Fire Sprinkler System Permit / Plan Review in Alpine, Utah

Alpine City's Building Department does not review or permit fire sprinkler systems itself, and Alpine's Consolidated Fee Schedule (effective 11/11/2025, full text reviewed 2026-07-21) contains no 'fire,' 'sprinkler,' or 'suppression' fee line item at all. Per Alpine's official Public Safety page, fire code enforcement for Alpine is provided by Lone Peak Fire District (serving Alpine, Highland, and Cedar Hills) — the local fire authority responsible for enforcing the state fire code in Alpine under Utah Code § 53-7-104(2). However, a direct check of Lone Peak Fire District's own website (lonepeakfire.com, re-checked 2026-07-21) found no published fire sprinkler permit application, fee schedule, or plan-review guidance of any kind. The Utah State Fire Marshal's Office separately publishes a statewide Automatic Fire Sprinkler Plan Submittal Form with its own published fee ($75 minimum, or $0.022 per square foot of review scope, whichever is greater) — cited here as the best available grounded fee reference in the absence of any Lone Peak-published figure — but the State Fire Marshal's own enforcement jurisdiction under Utah Code § 53-7-104(3) is limited to areas outside corporate cities/fire districts, state/school property, and certain institutional occupancies (or by request of the local fire official), so it is not certain this state-level fee is what Lone Peak Fire District actually charges for an ordinary commercial sprinkler system in Alpine. Applicants should confirm directly with Lone Peak Fire District (801-763-5365) which review path and fee apply to a specific project.

Reviewed 2026-07-21 · Source

When you need this permit

  • Installation of an automatic fire sprinkler system in a building located in Alpine City, where required by the adopted fire/building code for the occupancy or use
  • Fire sprinkler system plans must be reviewed and approved by the applicable fire code authority before installation begins, separate from Alpine's own Building Permit process
  • A water supply analysis (static pressure, residual pressure, and flow, in gpm) must be provided during design, per Utah Admin. Code R710-4-5
  • Hydraulic calculations and, where required, seismic calculations and material submittals must accompany the sprinkler drawings

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Automatic Fire Sprinkler Plan Review (Utah State Fire Marshal's Office)Utah State Fire Marshal's Office, Automatic Fire Sprinkler Plan Submittal Form (2022 revision): 'SQUARE FEET x .022$ = $______. Note: Minimum fee is $75.' Cited as the best available grounded fee reference — Alpine's own Consolidated Fee Schedule has no sprinkler line item, and Lone Peak Fire District (Alpine's local fire authority per Utah Code § 53-7-104(2)) publishes no fee schedule of its own; whether this state-level fee is what actually applies to an Alpine project has not been independently confirmed with Lone Peak Fire District.
Greater of $75.00 minimum or $0.022 per square foot of the scope of work reviewed

Review timeline

Plan review
Not published — contact the department

How long did your Fire Sprinkler System Permit / Plan Review permit actually take in Alpine?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Fire Sprinkler Inspection and Testing

    Inspection and acceptance testing of the installed system per NFPA 13, 13R, 13D, 20, and 24 (2022 Edition), adopted by Utah Administrative Rule R710-5, 'Automatic Fire Sprinkler System Inspection and Testing.'

See the full Alpine inspection guide — scheduling & re-inspection fees →

Tips

  • Lone Peak Fire District, not Alpine City's own Building Department, is the fire authority for Alpine per Alpine's official Public Safety page — confirm sprinkler plan review and fees directly with Lone Peak Fire District (5582 Parkway West Drive, Highland, UT 84003; 801-763-5365) before assuming a specific fee applies.
  • A water supply analysis (static pressure, residual pressure, flow) is a mandatory submittal component under Utah Admin. Code R710-4-5 — obtain this from the water purveyor, a flow test, or contract specifications before submitting sprinkler plans.
  • This fire sprinkler review is separate from, and in addition to, Alpine's own Commercial Building Permit or Commercial Tenant Improvement Permit process for the same project.

Frequently asked questions

Alpine requires a fire sprinkler system permit / plan review for: Installation of an automatic fire sprinkler system in a building located in Alpine City, where required by the adopted fire/building code for the occupancy or use; Fire sprinkler system plans must be reviewed and approved by the applicable fire code authority before installation begins, separate from Alpine's own Building Permit process; A water supply analysis (static pressure, residual pressure, and flow, in gpm) must be provided during design, per Utah Admin. Code R710-4-5; Hydraulic calculations and, where required, seismic calculations and material submittals must accompany the sprinkler drawings. If your project isn't listed, confirm with Alpine City Building Department at (801) 756-6347 before starting work.

No. Alpine City's Building Department does not review fire sprinkler systems, and its Consolidated Fee Schedule has no sprinkler-related fee line item. Fire code enforcement in Alpine is provided by Lone Peak Fire District, which as of this review publishes no fire sprinkler permit fee schedule of its own on lonepeakfire.com.

Alpine does not publish a plan-review timeline for this permit. Contact Alpine City Building Department at (801) 756-6347 for current turnaround.

You'll need: Automatic Fire Sprinkler Plan Submittal Form; Alpine City Building Permit. See the required-documents checklist on this page for details on each.

Alpine requires 1 inspection(s) for a fire sprinkler system permit / plan review, in order: Fire Sprinkler Inspection and Testing. Schedule each through Alpine City Building Department ((801) 756-6347).

Apply through Alpine City Building Department at 20 North Main, Alpine, UT 84004. Phone: (801) 756-6347, email: mfox@alpineUT.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.alpineut.gov/157/Building-Department.

Alpine, Utah has adopted: 2021 International Residential Code (IRC) — REMAINS CURRENT, Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 amendment; per Alpine City's official Building Permit Instructions (New Home Form #2, revised 4/9/2025): 'Structural design criteria must conform to the 2021 IRC.'; 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition Alpine City's official Building Permit Instructions (New Home Form #2, revised 4/9/2025) still cited as of live-check 2026-07-16: 'I understand that it is my responsibility to comply with Alpine City Zoning Ordinances and the I.B.C. 2021 code (including Appendix C and J) as adopted by Alpine City.'; 2021 IRC Appendix AL (Building Permit Fees) as amended by Alpine City — Alpine's Consolidated Fee Schedule (effective November 11, 2025), Appendix B, is expressly titled 'Building Permit Fees (2021 IRC Appendix AL, as amended)' and cites https://codes.iccsafe.org/content/IRC2021P2/appendix-al-permit-fees. This is a local fee-table appendix reference, not the § 15A-2-103 construction-code edition, and is unaffected by the 7/1/2026 code-cycle update.; Utah statewide baseline construction code editions per Utah Code § 15A-2-103, effective 7/1/2026 (superseded 1/1/2027): 2024 IPC (§(1)(d)), 2024 IMC (§(1)(e)), 2024 IFGC (§(1)(f)), 2024 IECC as a single unsplit statewide edition (§(1)(h)), 2024 IEBC (§(1)(i)), and the residential provisions of the 2024 ISPSC (§(1)(n)) — none separately itemized in Alpine's own published materials (Consolidated Fee Schedule, Building Permit Instructions, Building Department page); added here per statute since Alpine's own documents omit them. The 2023 NEC (§(1)(g)) also applies statewide but is likewise not separately restated by Alpine — unchanged by the 7/1/2026 amendment.; NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Alpine City's official Building Permit Instructions (New Home Form #2) — the sole cited source for Alpine's code editions — was live-checked 2026-07-16 by re-fetching the PDF directly and remains dated 'Revised 4/9/2025' with no update: it still states 'Structural design criteria must conform to the 2021 IRC' (correct, unchanged) and 'the I.B.C. 2021 code (including Appendix C and J) as adopted by Alpine City' (STALE — Alpine has not published an updated form reflecting the 2024 IBC as of this date). No newer Alpine-specific building-code publication was found on alpineut.gov. The Utah Code § 15A-2-103 citation added to the sources array below points to the current in-force version link.. Local amendments apply — see the Alpine overview page for the full list.

The Utah State Fire Marshal's Office publishes a statewide fee of $75 minimum, or $0.022 per square foot of the reviewed scope of work if greater, on its Automatic Fire Sprinkler Plan Submittal Form. Whether this specific fee applies to a given Alpine project depends on which fire authority conducts the review — confirm with Lone Peak Fire District directly.