Fire Sprinkler System Permit / Plan Review in Highland, Utah
Highland City does not publish a distinct fire sprinkler permit fee — a full-text review of the FY2026 Comprehensive Fee Schedule (22 pages, adopted 5/5/26) found no 'sprinkler' or 'fire protection system' fee line item; a sprinkler system is filed and reviewed as part of the underlying Building Permit Application, billed at the same ICC valuation-based Permit Fee/Plan Check Fee used for the rest of the project. Highland's own local amendment (effective December 3, 2024, per the Building Division page) requires automatic fire sprinklers 'in all conditions allowed by state fire code, including for residences over 10,000 square feet' — broader than a purely commercial trigger — but this is enforced through the general Building Permit process, not a separate sprinkler permit. Fire code enforcement for Highland is provided by Lone Peak Fire District (part of the Lone Peak Public Safety District, also serving Alpine), per Highland's own official Fire, Rescue, and Emergency Medical Services page: 'Highland City contracts with the Lone Peak Fire District to provide fire protection and EMS services to the residents of Highland.' A direct check of Lone Peak Fire District's own website (lonepeakfire.com) found no published fire sprinkler permit application, fee schedule, or plan-review guidance of any kind. The Utah State Fire Marshal's Office separately publishes a statewide Automatic Fire Sprinkler Plan Submittal Form with its own published fee ($75 minimum, or $0.022 per square foot of review scope, whichever is greater, confirmed by direct read of the form 2026-07-21) — cited here as the best available grounded fee reference in the absence of any Lone Peak-published figure — but the State Fire Marshal's own enforcement jurisdiction under Utah Code § 53-7-104(3) is limited to areas outside corporate cities/fire districts, state/school property, and certain institutional occupancies (or by request of the local fire official), so it is not certain this state-level fee is what Lone Peak Fire District actually charges for an ordinary sprinkler system in Highland. Applicants should confirm directly with Lone Peak Fire District (801-763-5365) which review path and fee apply to a specific project.
Reviewed 2026-07-21 · Source
When you need this permit
- Automatic fire sprinkler system installation, where required by Highland's local ordinance (effective December 3, 2024) requiring sprinklers 'in all conditions allowed by state fire code, including for residences over 10,000 square feet,' per the Building Division page
- Sprinkler system plans filed and reviewed as part of the underlying Building Permit Application (My City Inspector portal) — Highland does not publish a standalone sprinkler-permit application separate from the Building Permit
- A water supply analysis (static pressure, residual pressure, and flow, in gpm) must be provided during design, per Utah Admin. Code R710-4-5
- Hydraulic calculations and, where required, seismic calculations and material submittals must accompany the sprinkler drawings
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Highland City Comprehensive Fee Schedule, FY2026, adopted 5/5/26, 'Building Permit Bonds, Deposits, and Permit Fees' section: 'Permit Fee... Show full citationHide
Highland City Comprehensive Fee Schedule, FY2026, adopted 5/5/26, 'Building Permit Bonds, Deposits, and Permit Fees' section: 'Permit Fee... As Set Forth by the International Code Council.' No distinct sprinkler/fire-protection line item exists anywhere in the 22-page fee schedule (full text reviewed 2026-07-21); sprinkler installation is billed under this same Permit Fee as the rest of the project.Utah State Fire Marshal's Office, Automatic Fire Sprinkler Plan Submittal Form: 'SQUARE FEET x .022$ = $______. Show full citationHide
Utah State Fire Marshal's Office, Automatic Fire Sprinkler Plan Submittal Form: 'SQUARE FEET x .022$ = $______. Note: Minimum fee is $75.' (confirmed by direct read of the form, 2026-07-21). Cited as the best available grounded fee reference — Highland's own Comprehensive Fee Schedule has no sprinkler line item, and Lone Peak Fire District (Highland's local fire authority) publishes no fee schedule of its own; whether this state-level fee is what actually applies to a Highland project has not been independently confirmed with Lone Peak Fire District.Review timeline
Inspection process
- 1
Fire Sprinkler Inspection and Testing
Inspection and acceptance testing of the installed system per NFPA 13, 13R, 13D, 20, and 24 (2022 Edition), adopted by Utah Administrative Rule R710-5, 'Automatic Fire Sprinkler System Inspection and Testing.'
See the full Highland inspection guide — scheduling & re-inspection fees →
Tips
- Lone Peak Fire District, not Highland City's own Building Division, is the fire authority for Highland — per Highland's official Fire, Rescue, and EMS page, 'Highland City contracts with the Lone Peak Fire District to provide fire protection and EMS services.' Confirm sprinkler plan review and fees directly with Lone Peak Fire District (5582 Parkway West Drive, Highland, UT 84003; 801-763-5365) before assuming a specific fee applies.
- Highland's own local fire-sprinkler ordinance (effective 12/3/2024) is broader than many peer cities' — sprinklers are required 'in all conditions allowed by state fire code,' explicitly including single-family residences over 10,000 square feet, not just commercial buildings.
- A water supply analysis (static pressure, residual pressure, flow) is a mandatory submittal component under Utah Admin. Code R710-4-5 — obtain this from the water purveyor, a flow test, or contract specifications before submitting sprinkler plans.
- This fire sprinkler review is separate from, and in addition to, Highland's own Residential, Commercial, or Commercial Tenant Improvement Building Permit process for the same project.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-21.
Fee schedules
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Highland building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Highland's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Highland yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Highland lands. Privacy.
Other permits in Highland
Fire Sprinkler System Permit / Plan Review in other cities
Compare fire sprinkler system permit / plan review fees across Utah →