Change of Use / Change of Occupancy in Brigham City, Utah
Brigham City does not publish a standalone Change of Use, Change of Occupancy, or Certificate of Occupancy re-issuance permit or fee. Re-chased 2026-07-21 directly against the city's live 'Design Criteria and Code Analysis Requirements' page: its 'Existing Buildings' section states that 'Mandatory seismic upgrades may be required for projects which undergo a change in use or else a significant alteration or addition as defined by IBC Chapter 34 Section 3406.4,' treating a change in use as a triggering condition analyzed within the standard Design Criteria / Code Analysis process rather than a distinct permit category. Consistent with this, the city's official 'Code Analysis for Major Commercial Projects' fillable worksheet includes 'Change in Use' as one of the 'applied occupancies' fields completed as part of the general Commercial Building Permit submittal. A full inventory of the city's 34-document Applications & Forms folder (planning/zoning applications, subdivision plats, conditional/permitted use permits, rezone, annexation, fence, and ADU forms) contains no standalone Change of Use, Change of Occupancy, or Certificate of Occupancy application.
Verified 2026-07-21 · Source
When you need this permit
- A change in use or occupancy classification for an existing building in Brigham City is evaluated through the standard Building Permit / Code Analysis process, not a separate application
- The official Code Analysis worksheet requires the applicant to identify any 'Change in Use' and any 'Mixed Occupancy' or 'Special Use and Occupancy' under its occupancy-classification section
- Per the Design Criteria and Code Analysis Requirements page: a mandatory seismic upgrade (meeting IEBC Chapter 5 performance levels) may be required 'for projects which undergo a change in use or else a significant alteration or addition as defined by IBC Chapter 34 Section 3406.4'
- Voluntary seismic upgrades (not triggered by a change in use) are not required to meet IEBC Chapter 5 performance levels, but must still conform to the IBC or other adopted existing-building standards per Utah Uniform Building Standards Act Rules R156-56-71(2), and require a detailed engineering analysis submitted to the Building Department
- If the use/occupancy change involves construction or tenant-improvement scope, it is processed as a Commercial Building Permit or Commercial Tenant Improvement Permit (see those entries in this record)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Code Analysis / Occupancy Classification Review
Change-in-use and mixed/special occupancy designations are reviewed as part of the Code Analysis worksheet accompanying the Commercial Building Permit; a mandatory seismic upgrade analysis (IEBC Chapter 5) may be triggered per IBC Chapter 34 Section 3406.4.
See the full Brigham City inspection guide — scheduling & re-inspection fees →
Tips
- Do not look for a 'Change of Use Permit' or 'Change of Occupancy Permit' application on bcutah.gov — it does not exist. A change in use is captured as a field on the Code Analysis for Major Commercial Projects worksheet, which is submitted with the standard Commercial Building Permit.
- A change in use can trigger a mandatory seismic upgrade to IEBC Chapter 5 performance levels under IBC Chapter 34 Section 3406.4 — budget for a detailed engineering analysis even if the physical scope of work is otherwise minor.
- If the use change involves no construction or tenant-improvement scope, confirm directly with the Building Official (Tracy Halladay, 435-734-6628) and Fire Marshal (Michael Young, 435-730-6685) whether any life-safety review applies before assuming no city-level process is triggered.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-21.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Brigham City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Brigham City
Change of Use / Change of Occupancy in other cities
Compare change of use / change of occupancy fees across Utah →
Look up this fee in a different city →