Required for installation or modification of a fire alarm and detection system in Centerville. As with fire sprinkler permits, fire alarm plan review and permitting for Centerville is handled by South Davis Metro Fire (SDMF) -- a special fire district confirmed by its own website to serve 'Bountiful, Centerville, North Salt Lake, West Bountiful, Woods Cross and the unincorporated areas of South Davis County' -- separately from the City's own Building Division / Sunrise Engineering building-permit process.

Verified 2026-07-21 · Source

When you need this permit

  • Installation or modification of a fire alarm and detection system and related equipment
  • Per International Fire Code Section 104.7.2, SDMF requires a 'technical opinion and report' (peer review) of plans for fire alarm systems
  • Deferred submittals reviewed by a third-party peer reviewer are still billed at the same fee, per SDMF's own Plan Reviews page
  • Submit the plan review application and plans to fireplans@sdmetrofire.gov, separately from the Centerville City building permit submittal to donna.wilkinson@centervilleutah.gov

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Fire Alarm System Permit (plan review + 2 inspections)SDMF Fee Ordinance (04/2024), 'PERMITS/PLAN REVIEWS/INSPECTIONS' section: 'Fire alarm system permit (2 Inspections) ... $200.' Confirmed by direct PDF fetch 2026-07-21 (sdmetrofire.gov/_files/ugd/39b2d8_f44d3ef1ace841c7b612589d1a5b0a54.pdf). SDMF's Plan Reviews page (sdmetrofire.gov/copy-of-plan-reviews-1, fetched live 2026-07-21) independently corroborates: 'ALARM REVIEWS - $200 (includes review and 2 inspections)' and states the same $200 fee applies to deferred (third-party-reviewed) submittals.
$200

Review timeline

Plan reviewCenterville’s published plan-review target
14–14 business days

How long did your Fire Alarm System Permit permit actually take in Centerville?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    First Inspection

    Included in the $200 permit fee; SDMF fire alarm permits include 2 inspections total.

  2. 2

    Final Inspection

    Second of the 2 inspections included in the permit fee.

See the full Centerville inspection guide — scheduling & re-inspection fees →

Tips

  • Fire alarm plan review and permitting for Centerville is handled by South Davis Metro Fire (SDMF), not the City Building Division -- submit to fireplans@sdmetrofire.gov, separately from the City's own Building Permit Application.
  • Unlike the sprinkler review fee (which is split into a $100/hr plan review fee plus a $300 permit fee), SDMF's $200 fire alarm fee is a single line item covering both plan review and 2 inspections, whether reviewed in-house or deferred to a third-party peer reviewer.

Frequently asked questions

Centerville requires a fire alarm system permit for: Installation or modification of a fire alarm and detection system and related equipment; Per International Fire Code Section 104.7.2, SDMF requires a 'technical opinion and report' (peer review) of plans for fire alarm systems; Deferred submittals reviewed by a third-party peer reviewer are still billed at the same fee, per SDMF's own Plan Reviews page; Submit the plan review application and plans to fireplans@sdmetrofire.gov, separately from the Centerville City building permit submittal to donna.wilkinson@centervilleutah.gov. If your project isn't listed, confirm with Centerville City Building and Renovating Division (Community Development Department) at 801-292-8232 before starting work.

Centerville City's own Fee Schedule has no fire-alarm line item; South Davis Metro Fire (SDMF), which handles fire protection permitting for Centerville, charges a flat $200 Fire Alarm System Permit fee (covering plan review and 2 inspections), per SDMF's Fee Ordinance (04/2024). Submit to fireplans@sdmetrofire.gov.

Centerville's published plan-review target for a fire alarm system permit is 14–14 business days.

You'll need: SDMF Plan Review Application; Fire Alarm System Plans. See the required-documents checklist on this page for details on each.

Centerville requires 2 inspection(s) for a fire alarm system permit, in order: First Inspection, Final Inspection. Schedule each through Centerville City Building and Renovating Division (Community Development Department) (801-292-8232).

Apply through Centerville City Building and Renovating Division (Community Development Department) at 655 N 1250 W, Centerville, UT 84014. Phone: 801-292-8232, email: donna.wilkinson@centervilleutah.gov. Office hours: 7:30 AM – 4:30 PM, per Centerville City's official Community Development contact page. Inspections are provided by contracted inspector Sunrise Engineering; scheduled by calling 1-800-560-6151, 24-hour advance notice required, per the official Building and Renovating page.. Official information: https://www.centervilleutah.gov/living-here/building-and-renovating/.

Centerville, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition CMC § 10.03.020 still codifies as of live re-check 2026-07-16 (adopted by Ord. 2017-03 4/4/2017, amended by Ord. 2019-18 8/6/2019, most recently amended by Ord. 2025-04 4/1/2025 — none of which updated the edition year to 2024). Centerville's own municipal code has not yet been amended to reflect the 7/1/2026 transition.; 2021 International Residential Code (IRC), including Appendices AE and AQ, plus the residential provisions of Chapter 11 (Energy Efficiency) of the 2015 IRC edition (subject to Utah Code § 15A-2-104) — REMAINS CURRENT, Utah Code § 15A-2-103(1)(b)/(c) did not change the base IRC edition in the 7/1/2026 amendment; CMC § 10.03.030 (last amended by Ord. 2025-04, 4/1/2025) is correct on this point.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition CMC § 10.03.040 still codifies as of live re-check 2026-07-16 (last amended by Ord. 2025-04, 4/1/2025).; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition CMC § 10.03.050 still codifies as of live re-check 2026-07-16 (last amended by Ord. 2025-04, 4/1/2025).; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition CMC § 10.03.060 still codifies as of live re-check 2026-07-16 (last amended by Ord. 2025-04, 4/1/2025).; 2023 National Electrical Code (NEC) — REMAINS CURRENT, Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 amendment. CMC § 10.03.070 (adopted by Ord. 2017-03, amended by Ord. 2018-16 6/19/2018, amended by Ord. 2025-04, and MOST RECENTLY amended by Ord. 2026-03 on 3/3/2026 — Centerville's most recently touched construction-code chapter) is correct and confirms the 2023 edition, consistent with statute.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition CMC § 10.03.080 still codifies as of live re-check 2026-07-16 (last amended by Ord. 2025-04, 4/1/2025).; 2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i); supersedes the 2021 edition CMC § 10.03.085 still codifies as of live re-check 2026-07-16 (last amended by Ord. 2025-04, 4/1/2025).; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(n); supersedes the 2021 edition CMC § 10.03.122 (Swimming Pools And Spa Code, adopted by Ord. 2025-04, 4/1/2025) still codifies — confirmed by live browser re-check 2026-07-16 (the JavaScript-rendered code viewer that previously blocked static text extraction was successfully read this session): 'The residential provisions of the Swimming Pool and Spa Code, 2021 Edition ... are hereby adopted.'; Manufactured Housing standards per Utah Code § 15A-2-104, plus the HUD Code, Appendix AE of the 2021 IRC, and the 2005 NFPA 225 Model Manufactured Home Installation Standard — adopted by Ord. 2017-03, amended by Ord. 2025-04, per CMC § 10.03.090. Not affected by the § 15A-2-103 7/1/2026 amendment (governed by § 15A-2-104 instead).; Uniform Code for the Abatement of Dangerous Buildings, 1997 Edition — adopted by Ord. 2017-03, amended by Ord. 2025-04, per CMC § 10.03.100. Not a § 15A-2-103 code; unaffected by the 7/1/2026 amendment.; International Property Maintenance Code, 2006 Edition — adopted by Ord. 2017-03, amended by Ord. 2025-04, per CMC § 10.03.110. Not a § 15A-2-103 code; unaffected by the 7/1/2026 amendment.; International Fire Code (IFC), 2021 Edition, excluding appendices, plus NFPA 1 Ch. 28 (2018), NFPA 54 (2024), and NFPA 58 (2024) — per CMC § 10.03.120, adopted by Ord. 2017-03, amended by Ord. 2018-07 (2/6/2018), amended by Ord. 2019-18 (8/6/2019), amended by Ord. 2025-04 (4/1/2025). CORRECTION (2026-07-16): this file's prior entry described the IFC edition as '2015 Edition per the 2017 code compilation text' and reported the full CMC § 10.03.120 text as unextractable due to JavaScript rendering — both are superseded by a successful live browser re-read of centerville.municipalcodeonline.com on 2026-07-16, which returned full section text confirming the 2021 IFC (not 2015) is currently codified. The IFC is NOT among the codes adopted by Utah Code § 15A-2-103 (Title 15A Chapter 2, State Construction Code) — Utah's Fire Code is separately adopted under Title 15A Chapter 5, State Fire Code Act — so no statutory edition change via § 15A-2-103 applies to this entry regardless.; International Wildland-Urban Interface (WUI) Code — CMC § 10.03.125, confirmed via live browser re-read 2026-07-16 (previously unextractable): the 2006-edition Utah WUI Code (adopted by Ord. 2017-03, per Utah Code Title 65A Ch. 8) governs UNTIL January 1, 2027, at which point the 2024-edition International WUI Code (adopted by Ord. 2026-03 on 3/3/2026, amended by Ord. 2026-09 on 4/21/2026) takes over per a dual-dated code section. This is a Title 15A Ch. 2 local-amendment-adoptable code under § 15A-2-103(2), distinct from the seven codes listed in § 15A-2-103(1) that are the focus of this file's 7/1/2026 update.; NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Centerville Municipal Code Title 10.03 was live re-read in full via browser (centerville.municipalcodeonline.com, JavaScript-rendered — the WebFetch tool that previously reported this content as unextractable returns only template chrome; the Browser pane renders full section text) on 2026-07-16 and IS STILL LAGGING on every code family Utah Code § 15A-2-103(1) bumped to 2024: IBC/IPC/IMC/IFGC/IECC/IEBC/ISPSC(residential) all remain codified at their pre-7/1/2026 (2021) editions, most recently touched by Ord. 2025-04 (4/1/2025), which predates the statute's effective date. The NEC section (§ 10.03.070, amended by Ord. 2026-03 on 3/3/2026 — Centerville's most recent construction-code ordinance) is CORRECT at 2023, and the IRC section is correctly unchanged at 2021. The Utah Code § 15A-2-103 citation has been added to the sources array below, pointing to the current in-force version link.. Local amendments apply — see the Centerville overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-21.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Centerville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.