Change of Use / Change of Occupancy in Clearfield, Utah

Clearfield does not publish a distinct 'Change of Use' or 'Change of Occupancy' permit or fee line item. Full-text review of the current Consolidated Fee Schedule (Ordinance 2025-16, adopted 6-24-2025, all sections including Business License Fees reviewed directly 2026-07-21), the 'When Do I Need a Building Permit?' handout, and the Commercial Remodel or Tenant Finish Building Permit Application and Checklist found no standalone change-of-use/change-of-occupancy application. Where a change of use also involves construction, occupancy classification is determined as part of the existing Commercial Building Permit or Commercial Tenant Improvement/Tenant Finish Permit process — Clearfield's own Commercial Plans Submittal Checklist requires the Occupancy Group, Occupant Load, and sprinklered/unsprinklered status to be stated on the plan title page (Utah Code § 15A-2-103(1)(i) statewide-mandatory 2024 IEBC governs change-of-occupancy determinations). Where no construction is involved, a new business occupying an existing space is billed under the same General Business License fee table as any other new business, or files a $5 Amended License / Change of Information filing if only updating an existing license's details.

Verified 2026-07-21 · Source

When you need this permit

  • No standalone change-of-use or change-of-occupancy application exists — the applicable process depends on whether construction accompanies the use change
  • If the change of use involves tenant-finish or remodel work: file a Commercial Remodel or Tenant Finish Building Permit, whose Commercial Plans Submittal Checklist requires the building's Occupancy Group, Occupant Load, and sprinklered/unsprinklered status on the plan title page
  • If the change of use involves no construction: a new occupant/business obtains a standard General Business License (Commercial) for the space; an existing licensee updating only business details (name, contact info) files the online 'Change of Information' (Amended License) application
  • Governed by the 2024 International Existing Building Code (IEBC), statewide-mandatory per Utah Code § 15A-2-103(1)(i) as of 7/1/2026, which addresses change-of-occupancy classification

Required documents

Check off what you have — your progress is saved on this device.

Fee schedule

General Business License — New / Commercial (applies when a new business/use occupies a space)Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025), 'Business License Fees' section, PDF verified directly 2026-07-21. No separate 'change of use' fee line item exists; a new occupant/use is billed the same General Business License fee as any other new business, plus any use-specific fee (e.g., Restaurant, Grocery Store, Group Home) also listed in this section.
$177
Amended License (Change of Information)Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025), 'Business License Fees' — 'Amended License' / 'Processing Fee — $5', PDF verified directly 2026-07-21. Matches the online 'Change of Information' application on Clearfield's Civic Review portal (steps: Applicant Information, Change of Information, Fees, Signature, Review), confirmed live 2026-07-21.
$5 processing fee
Building Permit / Plan Check (if construction accompanies the change of use)No separate change-of-occupancy fee is published; where the change of use triggers tenant-finish or remodel work, it is billed exactly as the Commercial Tenant Improvement / Tenant Finish Permit.
Valuation-based per the commercial building permit fee table (see Commercial Building Permit and Commercial Tenant Improvement Permit fees)

Review timeline

Plan review
Not published — contact the department

How long did your Change of Use / Change of Occupancy permit actually take in Clearfield?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Fire Department Plan Review (if construction accompanies the change of use)

    Required only where tenant-finish/remodel work is triggered — same Fire Department (NDFD) review used for the Commercial Tenant Improvement Permit.

See the full Clearfield inspection guide — scheduling & re-inspection fees →

Tips

  • There is no dedicated 'change of use' or 'change of occupancy' permit or fee in Clearfield — confirmed by full-text review of the Consolidated Fee Schedule (Ordinance 2025-16), the 'When Do I Need a Building Permit?' handout, and the Commercial Remodel or Tenant Finish Building Permit Checklist.
  • If the new use requires no construction, a new business/use occupying a space applies for a standard General Business License (Commercial, $177) — the same fee any new business pays, regardless of the space's prior use.
  • If only updating the details of an existing license (name, contact info) rather than a genuine change of occupant/use, use the $5 'Amended License' (Change of Information) filing on the Civic Review portal instead of a new license application.
  • If the new use also involves structural, MEP, or life-safety work (common for a change between occupancy groups, e.g. retail to restaurant), a full Commercial Tenant Improvement / Tenant Finish Permit is required, and that permit's plan review captures the Occupancy Group and Occupant Load determination under the 2024 IEBC.

Frequently asked questions

Clearfield requires a change of use / change of occupancy permit for: No standalone change-of-use or change-of-occupancy application exists — the applicable process depends on whether construction accompanies the use change; If the change of use involves tenant-finish or remodel work: file a Commercial Remodel or Tenant Finish Building Permit, whose Commercial Plans Submittal Checklist requires the building's Occupancy Group, Occupant Load, and sprinklered/unsprinklered status on the plan title page; If the change of use involves no construction: a new occupant/business obtains a standard General Business License (Commercial) for the space; an existing licensee updating only business details (name, contact info) files the online 'Change of Information' (Amended License) application; Governed by the 2024 International Existing Building Code (IEBC), statewide-mandatory per Utah Code § 15A-2-103(1)(i) as of 7/1/2026, which addresses change-of-occupancy classification. If your project isn't listed, confirm with Clearfield City Community Development Department — Building Division at (801) 525-2701 before starting work.

There is no dedicated change-of-use fee. A new business/use is billed the same General Business License fee as any other new business ($177 commercial, Consolidated Fee Schedule Ordinance 2025-16). Updating only the details of an existing license (not a genuine change of use) costs a $5 Amended License processing fee via the Civic Review 'Change of Information' application. If construction is involved, standard Commercial Tenant Improvement Permit fees also apply.

Clearfield does not publish a plan-review timeline for this permit. Contact Clearfield City Community Development Department — Building Division at (801) 525-2701 for current turnaround.

Depending on your project, Clearfield may also ask for: Building Permit Application — Commercial Remodel or Tenant Finish (if construction accompanies the use change); General Business License Application (Commercial); Change of Information (Amended License) Application. See the required-documents checklist on this page for details on each.

Clearfield requires 1 inspection(s) for a change of use / change of occupancy permit, in order: Fire Department Plan Review (if construction accompanies the change of use). Schedule each through Clearfield City Community Development Department — Building Division ((801) 525-2701).

Apply through Clearfield City Community Development Department — Building Division at 55 South State Street, Clearfield, UT 84015. Phone: (801) 525-2701, email: permits@clearfieldcity.org. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://clearfield.city/business-development/.

Clearfield, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a), superseding the 2021 IBC. Clearfield's own Design Criteria and Adopted Codes document (rev. 9/29/2023, effective 7/1/2023) still lists the 2021 IBC — live-checked 2026-07-16 via direct PDF fetch of clearfield.city/wp-content/uploads/2023/10/Design-Criteria-Letterhead.pdf, confirming the city's document has NOT been updated to reflect the 7/1/2026 statewide flip. The statute controls regardless of the city document's lag.; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did NOT change this edition in the 7/1/2026 amendment. Matches Clearfield's Design Criteria and Adopted Codes document.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized in Clearfield's own Design Criteria and Adopted Codes document, added here per statute.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d), superseding the 2021 IPC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 IPC — live-checked 2026-07-16, confirming lag. The statute controls.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e), superseding the 2021 IMC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 IMC — live-checked 2026-07-16, confirming lag. The statute controls.; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f), superseding the 2021 IFGC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 IFGC — live-checked 2026-07-16, confirming lag. The statute controls.; 2023 National Electrical Code (NEC) — statewide-mandatory edition per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (the 2023 NEC baseline predates this code cycle). Clearfield's own Design Criteria document (rev. 9/29/2023) lists the 2020 NEC — one edition behind the statewide-mandatory floor, confirmed still unchanged via live PDF fetch 2026-07-16. Per Utah Code § 15A-1-204 (statewide-mandatory construction code), the 2023 NEC governs regardless of Clearfield's own document.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(h) (no residential/commercial split under current law). Supersedes Clearfield's own split scheme: the Design Criteria document (rev. 9/29/2023) separately cited 2021 IECC commercial provisions plus 2015 IECC residential provisions and 2015 IRC Chapter 11, Energy Efficiency, for residential energy — preserved here as history. Live-checked 2026-07-16: Clearfield's Design Criteria document still shows this pre-2024 split scheme; the statute controls.; 2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i), superseding the 2021 IEBC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 IEBC — live-checked 2026-07-16, confirming lag. The statute controls.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(n), superseding the 2021 ISPSC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 ISPSC — live-checked 2026-07-16, confirming lag. The statute controls.; Modular Building Institute (MBI) Standards 1200 and 1205 — statewide per Utah Code § 15A-2-103(1)(o); not listed in Clearfield's own Design Criteria document, added here per statute.; NOTE: A prior commercial-permit checklist PDF (undated content, hosted under a 2021 upload path) lists 2018 IBC/IMC/IPC, 2017 NEC, 2018 IFCI, 2018 IECC as 'Current Codes' — this is superseded by the Design Criteria and Adopted Codes document (rev. 9/29/2023, effective 7/1/2023) cited above, which is the more recent and more specific authority on adopted code editions; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Clearfield's Design Criteria and Adopted Codes document (rev. 9/29/2023, effective 7/1/2023) was live-checked 2026-07-16 via direct PDF fetch and is confirmed still lagging — it verbatim lists 2021 IBC/IMC/IPC/IFGC/IEBC/ISPSC, 2020 NEC, and the pre-2024 split IECC scheme (2021 commercial / 2015 residential). The statewide statute controls over Clearfield's un-updated document.. Local amendments apply — see the Clearfield overview page for the full list.

No. Clearfield does not publish a standalone change-of-use or change-of-occupancy application or fee. A new business/use moving into an existing space with no construction simply obtains a standard General Business License ($177 commercial, per the Consolidated Fee Schedule, Ordinance 2025-16). If the new use also involves tenant-finish or remodel work, that work goes through the Commercial Tenant Improvement / Tenant Finish Permit, whose plan review determines the Occupancy Group and Occupant Load under the statewide-mandatory 2024 IEBC.

Sources & verification

Verified against official sources. Last reviewed 2026-07-21.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clearfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.