Required for interior tenant-finish and remodel work within an existing commercial building in Clearfield, using the city's dedicated 'Commercial Remodel or Tenant Finish' building permit application — a distinct form from New Commercial Building. Fees follow the same commercial plan-check tiers and valuation-based building permit fee as new commercial construction; Clearfield's checklist sets a stricter plan-stamping threshold (structural work, tenant finish in a shell building, or remodel area over 3,000 sq ft) than new construction.

Verified 2026-07-19 · Source

When you need this permit

  • Interior remodel or tenant-finish work within an existing commercial building, on a lot with completed Pre-Submittal Process (contact Building Department at (801) 525-2700)
  • If area of remodel is larger than 3,000 sq ft, OR is structural, OR is a tenant finish in a shell building: minimum 1 set of original 'wet' stamped plans by a Utah licensed architect and/or engineer, plus 1 copy (2 sets total)
  • 2 sets of complete floor plans for each floor level to be remodeled, including electrical, mechanical, and plumbing information
  • 2 sets of wall details if adding or removing walls
  • For additions: currently adopted IBC & IECC prescriptive requirements shown on the plans
  • Handicap accessibility: the area of improvement must comply with new-construction access requirements, with an accessible route of travel to the remodeled/improved area

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit — valuation-based (same chart as new commercial construction)Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025), 'Building Permit and Development Fees' — General building valuation table; PDF verified directly 2026-07-19. No separate, lower valuation table is published for tenant-improvement/remodel work.
$23.50 for $1–$500, scaling to $5,608.75 plus $3.65 per additional $1,000 over $1,000,000
Plan Check Fee — CommercialClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025): the 'Commercial' plan-check-fee line item is not split between new construction and remodel/tenant-finish — the same tiered percentage applies to both, per direct PDF verification 2026-07-19.
65% of the building permit fee for building value $1–$100,000; 60% for $100,001–$500,000; 50% for $500,001 and greater
Plan Check Deposit — New Construction (commercial rate)Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025): 'Plan check deposit required for new construction: ... Commercial - $250.' The fee schedule's deposit line is labeled 'for new construction' without a separately published lower tenant-improvement rate — confirm with the Building Department whether a smaller tenant-finish scope qualifies for a reduced deposit.
$250
Off-Site Bond — Commercial (where applicable)Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025) — typically applies where a tenant improvement affects site/right-of-way work; interior-only tenant finish may not trigger this fee. Confirm applicability with the Building Department for a given scope.
As per City Engineer's cost estimate
State SurchargeClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025): 'A 1% state surcharge may be applicable to building permit fees.'
1% may be applicable to building permit fees

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Tenant Improvement / Tenant Finish Permit permit actually take in Clearfield?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Framing / Structural (if applicable)

    Interior wall framing and structural connections verified before close-in, where the scope includes structural work or wall additions/removals.

  2. 2

    MEP Rough-In

    Electrical, plumbing, and mechanical rough-in for the tenant space, inspected before walls closed.

  3. 3

    Fire Sprinkler / Fire Alarm (if applicable)

    Fire Department review and approval where sprinkler/alarm systems are modified as part of the tenant finish.

  4. 4

    Final

    All tenant-finish work complete, accessible route of travel to the improved area verified, before occupancy.

See the full Clearfield inspection guide — scheduling & re-inspection fees →

Tips

  • Clearfield uses a dedicated 'Commercial Remodel or Tenant Finish' application form, separate from the New Commercial Building form — use the correct form for your project type.
  • Wet-stamped plans are required for tenant-finish/remodel work specifically when the remodel area exceeds 3,000 sq ft, involves structural work, or is a tenant finish inside a shell building — smaller, non-structural tenant finishes may not require a licensed architect/engineer's wet stamp. Confirm your scope with the Building Department.
  • The fee schedule does not publish a separate, lower valuation chart or plan-check percentage for tenant improvement versus new commercial construction — both use the same tiered 65%/60%/50% commercial plan-check rate.
  • Per the Commercial Plans Submittal Checklist's handicap accessibility section: for remodeling and tenant improvements, the area of improvement must comply with new-construction accessibility requirements, and an accessible route of travel is required to the remodeled/improved area.

Frequently asked questions

Only in certain cases: per the Commercial Remodel Building Permit Checklist, a wet-stamped plan set is required if the remodel area is larger than 3,000 sq ft, involves structural work, or is a tenant finish inside a shell building. Smaller, non-structural tenant finishes may not require this — confirm with the Building Department at (801) 525-2701.

Clearfield bills tenant-improvement/commercial-remodel permits the same way as new commercial construction: a valuation-based Building Permit Fee (Consolidated Fee Schedule, Ord. 2025-16) plus a tiered Commercial Plan Check Fee (65% for value $1–$100,000, 60% for $100,001–$500,000, 50% above $500,001) and a $250 plan check deposit. No separate, lower tenant-improvement fee table is published.

Clearfield does not publish a plan-review timeline for this permit. Contact Clearfield City Community Development Department — Building Division at (801) 525-2701 for current turnaround.

You'll need: Building Permit Application — Commercial Remodel or Tenant Finish; Commercial Remodel Building Permit Checklist; Commercial Plans Submittal Checklist. See the required-documents checklist on this page for details on each.

Clearfield requires 4 inspection(s) for a commercial tenant improvement / tenant finish permit, in order: Framing / Structural (if applicable), MEP Rough-In, Fire Sprinkler / Fire Alarm (if applicable), Final. Schedule each through Clearfield City Community Development Department — Building Division ((801) 525-2701).

Apply through Clearfield City Community Development Department — Building Division at 55 South State Street, Clearfield, UT 84015. Phone: (801) 525-2701, email: permits@clearfieldcity.org. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://clearfield.city/business-development/.

Clearfield, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a), superseding the 2021 IBC. Clearfield's own Design Criteria and Adopted Codes document (rev. 9/29/2023, effective 7/1/2023) still lists the 2021 IBC — live-checked 2026-07-16 via direct PDF fetch of clearfield.city/wp-content/uploads/2023/10/Design-Criteria-Letterhead.pdf, confirming the city's document has NOT been updated to reflect the 7/1/2026 statewide flip. The statute controls regardless of the city document's lag.; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did NOT change this edition in the 7/1/2026 amendment. Matches Clearfield's Design Criteria and Adopted Codes document.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized in Clearfield's own Design Criteria and Adopted Codes document, added here per statute.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d), superseding the 2021 IPC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 IPC — live-checked 2026-07-16, confirming lag. The statute controls.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e), superseding the 2021 IMC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 IMC — live-checked 2026-07-16, confirming lag. The statute controls.; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f), superseding the 2021 IFGC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 IFGC — live-checked 2026-07-16, confirming lag. The statute controls.; 2023 National Electrical Code (NEC) — statewide-mandatory edition per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (the 2023 NEC baseline predates this code cycle). Clearfield's own Design Criteria document (rev. 9/29/2023) lists the 2020 NEC — one edition behind the statewide-mandatory floor, confirmed still unchanged via live PDF fetch 2026-07-16. Per Utah Code § 15A-1-204 (statewide-mandatory construction code), the 2023 NEC governs regardless of Clearfield's own document.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(h) (no residential/commercial split under current law). Supersedes Clearfield's own split scheme: the Design Criteria document (rev. 9/29/2023) separately cited 2021 IECC commercial provisions plus 2015 IECC residential provisions and 2015 IRC Chapter 11, Energy Efficiency, for residential energy — preserved here as history. Live-checked 2026-07-16: Clearfield's Design Criteria document still shows this pre-2024 split scheme; the statute controls.; 2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i), superseding the 2021 IEBC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 IEBC — live-checked 2026-07-16, confirming lag. The statute controls.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(n), superseding the 2021 ISPSC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 ISPSC — live-checked 2026-07-16, confirming lag. The statute controls.; Modular Building Institute (MBI) Standards 1200 and 1205 — statewide per Utah Code § 15A-2-103(1)(o); not listed in Clearfield's own Design Criteria document, added here per statute.; NOTE: A prior commercial-permit checklist PDF (undated content, hosted under a 2021 upload path) lists 2018 IBC/IMC/IPC, 2017 NEC, 2018 IFCI, 2018 IECC as 'Current Codes' — this is superseded by the Design Criteria and Adopted Codes document (rev. 9/29/2023, effective 7/1/2023) cited above, which is the more recent and more specific authority on adopted code editions; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Clearfield's Design Criteria and Adopted Codes document (rev. 9/29/2023, effective 7/1/2023) was live-checked 2026-07-16 via direct PDF fetch and is confirmed still lagging — it verbatim lists 2021 IBC/IMC/IPC/IFGC/IEBC/ISPSC, 2020 NEC, and the pre-2024 split IECC scheme (2021 commercial / 2015 residential). The statewide statute controls over Clearfield's un-updated document.. Local amendments apply — see the Clearfield overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clearfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Clearfield.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.