Commercial Building Permit — Bountiful, Utah · Requirements sheet
Verified 2026-07-19 · Source: https://www.bountifulutah.gov/file/ad1938cd-03e3-462d-934f-4c49a91568ac
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit in Bountiful, Utah
Required for new commercial building construction in Bountiful, governed by the 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 2026-07-01). Bountiful's fee schedule prices commercial building permits differently from residential: both the application fee and the plan review fee are set at 65% of the underlying (valuation-based) building permit fee, rather than a flat dollar amount. Apply through Cityinspect.
Verified 2026-07-19 · Source
When you need this permit
- New commercial building construction (shell, ground-up, or new structure)
- Electronic copy of plans and engineering
- Site plan to scale
- Structural engineering plan review
- SWPPP (Storm Water Pollution Prevention Plan)
- Energy code compliance documentation for the adopted 2024 IECC
- Contractor license number (Utah DOPL) Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. Show full citationHide
Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023), Engineering Fees — Building Permits (p.6): 'Commercial Building Permit Application Fee Each* 65% of Permit Fee' with footnote 'Application Fees will be credited to the total cost of the Building Permit.' Verified live from the PDF 2026-07-19.Bountiful City Ord. 2023-01, Engineering Fees — Building Permits (p.6): 'Building Valuation is based on current ICC valuation data' / 'Per 1997 Uniform Administrative Code.' Same formula applies to… Show full citationHide
Bountiful City Ord. 2023-01, Engineering Fees — Building Permits (p.6): 'Building Valuation is based on current ICC valuation data' / 'Per 1997 Uniform Administrative Code.' Same formula applies to residential and commercial; the 65% application and plan-review multipliers above are calculated against this base fee for commercial projects.Bountiful City Ord. 2023-01, Planning Fees — Land Use Development Fees (p.8): 'Architectural & Site Plan Review - Non-Residential $1,500.00.' Charged separately as preliminary and final review (see… Show full citationHide
Bountiful City Ord. 2023-01, Planning Fees — Land Use Development Fees (p.8): 'Architectural & Site Plan Review - Non-Residential $1,500.00.' Charged separately as preliminary and final review (see fee-schedule note: 'Architectural & Site Plan Review requires a separate payment for preliminary and final').Review timeline
Inspection process
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar, and anchor bolts, per 2024 IBC.
- 2
Framing / Structural
After framing, sheathing, and structural steel/concrete work — before insulation or wall cover.
- 3
MEP Rough-In
Electrical, plumbing, and mechanical rough-in inspected before walls closed.
- 4
Fire / Life Safety
Fire sprinkler and/or fire alarm rough-in and final, where required by the adopted IBC/IFC — coordinated with South Davis Metro Fire Agency.
- 5
Final
All work complete before certificate of occupancy is issued.
See the full Bountiful inspection guide — scheduling & re-inspection fees →
Tips
- Bountiful prices commercial permits as a percentage of the valuation-based base fee, not flat dollar tiers: both the application fee and plan review fee are 65% of the base Building Permit Fee, versus 29% plan review for residential single family.
- The South Davis Metro Fire impact fee for commercial buildings is charged per 5,000 sq ft (or fraction) rather than per unit as with residential.
- New commercial construction triggers a $4,000 Street Damage Cash Deposit per drive approach/access — double the $3,000 new-single-family-residential deposit.
- Architectural & Site Plan Review ($1,500 non-residential) is a separate Planning Department fee, billed for both preliminary and final review, in addition to the Building Department's permit and plan-review fees.
- Sign permits are not a separate fee line in Bountiful City — the Planning Fees table in Ordinance 2023-01 (Schedule of Rates and Fees, FY2023-2024, eff. May 9, 2023) lists 'Sign Permit' with the note 'See Engineering Dept. Fees (building permits)', meaning commercial signage is permitted and priced through this same Building Permit fee structure rather than a distinct sign fee. Sign design/placement standards for commercial zones are separately regulated under City Code Chapter 19 (Sign Regulations, Ord 2020.01), e.g. §§ 14-19-112 through 14-19-115 for the C-G, C-H, C-N, and DN zones.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bountiful building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Bountiful.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Bountiful's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Bountiful yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Bountiful lands. Privacy.
Other permits in Bountiful
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →