Skip to main content
PermitBase

Commercial Building Permit in Highland, Utah

Required for new commercial (ground-up/shell) construction in Highland. Both the Permit Fee and Plan Check Fee are valuation-based, set 'As Set Forth by the International Code Council' — the same ICC-referenced framework used for residential permits — but new commercial construction is tracked under its own dedicated 'Commercial' $500.00 plan submittal deposit line (confirmed identically in both the FY2025 and FY2026 Highland City Comprehensive Fee Schedules), distinct from the $45.00 tier that groups residential Accessory Structure/Remodel/Addition/Basement work. Highland has not published a dedicated document checklist specifically for new commercial construction (unlike its separate Commercial Tenant Improvement checklist), and Commercial Impact Fees are not a fixed published dollar figure — the fee schedule states only that they are set 'as set forth by the current impact fee study,' so confidence is marked partial pending that missing figure.

Reviewed 2026-07-19 · Source

When you need this permit

  • New commercial (ground-up/shell) construction in Highland
  • $500.00 Commercial plan submittal deposit, credited toward the final permit fee
  • Permit Fee and Plan Check Fee computed 'As Set Forth by the International Code Council' (valuation-based)
  • Compliance with the 2024 International Building Code (IBC) and other adopted 2024 International Codes, effective July 1, 2026, per Highland's Building Division page
  • Architectural Design Review approval (Planning Division) for commercial and other non-residential buildings, per the city's Applications & Fees page
  • Site Plan Application review (Planning Division) for non-residential developments, which 'may be combined with architectural design review of buildings' per the Applications & Fees page
  • 1% State Tax on the total building permit fee

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Commercial Plan Submittal DepositHighland City Comprehensive Fee Schedule, FY2025 (§ Building Permit Deposits: 'Commercial ... $500.00') and FY2026 (§ Building Permit Bonds, Deposits, and Permit Fees, 'Deposit' table: 'Commercial ... $500.00'). Listed as its own distinct line item, separate from the $45.00 'Accessory Structure, Remodel, Addition, or Basement' tier and matching (but tracked separately from) the $500.00 'Home' tier.
$500.00
Permit FeeHighland City Comprehensive Fee Schedule, FY2025 and FY2026, 'Building Permits'/'Permit Fees' section: 'Permit Fee ... As set forth by the International Code Council.' Applies to both residential and commercial submittals; Highland does not publish its own flat/valuation table.
As Set Forth by the International Code Council (valuation-based; no fixed city table published)
Plan Check FeeHighland City Comprehensive Fee Schedule, FY2025 and FY2026: 'Plan Check Fee ... As set forth by the International Code Council.'
As Set Forth by the International Code Council
State TaxHighland City Comprehensive Fee Schedule, FY2025 and FY2026: 'State Tax ... 1% of Total Building Permit Fee.'
1% of total building permit fee
Commercial Impact FeesHighland City Comprehensive Fee Schedule, FY2025 (§ Commercial Impact Fees: 'Fee schedule as set forth by current impact fee study') and FY2026 (§ Commercial Impact Fees table: 'Commercial | As Set Forth by the Current Impact Fee Study | TBD'). Unlike the Residential Impact Fees section, no per-category dollar amounts are itemized for commercial in either fee schedule — genuinely not published, not omitted by choice.
As Set Forth by the Current Impact Fee Study (no fixed dollar figure published)
Commercial Culinary Water Meter (if new commercial water service is required)Highland City Comprehensive Fee Schedule, FY2025 and FY2026, § Miscellaneous Building Fees, 'Culinary Water Meter' table: 'Commercial | 1 1/2 inch | $2,615.60' and 'Commercial | 2 inches | $2,904.72' (vs. Residential 3/4 inch $470.65 / 1 inch $548.30 in the FY2026 schedule).
1 1/2 inch: $2,615.60; 2 inches: $2,904.72
Reinspection FeeHighland City Comprehensive Fee Schedule, FY2025 and FY2026: 'Reinspection Fee ... $100.00.'
$100.00
Same-Day Inspection Cancellation FeeHighland City Comprehensive Fee Schedule, FY2025 and FY2026: 'Same-day Inspection Cancellation Fee ... $65.00.'
$65.00

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit permit actually take in Highland?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Scheduled Inspections (Building/Electrical/Mechanical/Plumbing)

    Scheduled Monday through Thursday, 8:00 AM–6:00 PM, via the My City Inspector online portal or by calling (801) 772-4516; all inspections must be scheduled at least 24 hours in advance, per Highland's official Building Inspections FAQ. No commercial-specific inspection sequence beyond this general scheduling framework is separately published.

See the full Highland inspection guide — scheduling & re-inspection fees →

Tips

  • Highland's Comprehensive Fee Schedule tracks new commercial construction under its own 'Commercial' $500.00 deposit line — the same dollar figure as the 'Home' (residential) tier, but listed as a distinct category, confirmed unchanged between the FY2025 and FY2026 fee schedules.
  • Commercial Impact Fees are NOT a fixed published dollar figure — the fee schedule states only 'as set forth by the current impact fee study,' so applicants should confirm the current impact-fee amount directly with the Building Division before budgeting.
  • A new commercial building in Highland typically requires Planning Division approvals (Architectural Design Review and/or Site Plan Application) in addition to the Building Division's permit — confirm scope with the Community Development Department (801-772-4506) before submitting plans.
  • Unlike its Commercial Tenant Improvement checklist, Highland has not published a dedicated document checklist specifically for new commercial (ground-up/shell) construction as of 2026-07-19.

Frequently asked questions

Highland requires a commercial building permit for: New commercial (ground-up/shell) construction in Highland; $500.00 Commercial plan submittal deposit, credited toward the final permit fee; Permit Fee and Plan Check Fee computed 'As Set Forth by the International Code Council' (valuation-based); Compliance with the 2024 International Building Code (IBC) and other adopted 2024 International Codes, effective July 1, 2026, per Highland's Building Division page; Architectural Design Review approval (Planning Division) for commercial and other non-residential buildings, per the city's Applications & Fees page; Site Plan Application review (Planning Division) for non-residential developments, which 'may be combined with architectural design review of buildings' per the Applications & Fees page; 1% State Tax on the total building permit fee. If your project isn't listed, confirm with Highland City Building Division (Community Development Department) at (801) 772-4516 before starting work.

Yes — per the Comprehensive Fee Schedule's Commercial Impact Fees section, commercial projects are charged 'as set forth by the current impact fee study' rather than a fixed dollar figure; applicants should confirm the current amount with the Building Division at (801) 772-4516 before budgeting.

Highland does not publish a plan-review timeline for this permit. Contact Highland City Building Division (Community Development Department) at (801) 772-4516 for current turnaround.

You'll need: Building Permit Application (My City Inspector portal); Architectural Design Review Application; Site Plan Application; Construction Plans and Engineering (structural/electrical/mechanical/plumbing). See the required-documents checklist on this page for details on each.

Highland requires 1 inspection(s) for a commercial building permit, in order: Scheduled Inspections (Building/Electrical/Mechanical/Plumbing). Schedule each through Highland City Building Division (Community Development Department) ((801) 772-4516).

Apply through Highland City Building Division (Community Development Department) at 5400 W Civic Center Drive, Suite 1, Highland, UT 84003. Phone: (801) 772-4516, email: jnelson@highlandut.gov. Office hours: Mon–Thu 8:00 AM – 5:00 PM (closed Friday; inspections available Mon–Thu 8:00 AM–6:00 PM by appointment via My City Inspector or (801) 772-4516, scheduled at least 24 hours in advance). Official information: https://www.highlandut.gov/96/Building.

Highland, Utah has adopted: 2021 International Residential Code (IRC) — adopted, effective July 1, 2026 per Highland City's official Building Division page; the city states 'any submittals after July 1, 2026' must be designed to these standards.; 2024 International Building Code (IBC) — adopted, effective July 1, 2026 per Highland City's official Building Division page.; 2023 National Electrical Code (NEC) — adopted, effective July 1, 2026 per Highland City's official Building Division page.; Other 2024 International Codes (IPC, IMC, IEBC, IECC) — Highland's Building Division page references adoption of 'other 2024 codes' alongside the 2024 IBC and 2023 NEC effective July 1, 2026, consistent with the statewide framework under Utah Code § 15A-1-204/Title 15A, but does not itemize each code title individually by name on the page; only the IRC, IBC, and NEC editions are explicitly named.. Local amendments apply — see the Highland overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Highland building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Highland.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.