Fire Sprinkler System Permit / Plan Review in Highland, Utah

Highland City does not publish a distinct fire sprinkler permit fee — a full-text review of the FY2026 Comprehensive Fee Schedule (22 pages, adopted 5/5/26) found no 'sprinkler' or 'fire protection system' fee line item; a sprinkler system is filed and reviewed as part of the underlying Building Permit Application, billed at the same ICC valuation-based Permit Fee/Plan Check Fee used for the rest of the project. Highland's own local amendment (effective December 3, 2024, per the Building Division page) requires automatic fire sprinklers 'in all conditions allowed by state fire code, including for residences over 10,000 square feet' — broader than a purely commercial trigger — but this is enforced through the general Building Permit process, not a separate sprinkler permit. Fire code enforcement for Highland is provided by Lone Peak Fire District (part of the Lone Peak Public Safety District, also serving Alpine), per Highland's own official Fire, Rescue, and Emergency Medical Services page: 'Highland City contracts with the Lone Peak Fire District to provide fire protection and EMS services to the residents of Highland.' A direct check of Lone Peak Fire District's own website (lonepeakfire.com, checked 2026-07-21) found no published fire sprinkler permit application, fee schedule, or plan-review guidance of any kind. The Utah State Fire Marshal's Office separately publishes a statewide Automatic Fire Sprinkler Plan Submittal Form with its own published fee ($75 minimum, or $0.022 per square foot of review scope, whichever is greater, confirmed by direct read of the form 2026-07-21) — cited here as the best available grounded fee reference in the absence of any Lone Peak-published figure — but the State Fire Marshal's own enforcement jurisdiction under Utah Code § 53-7-104(3) is limited to areas outside corporate cities/fire districts, state/school property, and certain institutional occupancies (or by request of the local fire official), so it is not certain this state-level fee is what Lone Peak Fire District actually charges for an ordinary sprinkler system in Highland. Applicants should confirm directly with Lone Peak Fire District (801-763-5365) which review path and fee apply to a specific project.

Reviewed 2026-07-21 · Source

When you need this permit

  • Automatic fire sprinkler system installation, where required by Highland's local ordinance (effective December 3, 2024) requiring sprinklers 'in all conditions allowed by state fire code, including for residences over 10,000 square feet,' per the Building Division page
  • Sprinkler system plans filed and reviewed as part of the underlying Building Permit Application (My City Inspector portal) — Highland does not publish a standalone sprinkler-permit application separate from the Building Permit
  • A water supply analysis (static pressure, residual pressure, and flow, in gpm) must be provided during design, per Utah Admin. Code R710-4-5
  • Hydraulic calculations and, where required, seismic calculations and material submittals must accompany the sprinkler drawings

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Permit Fee (covers sprinkler system, filed with underlying Building Permit)Highland City Comprehensive Fee Schedule, FY2026, adopted 5/5/26, 'Building Permit Bonds, Deposits, and Permit Fees' section: 'Permit Fee ... As Set Forth by the International Code Council.' No distinct sprinkler/fire-protection line item exists anywhere in the 22-page fee schedule (full text reviewed 2026-07-21); sprinkler installation is billed under this same Permit Fee as the rest of the project.
As Set Forth by the International Code Council (valuation-based; no fixed city table published)
Automatic Fire Sprinkler Plan Review (Utah State Fire Marshal's Office)Utah State Fire Marshal's Office, Automatic Fire Sprinkler Plan Submittal Form: 'SQUARE FEET x .022$ = $______. Note: Minimum fee is $75.' (confirmed by direct read of the form, 2026-07-21). Cited as the best available grounded fee reference — Highland's own Comprehensive Fee Schedule has no sprinkler line item, and Lone Peak Fire District (Highland's local fire authority) publishes no fee schedule of its own; whether this state-level fee is what actually applies to a Highland project has not been independently confirmed with Lone Peak Fire District.
Greater of $75.00 minimum or $0.022 per square foot of the scope of work reviewed

Review timeline

Plan review
Not published — contact the department

How long did your Fire Sprinkler System Permit / Plan Review permit actually take in Highland?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Fire Sprinkler Inspection and Testing

    Inspection and acceptance testing of the installed system per NFPA 13, 13R, 13D, 20, and 24 (2022 Edition), adopted by Utah Administrative Rule R710-5, 'Automatic Fire Sprinkler System Inspection and Testing.'

See the full Highland inspection guide — scheduling & re-inspection fees →

Tips

  • Lone Peak Fire District, not Highland City's own Building Division, is the fire authority for Highland — per Highland's official Fire, Rescue, and EMS page, 'Highland City contracts with the Lone Peak Fire District to provide fire protection and EMS services.' Confirm sprinkler plan review and fees directly with Lone Peak Fire District (5582 Parkway West Drive, Highland, UT 84003; 801-763-5365) before assuming a specific fee applies.
  • Highland's own local fire-sprinkler ordinance (effective 12/3/2024) is broader than many peer cities' — sprinklers are required 'in all conditions allowed by state fire code,' explicitly including single-family residences over 10,000 square feet, not just commercial buildings.
  • A water supply analysis (static pressure, residual pressure, flow) is a mandatory submittal component under Utah Admin. Code R710-4-5 — obtain this from the water purveyor, a flow test, or contract specifications before submitting sprinkler plans.
  • This fire sprinkler review is separate from, and in addition to, Highland's own Residential, Commercial, or Commercial Tenant Improvement Building Permit process for the same project.

Frequently asked questions

Highland requires a fire sprinkler system permit / plan review for: Automatic fire sprinkler system installation, where required by Highland's local ordinance (effective December 3, 2024) requiring sprinklers 'in all conditions allowed by state fire code, including for residences over 10,000 square feet,' per the Building Division page; Sprinkler system plans filed and reviewed as part of the underlying Building Permit Application (My City Inspector portal) — Highland does not publish a standalone sprinkler-permit application separate from the Building Permit; A water supply analysis (static pressure, residual pressure, and flow, in gpm) must be provided during design, per Utah Admin. Code R710-4-5; Hydraulic calculations and, where required, seismic calculations and material submittals must accompany the sprinkler drawings. If your project isn't listed, confirm with Highland City Building Division (Community Development Department) at (801) 772-4516 before starting work.

No. Highland City's Comprehensive Fee Schedule (FY2026, full text reviewed 2026-07-21) has no distinct sprinkler-related fee line item — a sprinkler system is billed under the general ICC valuation-based Building Permit Fee. Fire code enforcement in Highland is provided by Lone Peak Fire District, which as of this review publishes no fire sprinkler permit fee schedule of its own on lonepeakfire.com.

Highland does not publish a plan-review timeline for this permit. Contact Highland City Building Division (Community Development Department) at (801) 772-4516 for current turnaround.

You'll need: Building Permit Application (My City Inspector portal); Automatic Fire Sprinkler Plan Submittal Form. See the required-documents checklist on this page for details on each.

Highland requires 1 inspection(s) for a fire sprinkler system permit / plan review, in order: Fire Sprinkler Inspection and Testing. Schedule each through Highland City Building Division (Community Development Department) ((801) 772-4516).

Apply through Highland City Building Division (Community Development Department) at 5400 W Civic Center Drive, Suite 1, Highland, UT 84003. Phone: (801) 772-4516, email: jnelson@highlandut.gov. Office hours: Mon–Thu 8:00 AM – 5:00 PM (closed Friday; inspections available Mon–Thu 8:00 AM–6:00 PM by appointment via My City Inspector or (801) 772-4516, scheduled at least 24 hours in advance). Official information: https://www.highlandut.gov/96/Building.

Highland, Utah has adopted: 2021 International Residential Code (IRC) — adopted, effective July 1, 2026 per Highland City's official Building Division page; the city states 'any submittals after July 1, 2026' must be designed to these standards.; 2024 International Building Code (IBC) — adopted, effective July 1, 2026 per Highland City's official Building Division page.; 2023 National Electrical Code (NEC) — adopted, effective July 1, 2026 per Highland City's official Building Division page.; Other 2024 International Codes (IPC, IMC, IEBC, IECC) — Highland's Building Division page references adoption of 'other 2024 codes' alongside the 2024 IBC and 2023 NEC effective July 1, 2026, consistent with the statewide framework under Utah Code § 15A-1-204/Title 15A, but does not itemize each code title individually by name on the page; only the IRC, IBC, and NEC editions are explicitly named.. Local amendments apply — see the Highland overview page for the full list.

The Utah State Fire Marshal's Office publishes a statewide fee of $75 minimum, or $0.022 per square foot of the reviewed scope of work if greater. Whether this specific fee applies to a given Highland project depends on which fire authority conducts the review — confirm with Lone Peak Fire District directly at (801) 763-5365.