Fire Alarm System Permit — Cedar Hills, Utah · Requirements sheet
Verified 2026-07-21 · Source: https://files-backend.assets.thrillshare.com/documents/asset/uploaded_file/4305/Cch/ea07d7e5-a05c-4017-8e60-770c241f6c10/Fee-Schedule-01-01-26.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Fire Alarm System Permit in Cedar Hills, Utah
Required in Cedar Hills for installation of a new fire alarm system, remodel of an existing system, or extension of alarm coverage to additional floors, plan-reviewed in-house by the City under the Public Safety section of the City's own Fee Schedule (effective 07/01/2026), Resolution 07-16-2019A, explicitly labeled 'Fees are for In-House Plan Reviews Only.' These are the same fees already itemized within this record's commercial-building-permit and commercial-tenant-improvement-permit entries (new system and remodel, respectively); this entry consolidates them as their own permit type, matching the convention used for this permit category in peer Utah County jurisdictions (e.g. American Fork's fire-alarm-permit).
Verified 2026-07-21 · Source
When you need this permit
- Fire alarm system installation, remodel, or extension to additional floors in a commercial building or tenant space within Cedar Hills
- Fire alarm system plans submitted to the City for in-house plan review before installation, remodel, or extension, per Resolution 07-16-2019A
- Filed alongside the underlying Building Permit (new commercial construction or tenant improvement) — Cedar Hills does not publish a standalone fire-alarm-permit application separate from the Building Permit Application
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Fire Alarm System Inspection
Final inspection and testing of the installed or modified fire alarm system, performed as part of the underlying Building Permit's inspection process.
See the full Cedar Hills inspection guide — scheduling & re-inspection fees →
Tips
- Cedar Hills' fire alarm plan review fees ($100 new system / $50 remodel / $50 additional floors) apply to in-house plan reviews only, per the City's own Fee Schedule label — confirm with the Building Department whether any additional third-party review applies to your project.
- These are the same fees already itemized within this record's Commercial Building Permit (new system) and Commercial Tenant Improvement Permit (remodel) entries — a fire alarm system is filed and reviewed as part of the underlying Building Permit, not as a separate standalone application.
- The Fee Schedule's Public Safety section also lists False Fire Alarm Response fees ($200.00 for the first two false alarms per year, $500.00 per call for the third through fifth, per Resolution 07-16-2019A) — these are recurring nuisance-response fees, not part of the initial installation permit.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-21.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cedar Hills building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Cedar Hills
Fire Alarm System Permit in other cities
Compare fire alarm system permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Cedar Hills project checklist
Describe your project once and get every permit, document, and fee it triggers in Cedar Hills — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →