EV Charger Installation Permit in Bountiful, Utah

Required for installation of Level 2 (240V) and Level 3 electric vehicle charging stations at residential and commercial properties in Bountiful.

Verified 2026-06-27 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Electrical Permit$40-$75
Panel Upgrade$75-$150 additional if panel upgrade needed

Review timeline

~37 business days

Typical estimate — confirm current times with the Bountiful building department

Inspection process

  1. 1

    Final

    Circuit installed, wire sizing verified, GFCI protection (if required), charger mounted and operational

Tips

Frequently asked questions

Do I need a permit for an EV charger in Bountiful?
Yes. Installing a Level 2 (240V) EV charger requires an electrical permit in Bountiful. Level 1 chargers that plug into a standard 120V outlet do not require a permit.
How much does it cost to install an EV charger in Bountiful?
In Bountiful, the EV charger permit fee follows the city fee schedule: Electrical Permit — $40-$75; Panel Upgrade — $75-$150 additional if panel upgrade needed. The permit is separate from installation — a typical EV charger install runs about $500–$2,000 (more if a panel upgrade is required). Check for Rocky Mountain Power rebates.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-06-27.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bountiful building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Bountiful

Related guides

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.