EV Charger / EVSE Permit — Alpine, Utah · Requirements sheet
Reviewed 2026-07-20 · Source: https://www.alpineut.gov/DocumentCenter/View/1000/Consolidated-Fee-Schedule
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Alpine, Utah
Alpine City does not publish a distinct "EV Charger" or "EVSE" fee line item, and does not issue a stand-alone electrical trade permit at all: its Consolidated Fee Schedule bills electrical work as one component of the combined valuation-based construction permit fee (which includes the construction fee, electrical fee, plumbing fee, and heating fee together). A search of the full Consolidated Fee Schedule PDF found no mention of "EV," "EVSE," "electric vehicle," or "charging station." Installing an EV charger in Alpine therefore requires a building/trade permit (minimum individual-trade permit fee applies) priced under the city's standard valuation-based fee table rather than a dedicated EV category.
Reviewed 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property within Alpine City
- Dedicated 240V circuit and/or panel capacity installed by a licensed electrician (or owner-builder for a private residence, per Utah Construction Trades Licensing Act exemptions) Owner-builderContractor
- A building/trade permit from Alpine City prior to starting work
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Alpine City Consolidated Fee Schedule (alpineut.gov/DocumentCenter/View/1000/Consolidated-Fee-Schedule): minimum fees for issuance of individual permits (construction, electrical, plumbing, heating) is referenced at $101; Show full citationHide
Alpine City Consolidated Fee Schedule (alpineut.gov/DocumentCenter/View/1000/Consolidated-Fee-Schedule): minimum fees for issuance of individual permits (construction, electrical, plumbing, heating) is referenced at $101; no distinct "EV Charger" or "EVSE" fee line was found anywhere in the document.Review timeline
Inspection process
- 1
Electrical Inspection
Inspection of the new circuit/equipment by the Alpine City Building Department as part of the standard trade-permit process.
See the full Alpine inspection guide — scheduling & re-inspection fees →
Tips
- Alpine City has no separate electrical trade-permit fee schedule or EV-specific line item as of the last verification — electrical work, including EV charger circuits, is priced under the same combined valuation-based fee table used for construction, plumbing, and heating permits.
- Confirm the exact fee with the Alpine City Building Department before applying, since the fee schedule does not itemize EV charger installations.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Alpine building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Alpine's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Alpine yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Alpine lands. Privacy.
Other permits in Alpine
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Alpine project checklist
Describe your project once and get every permit, document, and fee it triggers in Alpine — in one checklist. Free, for any city and any number of projects.
Get started →