 785-9668 x204 before starting work.

Per the City of Cedar Hills Fee Schedule (effective July 1, 2026), the Building Permit fee is valuation-based (assessed per the adopted International Building Code, with no flat published table), plus a Residential Plan Check fee equal to 65% of the building permit fee, a 1% State Fee, and a tiered Plan Check Deposit ($300 to $3,900 depending on gross square footage) due at application.

Cedar Hills has not published its own plan-review turnaround time. Under Utah Code §10-20-909, the city is statutorily required to complete plan review of a one- or two-family dwelling application within 14 business days, following a 3-business-day completeness screening period.

You'll need: Building Permit Requirements Checklist; Building Permit Application. Depending on your project, Cedar Hills may also ask for: Owner/Builder Certification and Agreement to Comply with the Construction Trades Licensing Act. See the required-documents checklist on this page for details on each.

Cedar Hills requires 2 inspection(s) for a residential building permit, in order: Building, Electrical, Mechanical & Plumbing, Final Inspection (New Construction). Schedule each through City of Cedar Hills Building Department (staffed under Public Works; permit administration is independent of Utah County) ((801) 785-9668 x204).

Apply through City of Cedar Hills Building Department (staffed under Public Works; permit administration is independent of Utah County) at 10246 N Canyon Road, Cedar Hills, UT 84062. Phone: (801) 785-9668 x204, email: ssampson@cedarhillsutah.gov. Official information: https://www.cedarhills.org/page/building-department.

Cedar Hills, Utah has adopted: 2021 International Residential Code (IRC) — REMAINS CURRENT, Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 amendment; per Cedar Hills' official Building Permit Requirements form (revised 06/12/2025, live re-checked 2026-07-16): 'Current codes are 2021 IRC, 2021 IBC, 2021 IMC, 2021 IPC, 2020 NEC, 2018 IECC Commercial, 2018 IECC Residential, and 2021 IFGC and Utah State Amendments Title 15A.'; 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition Cedar Hills' Building Permit Requirements form still listed as of live re-check 2026-07-16.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition Cedar Hills' Building Permit Requirements form still listed as of live re-check 2026-07-16.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition Cedar Hills' Building Permit Requirements form still listed as of live re-check 2026-07-16.; 2023 National Electrical Code (NEC) per Utah Code § 15A-2-103(1)(g), unchanged by the 7/1/2026 amendment — Cedar Hills' own Building Permit Requirements form lists '2020 NEC,' which was ALREADY STALE before this code-cycle transition (the statewide-governing NEC edition has been 2023 since an earlier version of the statute). This is a pre-existing discrepancy in the city's own form, independent of the 7/1/2026 IBC/IPC/IMC/IFGC/IECC bump; reported as-published rather than corrected, per grounded-data policy.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes BOTH split editions ('2018 IECC Commercial, 2018 IECC Residential') Cedar Hills' Building Permit Requirements form still listed as of live re-check 2026-07-16 — those 2018 figures were already stale before the 7/1/2026 transition (the prior statewide edition was 2021), compounding with the new 2024 bump.; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition Cedar Hills' Building Permit Requirements form still listed as of live re-check 2026-07-16.; 2024 International Existing Building Code (IEBC) and residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(i)/(n); not itemized on Cedar Hills' Building Permit Requirements form at all, added here per statute since the City's own form omits them.; Utah State Amendments, Utah Code Title 15A — per the same official Building Permit Requirements form.; The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) makes IBC/IPC/IMC/IFGC/IECC/IEBC and residential ISPSC 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Cedar Hills' Building Permit Requirements form (5il.co/26de1, redirecting to a Cedar Hills-hosted PDF) is still marked 'Revised 6/12/2025' and still lists 2021 IBC/IMC/IPC/IFGC, 2020 NEC, and split 2018 IECC. The NEC (2020, should be 2023) and IECC (2018, now a single 2024 edition) entries were already stale under the pre-7/1/2026 version of the statute — this form has not tracked Utah's construction-code cycle for multiple revisions. No newer Cedar Hills-specific code-adoption publication is posted. The current in-force version of Utah Code § 15A-2-103 is linked in the sources below.. Local amendments apply — see the Cedar Hills overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cedar Hills building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Property Access

Cedar Hills's permit history is searchable by address

4,953 permits on record for Cedar Hills, 1977–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.

Start your 7-day free trial7 days free for new customers, then $79/mo · the guide above stays free