Solar Permit — Cedar City, Utah · Requirements sheet
Verified 2026-07-03 · Source: https://www.cedarcityut.gov/DocumentCenter/View/14648/Permit-Document-List
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar Permit in Cedar City, Utah
Required for residential rooftop solar photovoltaic installations in Cedar City. Cedar City's own Permit Document List states this permit type is 'Applicable to residential permits only.'
Verified 2026-07-03 · Source
When you need this permit
- Residential rooftop solar PV installation (per Cedar City's own documentation, this permit type is residential-only)
- Module and inverter specification sheets
- Mounting system specification showing panel specifications
- Rapid shutdown specification
- Photos of both the open and shut electrical panel
- Verification of any required meter upgrade
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 9 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement per Cedar City Inspection Reference Guide, applicable to solar electrical scope.
- 2
Permanent Power / Building Final
Final verification including Rocky Mountain Power service order number, per Inspection Reference Guide.
See the full Cedar City inspection guide — scheduling & re-inspection fees →
Tips
- Cedar City's own Permit Document List states the Solar permit type is 'Applicable to residential permits only' — verify with the Building Department how commercial/ground-mount solar installations (e.g., municipal projects like the city's own Fire Station 1 solar project) are permitted, since no distinct commercial solar permit category is listed.
- Photos of both the open AND shut electrical panel are required — a documentation requirement specific to Cedar City's checklist, not just a one-line electrical diagram.
- Cedar City's adopted electrical code is the 2023 NEC (per cedarcityut.gov/130/Current-Adopted-Codes), which governs the Rapid Shutdown Specification requirement.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cedar City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Cedar City
Solar Permit in other cities
Compare solar permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Cedar City project checklist
Describe your project once and get every permit, document, and fee it triggers in Cedar City — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →