Residential Addition / Remodel / Basement Finish Permit in American Fork, Utah

Required for additions, remodels, and basement finishes in American Fork, including electrical, plumbing, and structural changes. Fees are valuation-based per the ICC Valuation Table (Unfinished Basement / Finished Basement line items).

Verified 2026-07-04 · Source

When you need this permit

  • Finishing an unfinished basement
  • Remodeling existing layout — moving/removing/adding doors, windows, or walls
  • Adding or removing beams (requires wet-stamped structural engineering)
  • Upgrading smoke detectors and carbon monoxide detectors in the existing home to current IRC requirements

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 6 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (Basement — Unfinished/Finished)American Fork City Adopted Fee Schedule (effective 7/1/2025), p.10, Residential Building Division Fees: 'Unfinished Basement — Based on ICC Valuation Table; Finished Basement — Based on ICC Valuation Table.'
Based on ICC Valuation Table
Basement Plan Review FeeAmerican Fork City Adopted Fee Schedule (effective 7/1/2025), p.11, Other Building Division Fees: 'Basement Plan Review Fee - per — $75.00.'
$75.00
Plan Review FeeAmerican Fork City Adopted Fee Schedule (effective 7/1/2025), p.10.
65% of the building permit fee (per state code 10-9a-510)
Plan Revision FeeAmerican Fork City Adopted Fee Schedule (effective 7/1/2025), p.10: 'Plan Revision Fee per hour — $50.00.'
$50.00 per hour

Review timeline

Plan review
Not published — contact the department

How long did your Residential Addition / Remodel / Basement Finish Permit permit actually take in American Fork?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Framing

    Wall framing, fire blocking, egress window openings verified per American Fork checklist requirements.

  2. 2

    MEP Rough-In

    Electrical and plumbing rough-in per basement/remodel layout submitted.

  3. 3

    Final

    Smoke detectors and carbon monoxide detectors upgraded to current IRC requirements throughout the home, not just the finished area, per American Fork Basement Finish/Remodel checklist.

See the full American Fork inspection guide — scheduling & re-inspection fees →

Tips

  • Basement Finish/Remodel permits require ALL smoke detectors and carbon monoxide detectors in the existing home (not just the new area) to be upgraded to current IRC requirements.
  • Plans may be drawn by the homeowner but must be to scale and legible; beam/wall changes require a Utah-licensed structural engineer's wet stamp.
  • A complete subcontractor list is required to be filled out for both basement finish and remodel permits.

Frequently asked questions

Yes. American Fork requires a building permit for basement finishes, charged on the ICC Valuation Table plus a $75 basement plan review fee and the standard 65% plan review fee. All smoke and carbon monoxide detectors in the home must be upgraded to current IRC requirements as part of the permit.

In American Fork, the published Building Permit Fee (Basement — Unfinished/Finished) is: Based on ICC Valuation Table. Additional published fees: Basement Plan Review Fee — $75.00; Plan Review Fee — 65% of the building permit fee (per state code 10-9a-510); Plan Revision Fee — $50.00 per hour. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

American Fork does not publish a plan-review timeline for this permit. Contact American Fork City Building Department at 801-763-3060 for current turnaround.

You'll need: General Basement Layout; Electrical/Plumbing Layout; Existing and Proposed Layout of Home (Remodel); Wet-Stamped Structural Engineering; Project Valuation; Contractor/Subcontractor Information. See the required-documents checklist on this page for details on each.

American Fork requires 3 inspection(s) for a residential addition / remodel / basement finish permit, in order: Framing, MEP Rough-In, Final. Schedule each through American Fork City Building Department (801-763-3060).

Apply through American Fork City Building Department at 275 East 200 North, American Fork, UT 84003. Phone: 801-763-3060. Office hours: Mon–Thu 7:00 AM – 6:00 PM (Building Division checklists list a separate plan-submittal contact line 801-763-3065); closed Fridays, per American Fork City Building Inspection Policies and Procedures (rev. 7/22/2024).. Official information: https://www.americanfork.gov/173/Building-Department.

American Fork, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition American Fork's official Building Department page still stated as of live-check 2026-07-16: 'the American Fork Building Department uses the 2021 IBC and IRC Code as adopted by the State of Utah,' effective July 1, 2023, per americanfork.gov/173/Building-Department. The 2021 edition applied under the prior version of § 15A-2-103; American Fork's page has not been updated to reflect the 7/1/2026 transition.; 2021 International Residential Code (IRC) — REMAINS CURRENT, Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 amendment; americanfork.gov/173/Building-Department's statement is correct on this point (no update needed for IRC).; 2020 National Electrical Code (NEC) as published by American Fork's own Solar Minimum Plan Requirements checklist — STALE even under the PRIOR version of the statute: the checklist (americanfork.gov/DocumentCenter/View/13852/Solar-Checklist) explicitly cites '2020 NEC 690.4(C)' and multiple other 2020 NEC section references (690.7, 690.12, 706.15(C), 230.71, 230.62(C)), fetched 2026-07-04 and unconfirmed changed since. The statewide-governing NEC edition is, and remains, the 2023 NEC per Utah Code § 15A-2-103(1)(g) — unchanged by the 7/1/2026 amendment, but American Fork's own document has not been updated to reference it, a pre-existing discrepancy independent of the 2026 code-cycle transition (the same kind of stale-document issue documented for Provo's Building FAQ in provo.json). Reported here as-published rather than corrected, per grounded-data policy of not inventing a fact the city's own source does not state.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); required per American Fork City Residential Plans Minimum Plan Requirements checklist (americanfork.gov/DocumentCenter/View/58/Residential-Plan-Checklist): 'Utah Energy Conservation Code requirements. Must have lot, subdivision, and plan number on the Res check submittal.' The checklist itself does not state a specific edition year — the 2024 edition is added here per statute.; Utah statewide baseline construction code editions per Utah Code § 15A-2-103, effective 7/1/2026 (superseded 1/1/2027): 2024 IPC (§(1)(d)), 2024 IMC (§(1)(e)), 2024 IFGC (§(1)(f)), 2024 IEBC (§(1)(i)), and the residential provisions of the 2024 ISPSC (§(1)(n)) — none separately itemized on americanfork.gov/173/Building-Department or in American Fork's own checklists; added here per statute since American Fork's own materials omit them.; NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. American Fork's Building Department page (americanfork.gov/173/Building-Department) was live-checked 2026-07-16 and IS STILL LAGGING: it verbatim states 'Beginning July 1, 2023, The American Fork Building Department will be using the 2021 IBC and IRC Code as adopted by the State of Utah' with no update reflecting the 2024 IBC. The IRC portion of that statement remains accurate (2021 IRC is unchanged). No newer American Fork-specific code-adoption notice was found. The Utah Code § 15A-2-103 citation has been added to the sources array below, pointing to the current in-force version link.. Local amendments apply — see the American Fork overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-04.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the American Fork building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.