Skip to main content
PermitBase

Bountiful building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Bountiful, Utah.

Last verified 2026-06-30 · Source · Embed this page’s badge · Version history

Building department

Address
795 South Main Street, Bountiful, UT 84010
Phone
(801) 298-6125
Office hours
Mon–Thu 7:00 AM – 6:00 PM (permits issued until 5:30 PM); closed Fri–Sun

Inspection guide

See how inspections work in Bountiful — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2021 International Residential Code (IRC) with Appendices AE and AQ — residential construction; as adopted by the State of Utah (Utah Code § 15A-2-103(1)(b)/(k)/(c)); unaffected by the 7/1/2026 statute revision, continues in force; Bountiful Design Criteria, rev. Oct 13, 2025
  • 2015 International Residential Code Chapter 11 (residential energy provisions) — per Bountiful Design Criteria, rev. Oct 13, 2025 (statewide residential energy baseline per Utah Code § 15A-2-103)
  • 2024 International Building Code (IBC) with Appendices C and J — commercial construction; Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition
  • 2024 International Mechanical Code (IMC) — commercial; Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition
  • 2024 International Plumbing Code (IPC) — commercial; Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition
  • 2024 International Fuel Gas Code (IFGC) — commercial; Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition
  • 2024 International Energy Conservation Code (IECC) — commercial; Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition
  • 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition
  • 2021 International Fire Code (IFC) — commercial; Bountiful Design Criteria, rev. Oct 13, 2025
  • 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition; CONFIRMED 2026-07-17: the live Bountiful Design Criteria PDF (still dated Rev. October 13, 2025, unchanged/not reissued) explicitly lists '2021 International Swimming Pool and Spa Code' — the city has NOT yet published an updated Design Criteria reflecting the 2024 ISPSC (or the other 2024 commercial code editions) despite the statute taking effect 2026-07-01; the statutory 2024 editions govern by operation of Utah Code regardless, but Bountiful's own summary sheet is stale on this point — call (801) 298-6125 to confirm practical enforcement if this matters for a specific project
  • 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unaffected by the 7/1/2026 statute revision, continues in force; Bountiful Design Criteria, rev. Oct 13, 2025
  • NOTE: Effective July 1, 2026 (now in force) — 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC (residential provisions) replaced the 2021 editions per Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027; text independently re-verified live at le.utah.gov 2026-07-16). The 2021 IRC and 2023 NEC were unaffected and remain in force.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
2units

2 buildings · $1M valuation

Trailing 12 months
45units

12 of 12 months reported · #69 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
9units

9 buildings · $7.1M valuation

5 month(s) reported to Census

Full year 2025
41units

21 buildings · $15.3M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Bountiful operates on a 4-day work week (Mon–Thu, 7:00 AM – 6:00 PM). The office is CLOSED on Fridays, Saturdays, and Sundays. Permits are issued until 5:30 PM. If you need a Friday inspection, request it by the prior Tuesday. (bountifulutah.gov/Building)
  • All Bountiful permits are submitted online through Cityinspect at https://utah.cityinspect.com/register?registration_id=mtpX64oVmk — there is no paper walk-in permit option.
  • Bountiful has its own municipal electric utility: Bountiful City Light & Power (BCLP). For solar/net-metering and electrical service, contact BCLP directly — NOT Rocky Mountain Power. This is critical for solar permitting.
  • Seismic Design Category D2 and 30-inch frost depth apply to all construction in Bountiful. Design wind speed: 140 mph (Vasd=108 mph), Exposure B. (Bountiful Design Criteria, rev. Oct 13, 2025)
  • By Utah law (UCA 10-6-160), if Bountiful cannot provide a building inspection within 3 business days of request, you may use authorized third-party inspectors: WC-3 Code Consultants (801) 547-8133, North Salt Lake City Building Dept (801) 335-8721, or Farmington City Building Dept (801) 939-9214. Notify the city first. (Building Inspection Policy, rev. Aug 19, 2024)
  • Bountiful City Ordinance 2023-01 (eff. May 9, 2023) remains the most recent ordinance to publish a detailed, itemized Schedule of Rates and Fees (full 26-page Exhibit A verified verbatim 2026-07-17, all Building/Engineering permit fee lines confirmed unchanged). The FY2025-2026 budget (Ord. 2025-09, adopted June 24, 2025) and the newer FY2026-2027 budget (Ord. 2026-06, adopted June 9, 2026, effective July 1, 2026 — read in full 2026-07-17) both incorporate 'rates and fees' by reference in the budget's preparation without publishing any updated building-permit/engineering fee table of their own. Call (801) 298-6125 to confirm current fees.
  • South Davis Metro Fire Agency provides fire services. The SDMF impact fee of $644 per residential unit is collected as part of the building permit process. (sdmetrofire.org; Ord. 2023-01)

Comparable nearby cities

Layton
Both in Davis County18 shared permit types~15 mi away
Compare fees →
Draper
19 shared permit typesBoth on the 2024 International Existing Building Code (IEBC)~26 mi away
Compare fees →
Clearfield
Both in Davis County17 shared permit types~18 mi away
Compare fees →