EV Charger / EVSE Permit — Enoch City, Utah · Requirements sheet
Reviewed 2026-07-20 · Source: https://hosting.civiclinq.com/enochcity/books/enoch-city-fee-schedule/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Enoch City, Utah
Enoch City does not publish a separate EV-charger/EVSE permit or fee category. The city's official Fee Schedule, Section 4.A ('Permit'), prices all building-permit work — including electrical — on the Uniform Building Code valuation table plus a 1% state surcharge, with no distinct EV-specific line item found as of 2026-07-19. EV charger installation is therefore handled as standard electrical work under the same valuation-based Building Permit; no dedicated EV dollar figure is asserted here.
Reviewed 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Enoch City
- Electrical work regulated statewide by the 2023 NEC (Utah Code § 15A-2-103(1)(g))
- 1 set of construction/electrical plans submitted to inspector@enochcity.org, per the Building Department's general application process
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
Field inspection of the EV charger circuit and installation, scheduled through the Building Department, (435) 586-1119.
See the full Enoch City inspection guide — scheduling & re-inspection fees →
Tips
- Enoch City has no separate EV-charger permit or fee category — the Fee Schedule (Section 4.A) prices all building-permit work, including electrical, on the Uniform Building Code valuation table.
- Confirm the exact fee for a standalone charger circuit with the Building Department before applying, since no EV-specific dollar figure is published.
- Enoch's separate plan-review fee (charged by the city's third-party plan reviewer) is not waivable even when a project's building permit fee is waived by City Council — confirm whether this applies to smaller electrical-only jobs like an EV charger install.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Enoch City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Enoch City's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Enoch City yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Enoch City lands. Privacy.
Other permits in Enoch City
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Enoch City project checklist
Describe your project once and get every permit, document, and fee it triggers in Enoch City — in one checklist. Free, for any city and any number of projects.
Get started →