Sign Permit in Enoch City, Utah

Enoch City does not publish a standalone Sign Permit application, fee, or process. The city's current, in-force Code of Revised Ordinances, Title 9 'Licensing, Control and Regulation of Business and Construction,' Chapter 600 'Uniform Sign Code,' Section 9.600.647(A) states explicitly: 'No sign permits are required, but authorization for construction may be required by the building official at building permit application.' Where such authorization is required, sign construction documents (dimensions, materials, loads, stresses, anchorage) are filed with the Building Department as part of a standard Building Permit application, per Section 9.600.647(B), and priced under the same Uniform Building Code valuation-based Building Permit Fee (Fee Schedule Section 4.A) plus 1% state surcharge — no distinct sign fee line exists anywhere across Enoch's 9-chapter Fee Schedule (Chapters 1 through 9 reviewed in full, 2026-07-21). Off-premise/billboard signs along the I-15 corridor are separately called out in the Land Use Ordinance as requiring 'a building permit from the building department' (Section 12.2000.2005(B)) — again folded into the same base Building Permit Fee rather than a distinct sign fee.

Verified 2026-07-21 · Source

When you need this permit

  • Sign or sign structure requiring construction authorization at building permit application, per Code of Revised Ordinances Section 9.600.647(A)
  • No standalone sign permit exists; construction documents (dimensions, materials, and construction details including loads, stresses, and anchorage) are filed with the Building Department as part of the standard Building Permit application when authorization is required, per Section 9.600.647(B)
  • Written consent of the owner or lessee of the premises upon which the sign is to be erected, per Section 9.600.647(B)
  • Engineering calculations signed and sealed by a registered design professional where required by the International Building Code, per Section 9.600.647(B)
  • Master sign plan required before issuance of a certificate of occupancy for landlord- or single-owner-controlled multiple-occupancy development complexes, per Section 9.600.649(A)
  • Off-premise/billboard signs are permitted only along Interstate 15 on properly zoned property and require a building permit from the Building Department, per Section 12.2000.2005(B)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (Uniform Building Code valuation table)Sign construction authorization, where required, is priced under the same Uniform Building Code valuation-based Building Permit Fee plus 1% State of Utah surcharge as any other building permit work (Fee Schedule Section 4.A) — no distinct sign permit fee line exists. Confirmed by a full review of Fee Schedule Chapters 1 through 9 (2026-07-21): no 'sign' fee appears in Chapter 4 (Building Permit), Chapter 7 (Land Use, Sections 7.A-7.D: Annexation, Land Use Appeal, Plat Amendment, Zone Change only), or any other chapter.
Valuation-based; no static dollar figure published

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Enoch City?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Sign Construction Inspection

    Where a sign requires building permit authorization under Section 9.600.647(A), inspection of the sign's construction and anchorage is folded into the general Building Permit inspection process (see the Residential and Commercial Building Permit entries in this file); no separately named 'sign inspection' is published by Enoch City.

See the full Enoch City inspection guide — scheduling & re-inspection fees →

Tips

  • Enoch City's Uniform Sign Code (Sections 9.600.640 through 9.600.649) is a detailed, currently-in-force ordinance governing sign types, area, height, and placement by zone — but it explicitly exempts signs from needing their own permit (Section 9.600.647(A)); only the underlying building-permit authorization is required when the sign's construction warrants it.
  • Off-premise/billboard signs are the one sign type that clearly requires a building permit from the Building Department, and only along the I-15 freeway corridor on properly zoned property, per Section 12.2000.2005(B) of the Land Use Ordinance.
  • A master sign plan is required for shopping centers, planned industrial parks, or other multiple-occupancy developments before a certificate of occupancy is issued — confirm with the Building Department, (435) 586-1119, whether a specific commercial project qualifies.

Frequently asked questions

Enoch City requires a sign permit for: Sign or sign structure requiring construction authorization at building permit application, per Code of Revised Ordinances Section 9.600.647(A); No standalone sign permit exists; construction documents (dimensions, materials, and construction details including loads, stresses, and anchorage) are filed with the Building Department as part of the standard Building Permit application when authorization is required, per Section 9.600.647(B); Written consent of the owner or lessee of the premises upon which the sign is to be erected, per Section 9.600.647(B); Engineering calculations signed and sealed by a registered design professional where required by the International Building Code, per Section 9.600.647(B); Master sign plan required before issuance of a certificate of occupancy for landlord- or single-owner-controlled multiple-occupancy development complexes, per Section 9.600.649(A); Off-premise/billboard signs are permitted only along Interstate 15 on properly zoned property and require a building permit from the Building Department, per Section 12.2000.2005(B). If your project isn't listed, confirm with Enoch City Building Department (Community Development) at (435) 586-1119 before starting work.

In Enoch City, the published Building Permit Fee (Uniform Building Code valuation table) is: Valuation-based; no static dollar figure published. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Enoch City does not publish a plan-review timeline for this permit. Contact Enoch City Building Department (Community Development) at (435) 586-1119 for current turnaround.

You'll need: Building Permit Application; Sign Construction Documents. Depending on your project, Enoch City may also ask for: Master Sign Plan. See the required-documents checklist on this page for details on each.

Enoch City requires 1 inspection(s) for a sign permit, in order: Sign Construction Inspection. Schedule each through Enoch City Building Department (Community Development) ((435) 586-1119).

Apply through Enoch City Building Department (Community Development) at 900 East Midvalley Road, Enoch, UT 84721. Phone: (435) 586-1119, email: inspector@enochcity.org. Office hours: Monday–Thursday 9:00 AM – 4:30 PM, Friday 9:00 AM – 1:00 PM, per enochcityut.gov footer contact block and the city's official Water Meter, Connection & Deposit Info sheet (Rev 06 2015).. Official information: https://www.enochcityut.gov/building-department.html.

Enoch City, Utah has adopted: Uniform Building Code (UBC) valuation table — Enoch City's own Fee Schedule (hosting.civiclinq.com/enochcity/books/enoch-city-fee-schedule/4.A) states: 'Building permit fees are set by the Uniform Building Code.' This is the same 1997 UBC Table 1-A valuation-fee structure referenced by other small Utah cities in this corpus (e.g. Provo); Enoch's own published fee-schedule language uses 'Uniform Building Code' rather than citing a specific IBC/IRC edition year.; Statewide baseline per Utah Code § 15A-2-103: Utah's currently adopted statewide construction codes — the 2024 IBC (incl. Appendices C and J), 2024 IPC, 2024 IMC, 2024 IFGC, 2024 IECC, and 2024 IEBC (all in force since July 1, 2026, superseding the 2021 editions), alongside the unchanged 2021 IRC and 2023 NEC — apply to Enoch City by default absent a documented independent city-level code-adoption ordinance; Enoch City's own website does not publish a distinct 'Current Adopted Codes' page listing specific ICC edition years (unlike Cedar City's dedicated codes page), so the state baseline is reported here rather than invented city-specific edition years.. Local amendments apply — see the Enoch City overview page for the full list.

No. Enoch City's Code of Revised Ordinances, Section 9.600.647(A) (Uniform Sign Code), states: 'No sign permits are required, but authorization for construction may be required by the building official at building permit application.' Where a sign's construction requires such authorization, it is processed and priced through the standard Building Permit (Uniform Building Code valuation table plus 1% state surcharge) rather than a distinct sign permit or fee.