Solar Panel (PV) Permit in Enoch City, Utah

Required for residential rooftop solar photovoltaic installations in Enoch City, using the city's dedicated Solar Permit packet.

Reviewed 2026-07-20 · Source

When you need this permit

  • Completed Solar Permit application package
  • Site plan and system specifications per the Solar Permit packet

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Filing fee
Not published — contact the department

Review timeline

Plan review
Not published — contact the department

How long did your Solar Panel (PV) Permit permit actually take in Enoch City?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection

    Per Enoch City's standard building permit inspection process; contact the Building Department at (435) 586-1119.

See the full Enoch City inspection guide — scheduling & re-inspection fees →

Tips

  • Enoch City publishes a dedicated Solar Permit packet (dated 9-12-2022) separate from its general residential and 'Other' building permit packets, available on the Applications & Forms page.

Frequently asked questions

Enoch City requires a solar panel (pv) permit for: Completed Solar Permit application package; Site plan and system specifications per the Solar Permit packet. If your project isn't listed, confirm with Enoch City Building Department (Community Development) at (435) 586-1119 before starting work.

Enoch City does not publish a plan-review timeline for this permit. Contact Enoch City Building Department (Community Development) at (435) 586-1119 for current turnaround.

You'll need: Solar Permit Packet. See the required-documents checklist on this page for details on each.

Enoch City requires 1 inspection(s) for a solar panel (pv) permit, in order: Final Inspection. Schedule each through Enoch City Building Department (Community Development) ((435) 586-1119).

Apply through Enoch City Building Department (Community Development) at 900 East Midvalley Road, Enoch, UT 84721. Phone: (435) 586-1119, email: inspector@enochcity.org. Office hours: Monday–Thursday 9:00 AM – 4:30 PM, Friday 9:00 AM – 1:00 PM, per enochcityut.gov footer contact block and the city's official Water Meter, Connection & Deposit Info sheet (Rev 06 2015).. Official information: https://www.enochcityut.gov/building-department.html.

Enoch City, Utah has adopted: Uniform Building Code (UBC) valuation table — Enoch City's own Fee Schedule (hosting.civiclinq.com/enochcity/books/enoch-city-fee-schedule/4.A) states: 'Building permit fees are set by the Uniform Building Code.' This is the same 1997 UBC Table 1-A valuation-fee structure referenced by other small Utah cities in this corpus (e.g. Provo); Enoch's own published fee-schedule language uses 'Uniform Building Code' rather than citing a specific IBC/IRC edition year.; Statewide baseline per Utah Code § 15A-2-103: Utah's currently adopted statewide construction codes — the 2024 IBC (incl. Appendices C and J), 2024 IPC, 2024 IMC, 2024 IFGC, 2024 IECC, and 2024 IEBC (all in force since July 1, 2026, superseding the 2021 editions), alongside the unchanged 2021 IRC and 2023 NEC — apply to Enoch City by default absent a documented independent city-level code-adoption ordinance; Enoch City's own website does not publish a distinct 'Current Adopted Codes' page listing specific ICC edition years (unlike Cedar City's dedicated codes page), so the state baseline is reported here rather than invented city-specific edition years.. Local amendments apply — see the Enoch City overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Enoch City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.