Change of Use / Certificate of Occupancy Compliance in Bountiful, Utah

Bountiful City has no separately named or separately priced 'Change of Use Permit' product. Instead, Bountiful City Land Use Code § 14-1-106 ('Certificate of Occupancy and Use Compliance') makes it unlawful to occupy any building with a greater intensity of use or different occupancy than specifically provided for in its Certificate of Occupancy, and requires a new Certificate any time occupancy changes to a more intensive use. Separately, § 14-1-106.F ('Illegal Change of Use') makes it a class C misdemeanor to change the use of a structure or property to a use not permitted by current City ordinances without first obtaining required re-zoning, variance, or other use approvals. Where a use change does require such approval, it is priced through Bountiful's existing Planning Fees (Conditional Use Permit, Variance, Zoning Map Amendment, or Determination of Non-Compliance/Non-Conformance) rather than a distinct change-of-use fee.

Verified 2026-07-21 · Source

When you need this permit

  • It is unlawful to use or occupy, or to permit the use or occupancy of, any building or premises prior to issuance of a Certificate of Occupancy by the City (§ 14-1-106.A)
  • It is unlawful to occupy, or allow to be occupied, any building with a greater intensity of use or different occupancy than specifically provided for in the Certificate of Occupancy (§ 14-1-106.A)
  • A new Certificate of Occupancy is required any time the occupancy of a building changes to a more intensive use (§ 14-1-106.B)
  • No building permit shall be granted for a change of use in any land, building, or structure if such change would violate any provision of the Land Use Code (§ 14-1-105.B)
  • Any person who changes the use of a structure or property to a use not permitted by current City ordinances, without first obtaining required re-zoning, variance, or other use approvals, is guilty of a class C misdemeanor ('Illegal Change of Use,' § 14-1-106.F)
  • Where the new use requires a Conditional Use Permit, Variance, or Zoning Map Amendment, that Planning Department approval process (and its fee) applies before the Certificate of Occupancy can be reissued

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Certificate of Occupancy (issuance/reissuance)Bountiful City Land Use Code § 14-1-106.B: a Certificate of Occupancy 'shall be issued by the Engineering and Building Department of the City at the time a building is completed and final inspection conducted. A new Certificate shall be required any time the occupancy of the building changes to a more intensive use.' No distinct Certificate of Occupancy fee line item appears in Ordinance 2023-01's Engineering Fees (Building Permits) section, confirmed live 2026-07-21 — CO issuance is bundled into the standard building-permit/final-inspection process.
No separate fee — issued by the Engineering and Building Department as part of the final building-permit inspection
Conditional Use Permit (if the new use requires one)Bountiful City Ordinance 2023-01, Planning Fees — Land Use Development Fees table (p.8), verbatim: 'Conditional Use Permit ... $950.00.' Fetched and confirmed live 2026-07-21.
$950.00
Variance (if the new use requires one)Bountiful City Ordinance 2023-01, Planning Fees table (p.8), verbatim: 'Variance ... $1,150.00.'
$1,150.00
Zoning Map Amendment / Rezone (if the new use requires one)Bountiful City Ordinance 2023-01, Planning Fees table (p.8), verbatim: 'Zoning Map Amendment ... $2,000.00.'
$2,000.00
Determination of Non-Compliance/Non-ConformanceBountiful City Ordinance 2023-01, Planning Fees table (p.8), verbatim: 'Determination of Non-Compliance/Non-Conformance ... $450.00.' This is the closest fee-schedule analog Bountiful publishes to a formal use/zoning-compliance determination for an existing building.
$450.00

Review timeline

Plan review
Not published — contact the department

How long did your Change of Use / Certificate of Occupancy Compliance permit actually take in Bountiful?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection (New Certificate of Occupancy)

    Required whenever the occupancy of a building changes to a more intensive use; a new Certificate of Occupancy is issued by the Engineering and Building Department only after this inspection (§ 14-1-106.B).

See the full Bountiful inspection guide — scheduling & re-inspection fees →

Tips

  • Bountiful has no single, distinctly-named 'Change of Use Permit,' but City Code § 14-1-106 ('Certificate of Occupancy and Use Compliance') requires a new Certificate of Occupancy any time a building's occupancy changes to a more intensive use, and separately makes an unpermitted 'Illegal Change of Use' a class C misdemeanor (§ 14-1-106.F).
  • Occupying a building with a greater intensity of use or different occupancy than its existing Certificate of Occupancy authorizes is itself declared a nuisance subject to abatement (§ 14-1-106.D), independent of the misdemeanor penalty.
  • If the new use isn't already permitted outright in the property's zone, expect to go through Bountiful's standard Planning Department approval track first — Conditional Use Permit ($950), Variance ($1,150), or Zoning Map Amendment ($2,000) — before a new Certificate of Occupancy can be issued.
  • For a formal written opinion on whether a specific existing or proposed use complies with current zoning, Bountiful's Planning Fees table lists a 'Determination of Non-Compliance/Non-Conformance' fee ($450) — the closest analog to a standalone use-verification product.
  • Any seller, lessor, or their agent must disclose the property's current official zoning classification on listings/promotional materials (§ 14-1-106.H), and misrepresenting a property's lawful use is itself a separate class C misdemeanor ('False Representation,' § 14-1-106.G).

Frequently asked questions

Bountiful requires a change of use / certificate of occupancy compliance permit for: It is unlawful to use or occupy, or to permit the use or occupancy of, any building or premises prior to issuance of a Certificate of Occupancy by the City (§ 14-1-106.A); It is unlawful to occupy, or allow to be occupied, any building with a greater intensity of use or different occupancy than specifically provided for in the Certificate of Occupancy (§ 14-1-106.A); A new Certificate of Occupancy is required any time the occupancy of a building changes to a more intensive use (§ 14-1-106.B); No building permit shall be granted for a change of use in any land, building, or structure if such change would violate any provision of the Land Use Code (§ 14-1-105.B); Any person who changes the use of a structure or property to a use not permitted by current City ordinances, without first obtaining required re-zoning, variance, or other use approvals, is guilty of a class C misdemeanor ('Illegal Change of Use,' § 14-1-106.F); Where the new use requires a Conditional Use Permit, Variance, or Zoning Map Amendment, that Planning Department approval process (and its fee) applies before the Certificate of Occupancy can be reissued. If your project isn't listed, confirm with Bountiful City Building Department at (801) 298-6125 before starting work.

Reissuing the Certificate of Occupancy itself has no separate fee — it is bundled into the Building Department's final-inspection process. If the new use requires Planning Department approval, the applicable Ordinance 2023-01 fee applies: Conditional Use Permit $950, Variance $1,150, Zoning Map Amendment $2,000, or Determination of Non-Compliance/Non-Conformance $450.

Bountiful does not publish a plan-review timeline for this permit. Contact Bountiful City Building Department at (801) 298-6125 for current turnaround.

You'll need: Building Permit Application (Cityinspect) — where construction/remodel accompanies the use change. Depending on your project, Bountiful may also ask for: Conditional Use Permit / Variance / Zoning Map Amendment Application (Planning Department); Determination of Non-Compliance/Non-Conformance Request. See the required-documents checklist on this page for details on each.

Bountiful requires 1 inspection(s) for a change of use / certificate of occupancy compliance permit, in order: Final Inspection (New Certificate of Occupancy). Schedule each through Bountiful City Building Department ((801) 298-6125).

Apply through Bountiful City Building Department at 795 South Main Street, Bountiful, UT 84010. Phone: (801) 298-6125, email: tbasinger@bountiful.gov. Office hours: Mon–Thu 7:00 AM – 6:00 PM (permits issued until 5:30 PM); closed Fri–Sun. Official information: https://www.bountifulutah.gov/Building.

Bountiful, Utah has adopted: 2021 International Residential Code (IRC) with Appendices AE and AQ — residential construction; as adopted by the State of Utah (Utah Code § 15A-2-103(1)(b)/(k)/(c)); unaffected by the 7/1/2026 statute revision, continues in force; Bountiful Design Criteria, rev. Oct 13, 2025; 2015 International Residential Code Chapter 11 (residential energy provisions) — per Bountiful Design Criteria, rev. Oct 13, 2025 (statewide residential energy baseline per Utah Code § 15A-2-103); 2024 International Building Code (IBC) with Appendices C and J — commercial construction; Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition; 2024 International Mechanical Code (IMC) — commercial; Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition; 2024 International Plumbing Code (IPC) — commercial; Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition; 2024 International Fuel Gas Code (IFGC) — commercial; Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition; 2024 International Energy Conservation Code (IECC) — commercial; Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition; 2021 International Fire Code (IFC) — commercial; Bountiful Design Criteria, rev. Oct 13, 2025; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition; CONFIRMED 2026-07-17: the live Bountiful Design Criteria PDF (still dated Rev. October 13, 2025, unchanged/not reissued) explicitly lists '2021 International Swimming Pool and Spa Code' — the city has NOT yet published an updated Design Criteria reflecting the 2024 ISPSC (or the other 2024 commercial code editions) despite the statute taking effect 2026-07-01; the statutory 2024 editions govern by operation of Utah Code regardless, but Bountiful's own summary sheet is stale on this point — call (801) 298-6125 to confirm practical enforcement if this matters for a specific project; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unaffected by the 7/1/2026 statute revision, continues in force; Bountiful Design Criteria, rev. Oct 13, 2025; NOTE: Effective July 1, 2026 (now in force) — 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC (residential provisions) replaced the 2021 editions per Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027; text independently re-verified live at le.utah.gov 2026-07-16). The 2021 IRC and 2023 NEC were unaffected and remain in force.. Local amendments apply — see the Bountiful overview page for the full list.

Not as a distinctly named or priced product. Bountiful City Code § 14-1-106 instead requires a new Certificate of Occupancy any time a building's occupancy changes to a more intensive use, and separately makes it a class C misdemeanor ('Illegal Change of Use') to change a structure's or property's use to one not permitted by current City ordinances without first obtaining any required re-zoning, variance, or other use approval.

Sources & verification

Verified against official sources. Last reviewed 2026-07-21.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bountiful building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.