Commercial Building Permit — Highland, Utah · Requirements sheet
Reviewed 2026-07-19 · Source: https://highlandut.gov/DocumentCenter/View/9212/FY2026-Fee-Schedule---Adopted-61725
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit in Highland, Utah
Required for new commercial (ground-up/shell) construction in Highland. Both the Permit Fee and Plan Check Fee are valuation-based, set 'As Set Forth by the International Code Council' — the same ICC-referenced framework used for residential permits — but new commercial construction is tracked under its own dedicated 'Commercial' $500.00 plan submittal deposit line (confirmed identically in both the FY2025 and FY2026 Highland City Comprehensive Fee Schedules), distinct from the $45.00 tier that groups residential Accessory Structure/Remodel/Addition/Basement work. Highland has not published a dedicated document checklist specifically for new commercial construction (unlike its separate Commercial Tenant Improvement checklist), and Commercial Impact Fees are not a fixed published dollar figure — the fee schedule states only that they are set 'as set forth by the current impact fee study,' so confidence is marked partial pending that missing figure.
Reviewed 2026-07-19 · Source
When you need this permit
- New commercial (ground-up/shell) construction in Highland
- $500.00 Commercial plan submittal deposit, credited toward the final permit fee
- Permit Fee and Plan Check Fee computed 'As Set Forth by the International Code Council' (valuation-based)
- Compliance with the 2024 International Building Code (IBC) and other adopted 2024 International Codes, effective July 1, 2026, per Highland's Building Division page
- Architectural Design Review approval (Planning Division) for commercial and other non-residential buildings, per the city's Applications & Fees page
- Site Plan Application review (Planning Division) for non-residential developments, which 'may be combined with architectural design review of buildings' per the Applications & Fees page
- 1% State Tax on the total building permit fee
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Scheduled Inspections (Building/Electrical/Mechanical/Plumbing)
Scheduled Monday through Thursday, 8:00 AM–6:00 PM, via the My City Inspector online portal or by calling (801) 772-4516; all inspections must be scheduled at least 24 hours in advance, per Highland's official Building Inspections FAQ. No commercial-specific inspection sequence beyond this general scheduling framework is separately published.
See the full Highland inspection guide — scheduling & re-inspection fees →
Tips
- Highland's Comprehensive Fee Schedule tracks new commercial construction under its own 'Commercial' $500.00 deposit line — the same dollar figure as the 'Home' (residential) tier, but listed as a distinct category, confirmed unchanged between the FY2025 and FY2026 fee schedules.
- Commercial Impact Fees are NOT a fixed published dollar figure — the fee schedule states only 'as set forth by the current impact fee study,' so applicants should confirm the current impact-fee amount directly with the Building Division before budgeting.
- A new commercial building in Highland typically requires Planning Division approvals (Architectural Design Review and/or Site Plan Application) in addition to the Building Division's permit — confirm scope with the Community Development Department (801-772-4506) before submitting plans.
- Unlike its Commercial Tenant Improvement checklist, Highland has not published a dedicated document checklist specifically for new commercial (ground-up/shell) construction as of 2026-07-19.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Highland building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Highland.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Highland
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Highland project checklist
Describe your project once and get every permit, document, and fee it triggers in Highland — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →