Solar Panel (PV) Permit in Cedar Hills, Utah
Required for residential rooftop solar photovoltaic installations in Cedar Hills. Requires a Building Permit Application, two sets of plans meeting the city's Solar PV System Plan Review Requirements checklist, and a $300 plan-check deposit (check only, per the city's Installation Permit page).
Verified 2026-07-08 · Source
When you need this permit
- Building Permit Application, with 'solar panel installations' work type
- Two copies of a detailed site plan showing the home and all PV system components
- Structural Engineer of Record report/evaluation confirming the roof can support the added array load; Utah-licensed structural engineer, wet-stamped
- Mounting system details: module mounting system, added component weight, roof covering type and number of layers
- One-line diagram: PV system type, module count/wiring/layout, wire types/sizes, conduit, component locations, fuse/breaker ratings, and which home electrical panel the system backfeeds to
- Module manufacturer spec sheets (rated watts, volts, amps, Voc, Isc)
- Inverter manufacturer spec sheets (rated watts/volts, max AC output amps/voltage); utility-tied inverters must be listed 'utility interactive' meeting UL 1741 with ground fault protection
- Total array power calculations (watts, amps, volts, Voc at coldest expected temperature per NEC 690.7, Isc)
- System component listings and equipment ratings
- Illustrations of required signage and sign locations
- HOA-approved and signed plans, if applicable
- $300 plan-check deposit, check only
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Inspection
Performed by Sunrise Engineering under contract to the city (800-560-6151, 24-hour notice required, no same-day inspections).
See the full Cedar Hills inspection guide — scheduling & re-inspection fees →
Tips
- The $300 solar plan-check deposit must be paid by check only, per the city's official Installation Permit page — plan ahead if paying online is otherwise your default.
- The Structural Engineer of Record's evaluation must be site-specific (not a generic letter) and must be wet-stamped by a Utah-licensed structural engineer.
- Utility-tied inverters must meet UL 1741 with ground fault protection and be listed as 'utility interactive' — confirm this rating on the manufacturer spec sheet before submittal.
- Solar gets the same reduced 26% Residential Plan Check rate as basement finishes and small structures, rather than the 65% rate for general new construction.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cedar Hills building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Cedar Hills
Solar Panel (PV) Permit in other cities
Compare solar panel (pv) permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Cedar Hills project checklist
Describe your project once and get every permit, document, and fee it triggers in Cedar Hills — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →