Commercial Building Permit in American Fork, Utah
Required for new commercial construction in American Fork, regulated by the state-adopted 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 7/1/2026 — American Fork's own Building Department page has not yet been updated to reflect the 2024 IBC as of 2026-07-16, per this file's codesAdopted notes). The city publishes a dedicated Commercial Plans Minimum Plan Requirements checklist. Fees are collected via an Up Front Partial Plan Review Fee followed by a complete plan review fee of 65% of the building permit fee, based on current ICC valuation tables.
Verified 2026-07-19 · Source
When you need this permit
- New commercial construction
- Complete construction plans submitted online — deferred submittals are not accepted, and separate permits for footings and foundations are not accepted, per American Fork City Commercial Plans Minimum Plan Requirements checklist
- Structural calculations and all applicable wet stamps (structural engineering, architect, electrical, plumbing, mechanical)
- ASHRAE 90.1 standards compliance (envelope, electrical, and mechanical ComCheck)
- Geotechnical Observation Study and ITE Transportation Impact Study
- Grease trap/sampling manhole per Timpanogos Special Service District compliance and Utah County Board of Health food preparation compliance, for food-service uses
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 21 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footing/Foundation
Before concrete pour, per standard IBC inspection sequence enforced by American Fork Building Division. Concrete inspections are given a one-hour scheduling window per Building Inspection Policies and Procedures (rev. 7/22/2024); no inspections take place between 12:00-1:00 PM.
- 2
Framing and MEP Rough-In
Structural framing, wall sections, and electrical/mechanical/plumbing rough-in verified per the Commercial Plans Minimum Plan Requirements checklist (floor plan including electrical, mechanical, and plumbing; wall sections; roof or truss detail).
- 3
Energy Compliance (ASHRAE 90.1 / ComCheck)
ASHRAE 90.1 standards compliance verified via ComCheck (envelope, electrical, and mechanical) per American Fork's Commercial Plans checklist; lot, subdivision, and/or plan number must be on the submittal.
- 4
Final / Certificate of Occupancy
All work complete; Occupancy Fee ($150.00 commercial) applies per American Fork City Adopted Fee Schedule.
See the full American Fork inspection guide — scheduling & re-inspection fees →
Tips
- American Fork's Commercial Plans Minimum Plan Requirements checklist requires items beyond typical residential submittals: a Geotechnical Observation Study, an ITE Transportation Impact Study, ASHRAE 90.1 / ComCheck energy compliance, and — for food-service uses — a grease trap/sampling manhole per Timpanogos Special Service District compliance and Utah County Board of Health food preparation compliance.
- Deferred submittals are not accepted, and separate permits for footings and foundations are not accepted, per the Commercial Plans checklist — all construction plans must be submitted online as a complete package.
- The Up Front Partial Plan Review Fee ($1,000.00 for new commercial) is a deposit; the complete plan review fee is 65% of the building permit fee based on current ICC valuation tables, per the city's Adopted Fee Schedule.
- Concrete inspections require specifying a one-hour inspection window; no inspections are performed between 12:00 PM and 1:00 PM, per Building Inspection Policies and Procedures (rev. 7/22/2024).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the American Fork building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in American Fork.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in American Fork
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →