Residential Building Permit in Clearfield, Utah

Required for new residential construction, additions, structural alterations, and most repairs to residential buildings in Clearfield, governed by the 2021 IRC. Two complete sets of plans are required for residential submittals.

Verified 2026-07-03 · Source

When you need this permit

  • New single-family or multi-family residential construction
  • Room additions
  • Detached or attached garages
  • Structural modifications or replacement/repair of any structural component
  • Basement finishes and remodels involving moving walls, windows, or doors

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit — valuation $1–$500Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
$23.50
Building Permit — valuation $501–$2,000Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
$23.50 plus $3.05 for each additional $100 or fraction thereof
Building Permit — valuation $2,001–$25,000Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
$69.25 plus $14.00 for each additional $1,000 or fraction thereof
Building Permit — valuation $25,001–$50,000Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
$391.75 plus $10.10 for each additional $1,000 or fraction thereof
Building Permit — valuation $50,001–$100,000Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
$643.75 plus $7.00 for each additional $1,000 or fraction thereof
Building Permit — valuation $100,001–$500,000Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
$993.75 plus $5.60 for each additional $1,000 or fraction thereof
Building Permit — valuation $500,001–$1,000,000Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
$3,233.75 plus $4.75 for each additional $1,000 or fraction thereof
Building Permit — valuation over $1,000,000Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
$5,608.75 plus $3.65 for each additional $1,000 or fraction thereof
Plan Check Fee — Residential (and pools)Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
20% of the building permit fee
Plan Check Deposit — New Residential ConstructionClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
$250
Residential 'Identical Plans' ReviewClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
$100
Re-inspection FeeClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
$47 per hour (minimum charge 0.5 hours for inspections with no fee specifically indicated: $25 each)
Inspection Outside Normal Business HoursClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
$47 per hour, minimum charge of two hours
State SurchargeClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025): 'A 1% state surcharge may be applicable to building permit fees.'
1% may be applicable to building permit fees

Review timeline

Plan review
Not published — contact the department

How long did your Residential Building Permit permit actually take in Clearfield?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation / Footing

    Before concrete pour — verify excavation, forms, rebar, and anchor bolts

  2. 2

    Framing

    After framing, sheathing, and rough-in MEP — before insulation or wall cover

  3. 3

    Insulation

    After insulation installed, before drywall

  4. 4

    Final

    All work complete — certificate of occupancy issued upon passing

See the full Clearfield inspection guide — scheduling & re-inspection fees →

Tips

  • Two complete sets of plans and specifications are required to process a residential building permit in Clearfield.
  • Frost line depth is 30 inches per the Design Criteria and Adopted Codes (rev. 9/29/2023) — all footings must extend below this depth.
  • Seismic Design Category D or D1, ground snow load 43 psf, roof snow load 30 psf, wind design speed 105 mph (Design Criteria and Adopted Codes, rev. 9/29/2023).
  • Online application and payment is available; plans can also be submitted through permits@clearfieldcity.org ('When Do I Need a Building Permit?' handout).
  • Solar panels have no distinct solar permit or fee line in Clearfield — the city's 'When Do I Need a Building Permit?' handout explicitly lists 'Solar panels' among the work requiring a standard building permit, and the Consolidated Fee Schedule (Ordinance 2025-16) contains no separate solar/PV fee category; a solar install is priced under this same general valuation-based Building Permit fee table, re-verified 2026-07-19.

Frequently asked questions

Clearfield requires a residential building permit for: New single-family or multi-family residential construction; Room additions; Detached or attached garages; Structural modifications or replacement/repair of any structural component; Basement finishes and remodels involving moving walls, windows, or doors. If your project isn't listed, confirm with Clearfield City Community Development Department — Building Division at (801) 525-2701 before starting work.

Clearfield's building permit fees are valuation-based per the Consolidated Fee Schedule (Ordinance 2025-16, adopted 6-24-2025): $23.50 for work valued at $500 or less, scaling up to $5,608.75 plus $3.65 per each additional $1,000 over $1,000,000. Residential plan check is 20% of the permit fee, with a $250 plan check deposit required for new construction.

Clearfield does not publish a plan-review timeline for this permit. Contact Clearfield City Community Development Department — Building Division at (801) 525-2701 for current turnaround.

You'll need: Building Permit Application; Construction Plans; Energy Compliance Documentation. Depending on your project, Clearfield may also ask for: Engineered Truss Plans. See the required-documents checklist on this page for details on each.

Clearfield requires 4 inspection(s) for a residential building permit, in order: Foundation / Footing, Framing, Insulation, Final. Schedule each through Clearfield City Community Development Department — Building Division ((801) 525-2701).

Online application and payment is available through the Clearfield City website. Plans can also be submitted via permits@clearfieldcity.org. Contact the Community Development Department at (801) 525-2701 for assistance.

Clearfield, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a), superseding the 2021 IBC. Clearfield's own Design Criteria and Adopted Codes document (rev. 9/29/2023, effective 7/1/2023) still lists the 2021 IBC — live-checked 2026-07-16 via direct PDF fetch of clearfield.city/wp-content/uploads/2023/10/Design-Criteria-Letterhead.pdf, confirming the city's document has NOT been updated to reflect the 7/1/2026 statewide flip. The statute controls regardless of the city document's lag.; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did NOT change this edition in the 7/1/2026 amendment. Matches Clearfield's Design Criteria and Adopted Codes document.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized in Clearfield's own Design Criteria and Adopted Codes document, added here per statute.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d), superseding the 2021 IPC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 IPC — live-checked 2026-07-16, confirming lag. The statute controls.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e), superseding the 2021 IMC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 IMC — live-checked 2026-07-16, confirming lag. The statute controls.; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f), superseding the 2021 IFGC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 IFGC — live-checked 2026-07-16, confirming lag. The statute controls.; 2023 National Electrical Code (NEC) — statewide-mandatory edition per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (the 2023 NEC baseline predates this code cycle). Clearfield's own Design Criteria document (rev. 9/29/2023) lists the 2020 NEC — one edition behind the statewide-mandatory floor, confirmed still unchanged via live PDF fetch 2026-07-16. Per Utah Code § 15A-1-204 (statewide-mandatory construction code), the 2023 NEC governs regardless of Clearfield's own document.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(h) (no residential/commercial split under current law). Supersedes Clearfield's own split scheme: the Design Criteria document (rev. 9/29/2023) separately cited 2021 IECC commercial provisions plus 2015 IECC residential provisions and 2015 IRC Chapter 11, Energy Efficiency, for residential energy — preserved here as history. Live-checked 2026-07-16: Clearfield's Design Criteria document still shows this pre-2024 split scheme; the statute controls.; 2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i), superseding the 2021 IEBC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 IEBC — live-checked 2026-07-16, confirming lag. The statute controls.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(n), superseding the 2021 ISPSC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 ISPSC — live-checked 2026-07-16, confirming lag. The statute controls.; Modular Building Institute (MBI) Standards 1200 and 1205 — statewide per Utah Code § 15A-2-103(1)(o); not listed in Clearfield's own Design Criteria document, added here per statute.; NOTE: A prior commercial-permit checklist PDF (undated content, hosted under a 2021 upload path) lists 2018 IBC/IMC/IPC, 2017 NEC, 2018 IFCI, 2018 IECC as 'Current Codes' — this is superseded by the Design Criteria and Adopted Codes document (rev. 9/29/2023, effective 7/1/2023) cited above, which is the more recent and more specific authority on adopted code editions; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Clearfield's Design Criteria and Adopted Codes document (rev. 9/29/2023, effective 7/1/2023) was live-checked 2026-07-16 via direct PDF fetch and is confirmed still lagging — it verbatim lists 2021 IBC/IMC/IPC/IFGC/IEBC/ISPSC, 2020 NEC, and the pre-2024 split IECC scheme (2021 commercial / 2015 residential). The statewide statute controls over Clearfield's un-updated document.. Local amendments apply — see the Clearfield overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clearfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.