Commercial Building Permit in Enoch City, Utah

Required for new commercial construction in Enoch City. Enoch City publishes a dedicated Commercial Building Permit Packet (rev. 1-21-2025), distinct from its residential and 'Other' (additions/remodels) packets, requiring zoning administrator site-plan sign-off before a building permit can be issued. The base fee follows the same Uniform Building Code valuation table plus 1% state surcharge used for residential permits; no commercial-specific plan-review percentage tier is published in Fee Schedule Section 4.B (which lists only garage/carport, remodel/addition, and new-home-by-size tiers).

Reviewed 2026-07-19 · Source

When you need this permit

  • New commercial construction
  • Site plan showing all ADA compliance, parking, signage, and landscaping requirements, signed off by the zoning administrator before a building permit can be issued
  • One digital set of plans (PDF), including site plan, civil, architectural, mechanical, plumbing, and electrical, structurally addressed and showing occupancy and construction type from the IBC
  • Geotechnical datasheet
  • Utah Prairie Dog Clearance
  • Signed energy code compliance documentation
  • Septic tank permit from the Southwest Utah Public Health Department, if applicable
  • Complete building permit application form
  • Dumpster and sanitary facilities on-site per Ordinance 2006-01-18-A

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 6 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (base, UBC valuation table)Enoch City Fee Schedule, Section 4.A 'Permit': 'Building permit fees are set by the Uniform Building Code. There is a one percent (1%) State of Utah surcharge added to the total building permit fee.' This section is not split by residential/commercial use type — the same base mechanism governs commercial permits.
Set by the Uniform Building Code valuation table, plus a 1% State of Utah surcharge on the total building permit fee.
Plan Review FeeEnoch City Fee Schedule, Section 4.B 'Plan Review' publishes only: garages/carports 10%, remodels/additions 20%, new homes under 2,000 sq ft 30%, 2,000–3,000 sq ft 35%, over 3,000 sq ft 40% — all explicitly tied to residential project types ('new homes'). No distinct commercial percentage tier was found in Section 4.B as browsed 2026-07-19 (the page is served as a JavaScript single-page application; content could not be independently re-verified beyond what is already documented for this jurisdiction's residential-building-permit entry). Omitted rather than assumed to match any residential tier.
Not published for commercial as a distinct percentage tier
Utility DepositEnoch City's official Water Meter, Connection & Deposit Info sheet (Rev 06 2015) — same deposit mechanism as residential; refunded once a Certificate of Occupancy is issued and the utility account is closed.
$250.00

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit permit actually take in Enoch City?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Temporary Power

    Per Enoch City's general Builder Inspection Checklist process, applicable to commercial as well as residential permits; call (435) 586-1119, allow 24–48 hours.

  2. 2

    Footing / Foundation

    Compaction Report required for footing inspection, per the general Builder Inspection Checklist.

  3. 3

    4-Way (Rough Electrical, Plumbing, Mechanical, Framing, Gas)

    Combined rough-in inspection.

  4. 4

    Final Inspection / Certificate of Occupancy

    Includes culvert, road, and bar-ditch or curb/gutter/street/sidewalk condition per the Building Permit Application's final-inspection scope.

See the full Enoch City inspection guide — scheduling & re-inspection fees →

Tips

  • Enoch City requires zoning administrator sign-off on the commercial site plan (ADA compliance, parking, signage, landscaping) BEFORE a building permit can be issued — a distinct pre-permit step not required on the residential packet.
  • Enoch's Fee Schedule Section 4.B (Plan Review) publishes percentage tiers only for garages/carports, remodels/additions, and new homes by size — no commercial-specific percentage is published, so confirm the applicable plan-review rate directly with the Building Department, (435) 586-1119, before budgeting a commercial project.
  • A dumpster and sanitary facilities are required at every construction site per Ordinance 2006-01-18-A, the same requirement documented for residential construction.
  • Enoch City has no standalone sign-permit process or fee: signage is regulated directly by the Zoning Ordinance's per-district standards (e.g. Chapter 18-7 for Commercial Zones caps business signs at 20% of the building front veneer, and separately limits development, civic, real estate, freestanding, and monument signs by square footage) and is reviewed as part of the commercial site plan sign-off described above. The one sign type the ordinance explicitly calls out as needing a permit is off-premise/billboard signage along the I-15 corridor, which 'require[s] a building permit from the building department' (Zoning Ordinance § 18-7.3.F) — billed under the same UBC-valuation Building Permit Fee as any other building permit, with no separate sign fee published. Checked the full Zoning Ordinance (rev. 5-20-2020) and Fee Schedule directly — no distinct 'sign permit' fee line exists anywhere in either document.
  • Enoch City contracts with the Cedar City Fire Department for fire protection and Wildland Fire Interface Management — per Enoch City's own official Fire Department page (enochcityut.gov/fire-department.html): 'Enoch City contracts with Cedar City Fire Department for fire protection and Wildland Fire Interface Management.' No distinct fire sprinkler or fire alarm permit fee, application, or plan-review line item was found published by Enoch City (checked the Commercial Building Permit Packet, rev. 1/21/2025, which asks only whether a fire sprinkler/alarm system exists via checkbox, with no associated fee) or by Cedar City's own Consolidated Fee Schedule (which likewise has no distinct fire sprinkler/alarm fee — see Cedar City's own jurisdiction entry). Fire suppression/alarm system work in Enoch commercial construction appears to be reviewed as part of the general commercial plan submittal rather than through a separate fee-bearing permit — confirm directly with the Enoch City Building Department, (435) 586-1119, before budgeting a project requiring sprinklers or alarms.

Frequently asked questions

Enoch City requires a commercial building permit for: New commercial construction; Site plan showing all ADA compliance, parking, signage, and landscaping requirements, signed off by the zoning administrator before a building permit can be issued; One digital set of plans (PDF), including site plan, civil, architectural, mechanical, plumbing, and electrical, structurally addressed and showing occupancy and construction type from the IBC; Geotechnical datasheet; Utah Prairie Dog Clearance; Signed energy code compliance documentation; Septic tank permit from the Southwest Utah Public Health Department, if applicable; Complete building permit application form; Dumpster and sanitary facilities on-site per Ordinance 2006-01-18-A. If your project isn't listed, confirm with Enoch City Building Department (Community Development) at (435) 586-1119 before starting work.

In Enoch City, the published Building Permit Fee (base, UBC valuation table) is: Set by the Uniform Building Code valuation table, plus a 1% State of Utah surcharge on the total building permit fee.. Additional published fees: Plan Review Fee — Not published for commercial as a distinct percentage tier; Utility Deposit — $250.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Enoch City does not publish a plan-review timeline for this permit. Contact Enoch City Building Department (Community Development) at (435) 586-1119 for current turnaround.

You'll need: Commercial Building Permit Packet; Site Plan (zoning administrator sign-off); One Digital Set of Plans (PDF); Geotechnical Datasheet; Utah Prairie Dog Clearance; Signed Energy Code Compliance Documentation. Depending on your project, Enoch City may also ask for: Septic Tank Permit. See the required-documents checklist on this page for details on each.

Enoch City requires 4 inspection(s) for a commercial building permit, in order: Temporary Power, Footing / Foundation, 4-Way (Rough Electrical, Plumbing, Mechanical, Framing, Gas), Final Inspection / Certificate of Occupancy. Schedule each through Enoch City Building Department (Community Development) ((435) 586-1119).

Apply through Enoch City Building Department (Community Development) at 900 East Midvalley Road, Enoch, UT 84721. Phone: (435) 586-1119, email: inspector@enochcity.org. Office hours: Monday–Thursday 9:00 AM – 4:30 PM, Friday 9:00 AM – 1:00 PM, per enochcityut.gov footer contact block and the city's official Water Meter, Connection & Deposit Info sheet (Rev 06 2015).. Official information: https://www.enochcityut.gov/building-department.html.

Enoch City, Utah has adopted: Uniform Building Code (UBC) valuation table — Enoch City's own Fee Schedule (hosting.civiclinq.com/enochcity/books/enoch-city-fee-schedule/4.A) states: 'Building permit fees are set by the Uniform Building Code.' This is the same 1997 UBC Table 1-A valuation-fee structure referenced by other small Utah cities in this corpus (e.g. Provo); Enoch's own published fee-schedule language uses 'Uniform Building Code' rather than citing a specific IBC/IRC edition year.; Statewide baseline per Utah Code § 15A-2-103: Utah's currently adopted statewide construction codes — the 2024 IBC (incl. Appendices C and J), 2024 IPC, 2024 IMC, 2024 IFGC, 2024 IECC, and 2024 IEBC (all in force since July 1, 2026, superseding the 2021 editions), alongside the unchanged 2021 IRC and 2023 NEC — apply to Enoch City by default absent a documented independent city-level code-adoption ordinance; Enoch City's own website does not publish a distinct 'Current Adopted Codes' page listing specific ICC edition years (unlike Cedar City's dedicated codes page), so the state baseline is reported here rather than invented city-specific edition years.. Local amendments apply — see the Enoch City overview page for the full list.

Per Enoch City's Commercial Building Permit Packet (rev. 1-21-2025), applicants must submit a zoning-administrator-approved site plan (ADA compliance, parking, signage, landscaping), a digital plan set (site, civil, architectural, mechanical, plumbing, electrical), a geotechnical datasheet, a Utah Prairie Dog Clearance, signed energy code compliance documentation, and a septic permit if applicable. The base Building Permit Fee follows the Uniform Building Code valuation table plus a 1% state surcharge; no commercial-specific plan-review percentage is published in the city's Fee Schedule.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Enoch City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Enoch City.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.