Skip to main content
PermitBase

Roofing Permit in Clearfield, Utah

Required for reroofing (complete replacement) in Clearfield; minor roof repairs do not require a permit. Fees are valuation-based per the building permit fee table.

Verified 2026-07-03 · Source

When you need this permit

  • Reroofing (complete roof replacement)
  • Structural roof repairs

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Roofing PermitClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025) — no separate roofing fee table is published; reroofing is assessed under the same building valuation table.
Valuation-based per building permit fee table (see residential building permit fees)

Review timeline

Plan review
Not published — contact the department

How long did your Roofing Permit permit actually take in Clearfield?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Deck / Substrate

    After tear-off — verify sheathing condition before proceeding

  2. 2

    Final

    Completed roof — verify ice barrier, flashing, drip edge, and nailing pattern

See the full Clearfield inspection guide — scheduling & re-inspection fees →

Tips

  • Reroofing requires a permit in Clearfield, but 'minor roof repairs' are explicitly listed as not requiring one in the 'When Do I Need a Building Permit?' handout — the handout does not define a size/percentage threshold; confirm with the Building Division for borderline repair jobs.
  • Frost/ice-barrier design criteria: ice barrier underlayment required 24 inches from the warm side of the exterior wall (Design Criteria and Adopted Codes, rev. 9/29/2023).

Frequently asked questions

Yes, reroofing requires a building permit. Minor roof repairs do not, per Clearfield's 'When Do I Need a Building Permit?' handout — the city does not publish a specific size threshold defining 'minor,' so confirm borderline repairs with the Building Division at (801) 525-2701.

In Clearfield, the published Roofing Permit is: Valuation-based per building permit fee table (see residential building permit fees). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Clearfield does not publish a plan-review timeline for this permit. Contact Clearfield City Community Development Department — Building Division at (801) 525-2701 for current turnaround.

You'll need: Building Permit Application. Depending on your project, Clearfield may also ask for: Utah Roofing Contractor License (DOPL). See the required-documents checklist on this page for details on each.

Clearfield requires 2 inspection(s) for a roofing permit, in order: Deck / Substrate, Final. Schedule each through Clearfield City Community Development Department — Building Division ((801) 525-2701).

Apply through Clearfield City Community Development Department — Building Division at 55 South State Street, Clearfield, UT 84015. Phone: (801) 525-2701, email: permits@clearfieldcity.org. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://clearfield.city/business-development/.

Clearfield, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a), superseding the 2021 IBC. Clearfield's own Design Criteria and Adopted Codes document (rev. 9/29/2023, effective 7/1/2023) still lists the 2021 IBC — live-checked 2026-07-16 via direct PDF fetch of clearfield.city/wp-content/uploads/2023/10/Design-Criteria-Letterhead.pdf, confirming the city's document has NOT been updated to reflect the 7/1/2026 statewide flip. The statute controls regardless of the city document's lag.; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did NOT change this edition in the 7/1/2026 amendment. Matches Clearfield's Design Criteria and Adopted Codes document.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized in Clearfield's own Design Criteria and Adopted Codes document, added here per statute.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d), superseding the 2021 IPC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 IPC — live-checked 2026-07-16, confirming lag. The statute controls.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e), superseding the 2021 IMC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 IMC — live-checked 2026-07-16, confirming lag. The statute controls.; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f), superseding the 2021 IFGC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 IFGC — live-checked 2026-07-16, confirming lag. The statute controls.; 2023 National Electrical Code (NEC) — statewide-mandatory edition per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (the 2023 NEC baseline predates this code cycle). Clearfield's own Design Criteria document (rev. 9/29/2023) lists the 2020 NEC — one edition behind the statewide-mandatory floor, confirmed still unchanged via live PDF fetch 2026-07-16. Per Utah Code § 15A-1-204 (statewide-mandatory construction code), the 2023 NEC governs regardless of Clearfield's own document.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(h) (no residential/commercial split under current law). Supersedes Clearfield's own split scheme: the Design Criteria document (rev. 9/29/2023) separately cited 2021 IECC commercial provisions plus 2015 IECC residential provisions and 2015 IRC Chapter 11, Energy Efficiency, for residential energy — preserved here as history. Live-checked 2026-07-16: Clearfield's Design Criteria document still shows this pre-2024 split scheme; the statute controls.; 2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i), superseding the 2021 IEBC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 IEBC — live-checked 2026-07-16, confirming lag. The statute controls.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(n), superseding the 2021 ISPSC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 ISPSC — live-checked 2026-07-16, confirming lag. The statute controls.; Modular Building Institute (MBI) Standards 1200 and 1205 — statewide per Utah Code § 15A-2-103(1)(o); not listed in Clearfield's own Design Criteria document, added here per statute.; NOTE: A prior commercial-permit checklist PDF (undated content, hosted under a 2021 upload path) lists 2018 IBC/IMC/IPC, 2017 NEC, 2018 IFCI, 2018 IECC as 'Current Codes' — this is superseded by the Design Criteria and Adopted Codes document (rev. 9/29/2023, effective 7/1/2023) cited above, which is the more recent and more specific authority on adopted code editions; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Clearfield's Design Criteria and Adopted Codes document (rev. 9/29/2023, effective 7/1/2023) was live-checked 2026-07-16 via direct PDF fetch and is confirmed still lagging — it verbatim lists 2021 IBC/IMC/IPC/IFGC/IEBC/ISPSC, 2020 NEC, and the pre-2024 split IECC scheme (2021 commercial / 2015 residential). The statewide statute controls over Clearfield's un-updated document.. Local amendments apply — see the Clearfield overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clearfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.