EV Charger / EVSE Permit — Clearfield, Utah · Requirements sheet
Reviewed 2026-07-20 · Source: https://clearfield.city/wp-content/uploads/2025/08/Adopted-Consolidated-Fee-062525.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Clearfield, Utah
Clearfield City does not publish a distinct "EV Charger" or "EVSE" fee line item. Its current Consolidated Fee Schedule (adopted 6/25/2025) does not include a separate electrical trade-permit fee table at all — electrical work, including EV charger installations, is assessed under the same project-valuation table used for the general building permit. A full-text search of the current fee schedule found no mention of "EV," "EVSE," "electric vehicle," or "charging station."
Reviewed 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property within Clearfield City
- Dedicated 240V circuit and/or panel capacity installed by a licensed electrician Contractor
- Building/electrical permit filed with Clearfield City, valued per the project's assigned construction value
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Clearfield City Consolidated Fee Schedule, Chapter 5, adopted 6/25/2025 (clearfield.city/wp-content/uploads/2025/08/Adopted-Consolidated-Fee-062525.pdf) — no separate electrical fee table is published; Show full citationHide
Clearfield City Consolidated Fee Schedule, Chapter 5, adopted 6/25/2025 (clearfield.city/wp-content/uploads/2025/08/Adopted-Consolidated-Fee-062525.pdf) — no separate electrical fee table is published; electrical work, including EV chargers, is assessed under the same building valuation table (full-text reviewed; no EV/EVSE mention found).Review timeline
Inspection process
- 1
Electrical Inspection
Inspection of the new circuit/equipment by Clearfield City as part of the standard electrical/building permit process.
See the full Clearfield inspection guide — scheduling & re-inspection fees →
Tips
- Clearfield does not itemize electrical permits separately from the general building permit valuation table, and no EV-specific fee exists — confirm the assigned project valuation for a charger installation with Community Development (801-525-2701) before applying.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clearfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
Clearfield's permit history is searchable by address
7,250 permits on record for Clearfield — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
Other permits in Clearfield
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Clearfield project checklist
Describe your project once and get every permit, document, and fee it triggers in Clearfield — in one checklist. Free, for any city and any number of projects.
Get started →