EV Charger / EVSE Permit — Centerville, Utah · Requirements sheet
Verified 2026-07-20 · Source: https://www.centervilleutah.gov/media/fsbniq4f/printable-electrical-permit.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Centerville, Utah
Centerville City's official Electrical Permit Application lists "EV Charging Station" as its own checkbox permit type, distinct from Power Service Upgrade, Power to Panel, and Temporary Power. It is billed at the city's standard flat Electrical Permit fee of $70.70 unless the installation also requires a service or panel upgrade, in which case the higher Power to Panel fee ($141.40) applies.
Verified 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property within Centerville City
- Work performed by a contractor licensed under the Construction Trades Licensing Act (58-55, UCA), or by the property owner under an Owner-Builder Declaration for private, non-commercial, non-public use Owner-builderContractor
- If the charger requires added panel capacity or a new service, the Power Service Upgrade / Power to Panel box must also be checked and the corresponding fee paid
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
Final electrical inspection of the EV charging circuit/equipment by Centerville City, per the standard Electrical Permit process.
See the full Centerville inspection guide — scheduling & re-inspection fees →
Tips
- Centerville explicitly separates "EV Charging Station" from "Power Service Upgrade" and "Power to Panel" on its Electrical Permit Application — check the correct box(es) depending on whether the install also requires a panel or service change.
- If a panel or service upgrade is needed to support the new charger, budget for the higher $141.40 Power to Panel fee rather than the base $70.70 Electrical Permit fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Centerville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Centerville
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →