Residential Building Permit (New Home / Addition / Remodel) in Centerville, Utah

Required for new single-family/multi-family residential construction, additions, remodels, swimming pools, detached structures, and decks in Centerville, per the city's official Building Permit Application. The Permit Fee is valuation-based per Centerville City's own Total Building Valuation Chart (Fee Schedule § 4.010), not pegged to an outside ICC table.

Verified 2026-07-07 · Source

When you need this permit

  • New single-family dwelling, multi-family/town home construction, addition, remodel, swimming pool, detached structure, or deck (per the official Building Permit Application permit-type checkboxes)
  • Estimated permit valuation (dollar amount for the project, including market value of labor and materials) must be provided at time of application, per CMC § 10.04.120
  • Licensed Contractor Declaration or Owner-Builder Declaration (with Owner-Builder Certification Form) required on the application Owner-builderContractor
  • $1,000 refundable Construction Bond due prior to issuance, per Fee Schedule § 4.010

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based)Centerville City Fee Schedule § 4.010 (Building Permits), 'Total Building Valuation Chart', adopted by Res. 2017-18 on 8/15/2017 — this remains the currently codified table per the live municipal code fee book as of 2026-07-07 (no later amending resolution is listed against Chapter 4 in the code's own history log).
$1 to $500: $28.30. $501 to $2,000: $28.30 for the first $500 plus $23.66 per additional $1,000 or fraction, to $2,000. $2,001 to $25,000: $83.10 for the first $2,000 plus $16.80 per additional $1,000 or fraction, to $25,000. $25,001 to $50,000: $470.10 for the first $25,000 plus $12.12 per additional $1,000 or fraction, to $50,000. $50,001 to $100,000: $772.50 for the first $50,000 plus $8.40 per additional $1,000 or fraction, to $100,000. $100,001 to $500,000: $1,192.50 for the first $100,000 plus $6.72 per additional $1,000 or fraction, to $500,000. $500,001 to $1,000,000: $3,880.50 for the first $500,000 plus $5.70 per additional $1,000 or fraction, to $1,000,000. $1,000,001 and up: $6,730.50 for the first $1,000,000 plus $4.38 per additional $1,000 or fraction.
Residential Building Plan Review FeeCenterville City Fee Schedule § 4.040 (Plan Reviews), 'Residential Building Plan Review (including single-family dwellings, private garages, carports, and sheds)', adopted by Res. 2017-18. Due prior to issuance.
25% of Building Permit Fee
Construction Bond (refundable)Centerville City Fee Schedule § 4.010, 'Construction Bond ... refundable upon final approval.' Due prior to issuance.
$1,000.00
Permit Fee for Work Commenced Without a PermitCenterville City Fee Schedule § 4.010.
Applicable Permit Fee + 50%
Temporary Certificate of OccupancyCenterville City Fee Schedule § 4.010, subject to CMC § 10.06.050.
$50.00
Extension of Temporary Certificate of OccupancyCenterville City Fee Schedule § 4.010, subject to CMC § 10.06.050.
$25.00
Identical (Cardfile) Plan Check — Single-Family ResidentialCenterville City Fee Schedule § 4.040, 'Indentical (Cardfile) Plan Check ... Single-Family Residential - $70.' Due prior to issuance.
$70.00

Review timeline

Plan review
Not published — contact the department

How long did your Residential Building Permit (New Home / Addition / Remodel) permit actually take in Centerville?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Scheduled Inspections (Building/Electrical/Mechanical/Plumbing)

    Provided by Sunrise Engineering under contract to the City; scheduled by calling 1-800-560-6151, with 24-hour advance notice required, per the official Building and Renovating page.

See the full Centerville inspection guide — scheduling & re-inspection fees →

Tips

  • Centerville computes its Building Permit Fee from its own Total Building Valuation Chart (Fee Schedule § 4.010) rather than referencing an outside ICC schedule — distinct from Highland, which pegs its fee directly to the ICC's own table.
  • A $1,000 refundable Construction Bond applies to all building permits, separate from the valuation-based permit fee and the 25% plan review fee.
  • Per CMC § 10.04.100 and § 10.04.040, both permit APPLICATIONS (180 days to pursue in good faith) and ISSUED PERMITS (180 days to commence/continue work) are subject to independent 180-day expiration clocks.
  • Work commenced without a permit triggers a 50% penalty on top of the applicable permit fee (Fee Schedule § 4.010) plus a separate Investigation Fee equal to the permit fee (Fee Schedule § 4.030, CMC § 10.04.130).

Frequently asked questions

Centerville requires a residential building permit (new home / addition / remodel) for: New single-family dwelling, multi-family/town home construction, addition, remodel, swimming pool, detached structure, or deck (per the official Building Permit Application permit-type checkboxes); Estimated permit valuation (dollar amount for the project, including market value of labor and materials) must be provided at time of application, per CMC § 10.04.120; Licensed Contractor Declaration or Owner-Builder Declaration (with Owner-Builder Certification Form) required on the application; $1,000 refundable Construction Bond due prior to issuance, per Fee Schedule § 4.010. If your project isn't listed, confirm with Centerville City Building and Renovating Division (Community Development Department) at 801-292-8232 before starting work.

Per Centerville City's official Fee Schedule § 4.010 (Total Building Valuation Chart, adopted by Resolution 2017-18), the fee is based on the project's total valuation using the city's own tiered schedule — for example, $28.30 for the first $500 of valuation, rising to $6,730.50 for the first $1,000,000 plus $4.38 per additional $1,000. A 25% residential plan review fee and a $1,000 refundable construction bond also apply.

Centerville does not publish a plan-review timeline for this permit. Contact Centerville City Building and Renovating Division (Community Development Department) at 801-292-8232 for current turnaround.

You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

Centerville requires 1 inspection(s) for a residential building permit (new home / addition / remodel), in order: Scheduled Inspections (Building/Electrical/Mechanical/Plumbing). Schedule each through Centerville City Building and Renovating Division (Community Development Department) (801-292-8232).

Apply through Centerville City Building and Renovating Division (Community Development Department) at 655 N 1250 W, Centerville, UT 84014. Phone: 801-292-8232, email: donna.wilkinson@centervilleutah.gov. Office hours: 7:30 AM – 4:30 PM, per Centerville City's official Community Development contact page. Inspections are provided by contracted inspector Sunrise Engineering; scheduled by calling 1-800-560-6151, 24-hour advance notice required, per the official Building and Renovating page.. Official information: https://www.centervilleutah.gov/living-here/building-and-renovating/.

Centerville, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition CMC § 10.03.020 still codifies as of live re-check 2026-07-16 (adopted by Ord. 2017-03 4/4/2017, amended by Ord. 2019-18 8/6/2019, most recently amended by Ord. 2025-04 4/1/2025 — none of which updated the edition year to 2024). Centerville's own municipal code has not yet been amended to reflect the 7/1/2026 transition.; 2021 International Residential Code (IRC), including Appendices AE and AQ, plus the residential provisions of Chapter 11 (Energy Efficiency) of the 2015 IRC edition (subject to Utah Code § 15A-2-104) — REMAINS CURRENT, Utah Code § 15A-2-103(1)(b)/(c) did not change the base IRC edition in the 7/1/2026 amendment; CMC § 10.03.030 (last amended by Ord. 2025-04, 4/1/2025) is correct on this point.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition CMC § 10.03.040 still codifies as of live re-check 2026-07-16 (last amended by Ord. 2025-04, 4/1/2025).; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition CMC § 10.03.050 still codifies as of live re-check 2026-07-16 (last amended by Ord. 2025-04, 4/1/2025).; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition CMC § 10.03.060 still codifies as of live re-check 2026-07-16 (last amended by Ord. 2025-04, 4/1/2025).; 2023 National Electrical Code (NEC) — REMAINS CURRENT, Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 amendment. CMC § 10.03.070 (adopted by Ord. 2017-03, amended by Ord. 2018-16 6/19/2018, amended by Ord. 2025-04, and MOST RECENTLY amended by Ord. 2026-03 on 3/3/2026 — Centerville's most recently touched construction-code chapter) is correct and confirms the 2023 edition, consistent with statute.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition CMC § 10.03.080 still codifies as of live re-check 2026-07-16 (last amended by Ord. 2025-04, 4/1/2025).; 2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i); supersedes the 2021 edition CMC § 10.03.085 still codifies as of live re-check 2026-07-16 (last amended by Ord. 2025-04, 4/1/2025).; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(n); supersedes the 2021 edition CMC § 10.03.122 (Swimming Pools And Spa Code, adopted by Ord. 2025-04, 4/1/2025) still codifies — confirmed by live browser re-check 2026-07-16 (the JavaScript-rendered code viewer that previously blocked static text extraction was successfully read this session): 'The residential provisions of the Swimming Pool and Spa Code, 2021 Edition ... are hereby adopted.'; Manufactured Housing standards per Utah Code § 15A-2-104, plus the HUD Code, Appendix AE of the 2021 IRC, and the 2005 NFPA 225 Model Manufactured Home Installation Standard — adopted by Ord. 2017-03, amended by Ord. 2025-04, per CMC § 10.03.090. Not affected by the § 15A-2-103 7/1/2026 amendment (governed by § 15A-2-104 instead).; Uniform Code for the Abatement of Dangerous Buildings, 1997 Edition — adopted by Ord. 2017-03, amended by Ord. 2025-04, per CMC § 10.03.100. Not a § 15A-2-103 code; unaffected by the 7/1/2026 amendment.; International Property Maintenance Code, 2006 Edition — adopted by Ord. 2017-03, amended by Ord. 2025-04, per CMC § 10.03.110. Not a § 15A-2-103 code; unaffected by the 7/1/2026 amendment.; International Fire Code (IFC), 2021 Edition, excluding appendices, plus NFPA 1 Ch. 28 (2018), NFPA 54 (2024), and NFPA 58 (2024) — per CMC § 10.03.120, adopted by Ord. 2017-03, amended by Ord. 2018-07 (2/6/2018), amended by Ord. 2019-18 (8/6/2019), amended by Ord. 2025-04 (4/1/2025). CORRECTION (2026-07-16): this file's prior entry described the IFC edition as '2015 Edition per the 2017 code compilation text' and reported the full CMC § 10.03.120 text as unextractable due to JavaScript rendering — both are superseded by a successful live browser re-read of centerville.municipalcodeonline.com on 2026-07-16, which returned full section text confirming the 2021 IFC (not 2015) is currently codified. The IFC is NOT among the codes adopted by Utah Code § 15A-2-103 (Title 15A Chapter 2, State Construction Code) — Utah's Fire Code is separately adopted under Title 15A Chapter 5, State Fire Code Act — so no statutory edition change via § 15A-2-103 applies to this entry regardless.; International Wildland-Urban Interface (WUI) Code — CMC § 10.03.125, confirmed via live browser re-read 2026-07-16 (previously unextractable): the 2006-edition Utah WUI Code (adopted by Ord. 2017-03, per Utah Code Title 65A Ch. 8) governs UNTIL January 1, 2027, at which point the 2024-edition International WUI Code (adopted by Ord. 2026-03 on 3/3/2026, amended by Ord. 2026-09 on 4/21/2026) takes over per a dual-dated code section. This is a Title 15A Ch. 2 local-amendment-adoptable code under § 15A-2-103(2), distinct from the seven codes listed in § 15A-2-103(1) that are the focus of this file's 7/1/2026 update.; NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Centerville Municipal Code Title 10.03 was live re-read in full via browser (centerville.municipalcodeonline.com, JavaScript-rendered — the WebFetch tool that previously reported this content as unextractable returns only template chrome; the Browser pane renders full section text) on 2026-07-16 and IS STILL LAGGING on every code family Utah Code § 15A-2-103(1) bumped to 2024: IBC/IPC/IMC/IFGC/IECC/IEBC/ISPSC(residential) all remain codified at their pre-7/1/2026 (2021) editions, most recently touched by Ord. 2025-04 (4/1/2025), which predates the statute's effective date. The NEC section (§ 10.03.070, amended by Ord. 2026-03 on 3/3/2026 — Centerville's most recent construction-code ordinance) is CORRECT at 2023, and the IRC section is correctly unchanged at 2021. The Utah Code § 15A-2-103 citation has been added to the sources array below, pointing to the current in-force version link.. Local amendments apply — see the Centerville overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Centerville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.