EV Charger / EVSE Permit — Cedar City, Utah · Requirements sheet
Reviewed 2026-07-20 · Source: https://www.cedarcityut.gov/639/Fee-Schedule
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Cedar City, Utah
Cedar City does not publish a distinct "EV Charger" or "EVSE" fee line item. Its Consolidated Fee Schedule prices electrical work granularly by service/circuit type rather than by equipment: a Residential Permit Issuance Fee ($3) plus a Minimum Fee for Service Change or Alteration ($10) applies to minor remodel and additional-circuit work, while Commercial work is billed by amperage under the Service Entrance Fee table. A full-text search of the current Consolidated Fee Schedule found no mention of "EV," "EVSE," "electric vehicle," or "charging station," so an EV charger's exact billing category is not explicitly confirmed, but a new dedicated circuit for a Level 2 charger most closely matches the existing "Minor Remodel & Additional Circuits" / "Service Change or Alteration" residential category, or the amperage-based Service Entrance Fee for commercial installations or chargers requiring a service upgrade.
Reviewed 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property within Cedar City
- Dedicated 240V circuit and/or panel capacity installed by a licensed electrician Contractor
- Electrical permit filed with the Cedar City Building Department for the added circuit or service change
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
Inspection of the new circuit/equipment by the Cedar City Building Department as part of the standard electrical permit process.
See the full Cedar City inspection guide — scheduling & re-inspection fees →
Tips
- Cedar City's fee schedule does not name EV chargers explicitly — confirm with the Building Department whether the installation is billed under the residential Minor Remodel & Additional Circuits category ($3 + $10 minimum) or the amperage-based Service Entrance Fee before applying.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cedar City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Cedar City
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Cedar City project checklist
Describe your project once and get every permit, document, and fee it triggers in Cedar City — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →