Skip to main content
PermitBase

Highland building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Highland, Utah.

Last verified 2026-07-07 · Source · Embed this page’s badge · Version history

Building department

Address
5400 W Civic Center Drive, Suite 1, Highland, UT 84003
Phone
(801) 772-4516
Office hours
Mon–Thu 8:00 AM – 5:00 PM (closed Friday; inspections available Mon–Thu 8:00 AM–6:00 PM by appointment via My City Inspector or (801) 772-4516, scheduled at least 24 hours in advance)

Inspection guide

See how inspections work in Highland — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2021 International Residential Code (IRC) — adopted, effective July 1, 2026 per Highland City's official Building Division page; the city states 'any submittals after July 1, 2026' must be designed to these standards.
  • 2024 International Building Code (IBC) — adopted, effective July 1, 2026 per Highland City's official Building Division page.
  • 2023 National Electrical Code (NEC) — adopted, effective July 1, 2026 per Highland City's official Building Division page.
  • Other 2024 International Codes (IPC, IMC, IEBC, IECC) — Highland's Building Division page references adoption of 'other 2024 codes' alongside the 2024 IBC and 2023 NEC effective July 1, 2026, consistent with the statewide framework under Utah Code § 15A-1-204/Title 15A, but does not itemize each code title individually by name on the page; only the IRC, IBC, and NEC editions are explicitly named.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
4units

4 buildings · $2.9M valuation

Trailing 12 months
59units

12 of 12 months reported · #63 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
21units

21 buildings · $18.1M valuation

5 month(s) reported to Census

Full year 2025
76units

76 buildings · $66.1M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Highland City Building Division is open Mon–Thu 8:00 AM–5:00 PM — closed Fridays; inspections run Mon–Thu 8:00 AM–6:00 PM by appointment, scheduled at least 24 hours in advance via My City Inspector or (801) 772-4516.
  • Unlike Murray, Highland pegs both its Permit Fee and Plan Check Fee directly to the International Code Council's own fee schedule rather than publishing a self-contained valuation table.
  • Highland's deposit structure: $500 (new Home or Commercial plan submittal), $45 (Accessory Structure/Addition/Basement/Remodel), $90 (Solar), $100 (Swimming Pool) — confirmed unchanged between the FY2025 (adopted 3/18/25) and FY2026 (adopted 5/5/26) Comprehensive Fee Schedules.
  • Fence ($25), Retaining Wall (>4 ft or surcharge, $25 application), Pool, Basement Finish, and ADU permits are each explicitly called out in the city's official 'Notice to All Builders and Owners' as SEPARATE from the general building permit — easy to under-scope a project by assuming one permit covers all of these.
  • Effective July 1, 2026: Highland adopts the 2024 IBC and 2023 NEC; the 2021 IRC continues in force, per the city's own Building Division page. A local amendment (effective Dec 3, 2024) requires automatic fire sprinklers in all conditions allowed by state fire code, including residences over 10,000 sq ft.
  • If a homebuyer purchases a property with unpermitted renovations, additions, or public-property encroachments, liability transfers to the new homeowner regardless of awareness, per the official Notice to All Builders and Owners.
  • No jurisdiction-published plan-review turnaround time (in business/calendar days) was located for any Highland permit type in official sources as of 2026-07-07 — the only turnaround figure published is the 24-hour minimum advance-notice requirement for scheduling inspections; all permit-type reviewTimelineDays fields are honestly null with a note rather than estimated.

Comparable nearby cities

Orem
Both in Utah County11 shared permit types~10 mi away
Compare fees →
Eagle Mountain
Both in Utah County11 shared permit types~14 mi away
Compare fees →
Cedar Hills
Both in Utah County10 shared permit types~2 mi away
Compare fees →