Alpine building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Alpine, Utah.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
20 North Main, Alpine, UT 84004
Phone
(801) 756-6347
Office hours
Mon–Fri 8:00 AM – 5:00 PM

Inspection guide

See how inspections work in Alpine — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2021 International Residential Code (IRC) — REMAINS CURRENT, Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 amendment; per Alpine City's official Building Permit Instructions (New Home Form #2, revised 4/9/2025): 'Structural design criteria must conform to the 2021 IRC.'
  • 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition Alpine City's official Building Permit Instructions (New Home Form #2, revised 4/9/2025) still cited as of live-check 2026-07-16: 'I understand that it is my responsibility to comply with Alpine City Zoning Ordinances and the I.B.C. 2021 code (including Appendix C and J) as adopted by Alpine City.'
  • 2021 IRC Appendix AL (Building Permit Fees) as amended by Alpine City — Alpine's Consolidated Fee Schedule (effective November 11, 2025), Appendix B, is expressly titled 'Building Permit Fees (2021 IRC Appendix AL, as amended)' and cites https://codes.iccsafe.org/content/IRC2021P2/appendix-al-permit-fees. This is a local fee-table appendix reference, not the § 15A-2-103 construction-code edition, and is unaffected by the 7/1/2026 code-cycle update.
  • Utah statewide baseline construction code editions per Utah Code § 15A-2-103, effective 7/1/2026 (superseded 1/1/2027): 2024 IPC (§(1)(d)), 2024 IMC (§(1)(e)), 2024 IFGC (§(1)(f)), 2024 IECC as a single unsplit statewide edition (§(1)(h)), 2024 IEBC (§(1)(i)), and the residential provisions of the 2024 ISPSC (§(1)(n)) — none separately itemized in Alpine's own published materials (Consolidated Fee Schedule, Building Permit Instructions, Building Department page); added here per statute since Alpine's own documents omit them. The 2023 NEC (§(1)(g)) also applies statewide but is likewise not separately restated by Alpine — unchanged by the 7/1/2026 amendment.
  • NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Alpine City's official Building Permit Instructions (New Home Form #2) — the sole cited source for Alpine's code editions — was live-checked 2026-07-16 by re-fetching the PDF directly and remains dated 'Revised 4/9/2025' with no update: it still states 'Structural design criteria must conform to the 2021 IRC' (correct, unchanged) and 'the I.B.C. 2021 code (including Appendix C and J) as adopted by Alpine City' (STALE — Alpine has not published an updated form reflecting the 2024 IBC as of this date). No newer Alpine-specific building-code publication was found on alpineut.gov. The Utah Code § 15A-2-103 citation added to the sources array below points to the current in-force version link.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
2units

2 buildings · $5M valuation

Trailing 12 months
2units

1 of 12 months reported · #90 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
6units

6 buildings · $13.3M valuation

5 month(s) reported to Census

Full year 2025
21units

21 buildings · $23.1M valuation

1 of 12 months reported; Census estimates include imputation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Alpine City's Building Department is genuinely independent — it is not contracted to Utah County. Alpine operates its own Building Department (20 North Main, Alpine, UT 84004), issues its own permits and applications, and publishes its own Consolidated Fee Schedule (effective November 11, 2025), distinct from Utah County Community Development's process.
  • All structures in Alpine, regardless of size, require a building permit, per Alpine's official Building Department page.
  • Alpine's valuation-based Building Permit Fee (Appendix B) is explicitly the 2021 IRC Appendix AL fee table, 'as amended' by the City — cross-check the ICC source (https://codes.iccsafe.org/content/IRC2021P2/appendix-al-permit-fees) if verifying independently.
  • Construction valuation for the fee table uses Alpine's Appendix A, a 2008-vintage ICC Building Valuation Data 'Square Foot Construction Costs' table (per its footer citing 'building safety journal, January-February 2008') — this is an older base valuation table than some neighboring jurisdictions' more recent tables; e.g., R-3 one- and two-family Type VB is $101.95/sq ft under Alpine's table.
  • A 1% state surcharge (Utah Code) applies to every building permit; 80% is remitted to the State, 20% retained by Alpine for administrative cost.
  • No jurisdiction-published plan-review turnaround time was located in Alpine's own official sources (Building Department page, Consolidated Fee Schedule, Building Permit Instructions, or FY2026 Citizen's Budget Report) as of 2026-07-08. For the residential-building-permit (new home) permit type only, Utah Code § 10-20-909 supplies a statutory ceiling — a 3-business-day completeness-screening period followed by a 14-business-day plan review for one- or two-family dwellings/townhomes (17 business days total) — used here as the grounded fallback. This statute is scoped only to dwelling permits and was NOT applied to the Retaining Wall or Minor Trade permit types, which remain honestly null with a note.
  • Retaining walls over 4 feet in exposed height require a separate permit under Development Code § 3.32; walls/rock features at or above certain slope thresholds require engineering review regardless of height.
  • A new-home building permit becomes null and void if construction is not commenced within 180 days, or is suspended/abandoned for 180 days — reinstatement costs half the original combined building/electrical/plumbing/heating fee plus a new infrastructure protection bond.

Comparable nearby cities

Highland
Both in Utah County10 shared permit types~3 mi away
Compare fees →
Orem
Both in Utah County10 shared permit types~12 mi away
Compare fees →
Eagle Mountain
Both in Utah County10 shared permit types~16 mi away
Compare fees →