EV Charger / EVSE Permit in Centerville, Utah

Centerville City's official Electrical Permit Application lists "EV Charging Station" as its own checkbox permit type, distinct from Power Service Upgrade, Power to Panel, and Temporary Power. It is billed at the city's standard flat Electrical Permit fee of $70.70 unless the installation also requires a service or panel upgrade, in which case the higher Power to Panel fee ($141.40) applies.

Verified 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property within Centerville City
  • Work performed by a contractor licensed under the Construction Trades Licensing Act (58-55, UCA), or by the property owner under an Owner-Builder Declaration for private, non-commercial, non-public use Owner-builderContractor
  • If the charger requires added panel capacity or a new service, the Power Service Upgrade / Power to Panel box must also be checked and the corresponding fee paid

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

EV Charging Station (standard electrical permit fee)Centerville City Electrical Permit Application: "EV CHARGING STATION" is a checked permit-type box on the same form as the standard $70.70 Electrical Permit Fee (Credit/Debit Card Payments Accepted, Check or Cash).
$70.70
Power to Panel (if service/panel upgrade needed for the charger)Centerville City Electrical Permit Application: "POWER TO PANEL ... Outside & Inside Panel (Fee $141.40)" — applies if the EV charger installation also requires a power-to-panel upgrade rather than a simple new circuit.
$141.40

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Centerville?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    Final electrical inspection of the EV charging circuit/equipment by Centerville City, per the standard Electrical Permit process.

See the full Centerville inspection guide — scheduling & re-inspection fees →

Tips

  • Centerville explicitly separates "EV Charging Station" from "Power Service Upgrade" and "Power to Panel" on its Electrical Permit Application — check the correct box(es) depending on whether the install also requires a panel or service change.
  • If a panel or service upgrade is needed to support the new charger, budget for the higher $141.40 Power to Panel fee rather than the base $70.70 Electrical Permit fee.

Frequently asked questions

Centerville requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property within Centerville City; Work performed by a contractor licensed under the Construction Trades Licensing Act (58-55, UCA), or by the property owner under an Owner-Builder Declaration for private, non-commercial, non-public use; If the charger requires added panel capacity or a new service, the Power Service Upgrade / Power to Panel box must also be checked and the corresponding fee paid. If your project isn't listed, confirm with Centerville City Building and Renovating Division (Community Development Department) at 801-292-8232 before starting work.

In Centerville, the published EV Charging Station (standard electrical permit fee) is: $70.70. Additional published fees: Power to Panel (if service/panel upgrade needed for the charger) — $141.40. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Centerville does not publish a plan-review timeline for this permit. Contact Centerville City Building and Renovating Division (Community Development Department) at 801-292-8232 for current turnaround.

You'll need: Electrical Permit Application; Licensed Contractor Declaration or Owner-Builder Declaration. See the required-documents checklist on this page for details on each.

Centerville requires 1 inspection(s) for an ev charger / evse permit, in order: Electrical Inspection. Schedule each through Centerville City Building and Renovating Division (Community Development Department) (801-292-8232).

Apply through Centerville City Building and Renovating Division (Community Development Department) at 655 N 1250 W, Centerville, UT 84014. Phone: 801-292-8232, email: donna.wilkinson@centervilleutah.gov. Office hours: 7:30 AM – 4:30 PM, per Centerville City's official Community Development contact page. Inspections are provided by contracted inspector Sunrise Engineering; scheduled by calling 1-800-560-6151, 24-hour advance notice required, per the official Building and Renovating page.. Official information: https://www.centervilleutah.gov/living-here/building-and-renovating/.

Yes. The city's Electrical Permit Application lists "EV Charging Station" as its own checkbox permit type, separate from Power Service Upgrade and Power to Panel, billed at the standard $70.70 Electrical Permit fee.

Also check the Power to Panel box on the Electrical Permit Application; that work is billed at $141.40 (Outside & Inside Panel) rather than the base $70.70 fee.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Centerville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.