Residential Addition / Remodel Permit in Brigham City, Utah

Required for additions and remodels to existing single-family dwellings in Brigham City, per the city's official Residential Addition/Remodel Submittal Requirements sheet. Uses the same valuation-based Building Permit Fee and Plan Review Fee structure as new construction, but impact fees do NOT apply to additions/alterations/repairs per the city's own Building Fees worksheet.

Verified 2026-07-07 · Source

When you need this permit

  • One (1) complete set of plans (electronic or PDF): site plan, elevation drawings (side views of project), wall sections/sectional drawings, floor plan
  • Building Permit Application complete with General/Electrical/Plumbing/Mechanical Contractor names and license numbers (or 'self' if owner-performed)
  • Structural engineering required for additions or major remodels unless a simple 'box type' addition, per the city's stated seismic zone and structural requirements
  • An email address is required for inspection results

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee / Plan Review FeeBrigham City official Building Fees worksheet; the same Building Permit Fee (701) and 15% Plan Review Fee (706) methodology applies to additions/remodels as to new construction, based on the declared project valuation.
Valuation-based, same fee-code structure as new construction (codes 701/706)
Impact FeesBrigham City official Building Fees worksheet explicitly states: 'Impact fees are included in all new single family dwelling permits. Additions, alterations, repairs do not include impact fees.'
Not applicable

Review timeline

Plan review
Not published — contact the department

How long did your Residential Addition / Remodel Permit permit actually take in Brigham City?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Required Inspections (per official Building Fees worksheet checklist)

    Same inspection checklist as new construction applies as relevant to the scope of work: Footings/Foundations/Setbacks, Underground plumbing, Exterior sheeting/vapor barrier, 4-way rough (Framing/Electrical/Plumbing/HVAC), Insulation, Power to panel, Final Inspection.

See the full Brigham City inspection guide — scheduling & re-inspection fees →

Tips

  • Unlike new construction, additions/remodels do not require Manual J/Manual D mechanical design documents or Storm Water Permit Applications, per the city's dedicated Addition/Remodel submittal sheet.
  • If the homeowner is performing the work themselves rather than hiring a contractor, the official form instructs writing 'self' on the contractor line.
  • Impact fees do not apply to additions, alterations, or repairs — only to new single-family dwelling permits, per the city's own Building Fees worksheet.

Frequently asked questions

Brigham City requires a residential addition / remodel permit for: One (1) complete set of plans (electronic or PDF): site plan, elevation drawings (side views of project), wall sections/sectional drawings, floor plan; Building Permit Application complete with General/Electrical/Plumbing/Mechanical Contractor names and license numbers (or 'self' if owner-performed); Structural engineering required for additions or major remodels unless a simple 'box type' addition, per the city's stated seismic zone and structural requirements; An email address is required for inspection results. If your project isn't listed, confirm with Brigham City Community and Economic Development Department (Building Division) at (435) 734-6604 before starting work.

In Brigham City, the published Building Permit Fee / Plan Review Fee is: Valuation-based, same fee-code structure as new construction (codes 701/706). Additional published fees: Impact Fees — Not applicable. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Brigham City does not publish a plan-review timeline for this permit. Contact Brigham City Community and Economic Development Department (Building Division) at (435) 734-6604 for current turnaround.

You'll need: Brigham City Residential Building Permit Submittal Requirements (Home Addition/Remodel). See the required-documents checklist on this page for details on each.

Brigham City requires 1 inspection(s) for a residential addition / remodel permit, in order: Required Inspections (per official Building Fees worksheet checklist). Schedule each through Brigham City Community and Economic Development Department (Building Division) ((435) 734-6604).

Apply through Brigham City Community and Economic Development Department (Building Division) at 20 N. Main, 2nd Floor, Brigham City, UT 84302. Phone: (435) 734-6604, email: thalladay@bcutah.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM, closed major holidays, per Brigham City's official Building Permits and Inspections page. Building Official: Tracy Halladay, (435) 734-6628, thalladay@bcutah.gov (permits, inspections, plan review, code analysis, code interpretation). Building Inspector: Kyle Holgreen, (435) 734-6611, kholgreen@bcutah.gov. Permit Technician: Destry Larsen, (435) 734-6604, dlarsen@bcutah.gov (permit processing, inspection scheduling, application submittal, customer service).. Official information: https://www.bcutah.gov/o/brighamcity/page/building-permits-and-inspections.

Brigham City, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition that Brigham City's own official 'Design Criteria for Buildings and Structures Located within Brigham City Limits' document (dated 7/25/2023) still cited as of live re-fetch 2026-07-16 (2021 IBC Section 1803 soils reports, Section 1613.2.2 Site Class, Table 1806.2 and Table 1610.1 bearing pressures) — the document has not been updated to reflect the 2024 edition.; Utah Title 15A statewide amendments apply on top of the base ICC codes per state law; Brigham City's official Design Criteria document references the Utah-amended ground snow load calculation methodology (previously cited to Utah Code § 15A-3-107, which governs statewide amendments) directly. Construction-code editions themselves are governed by § 15A-2-103, not § 15A-3-107.; 2021 International Residential Code (IRC) — REMAINS CURRENT, Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 amendment. Brigham City's own 'Single Family Dwelling Building Permit Submittal Requirements' and Roof Building Paper Requirements handouts instead cite the 2015 IRC/IECC by name for specific engineering/energy-compliance documentation — a pre-existing discrepancy independent of the 2026 code-cycle transition (these handouts were already citing an older cycle than the state's 2021 IRC baseline before 7/1/2026, and remain unrevised as of 2026-07-16). Reproduced here exactly as currently published by the city; the current statewide-governing IRC edition is 2021, not 2015.; 2024 International Plumbing Code (IPC), 2024 International Mechanical Code (IMC), 2024 International Fuel Gas Code (IFGC), 2024 International Energy Conservation Code (IECC, single unsplit statewide edition), 2024 International Existing Building Code (IEBC), and the residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — all CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d)/(e)/(f)/(h)/(i)/(n). None are separately itemized in Brigham City's own published Design Criteria document, submittal-requirement handouts, or Building Permits and Inspections page; added here per statute since Brigham City's own materials omit them (the 2015 IECC cited in the city's Roof Building Paper Requirements handout is likewise superseded, per the IRC entry above).; 2023 National Electrical Code (NEC) — statewide per Utah Code § 15A-2-103(1)(g); REMAINS CURRENT, unchanged by the 7/1/2026 amendment. Not separately itemized in Brigham City's own published materials; added here per statute.; NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Brigham City's Design Criteria for Buildings and Structures document (the sole cited source for Brigham City's IBC edition) was live re-fetched 2026-07-16 and IS STILL LAGGING — it references 2021 IBC sections throughout with no indication of a later revision date than 7/25/2023. No newer Brigham City-specific code-adoption publication was found on bcutah.gov. The Utah Code § 15A-2-103 citation has been added to the sources array below, pointing to the current in-force version link.. Local amendments apply — see the Brigham City overview page for the full list.

No. Per Brigham City's official Building Fees worksheet, impact fees (Storm Drain, Water, Sewer, Parks and Recreation, Electric, Fire, Transportation, Police) are included only in new single-family dwelling permits; additions, alterations, and repairs do not include impact fees.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Brigham City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.