Brigham City building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Brigham City, Utah.
Verified 2026-07-07 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 20 N. Main, 2nd Floor, Brigham City, UT 84302
- Phone
- (435) 734-6604
- thalladay@bcutah.gov
- Office hours
- Mon–Fri 8:00 AM – 5:00 PM, closed major holidays, per Brigham City's official Building Permits and Inspections page. Building Official: Tracy Halladay, (435) 734-6628, thalladay@bcutah.gov (permits, inspections, plan review, code analysis, code interpretation). Building Inspector: Kyle Holgreen, (435) 734-6611, kholgreen@bcutah.gov. Permit Technician: Destry Larsen, (435) 734-6604, dlarsen@bcutah.gov (permit processing, inspection scheduling, application submittal, customer service).
- Website
- Official site
Inspection sequence
Applies to: Residential Solar / PV System (Distributed Generation Interconnection)
- 1
Preliminary Onsite Inspection
Brigham City Power performs a preliminary onsite inspection before referring the application to WC3 for design review, per the official Solar Power page.
- 2
WC3 Design Review
West Coast Code Consultants (WC3) conducts the system design review; paid directly to WC3, separate from Brigham City's own permit fees.
- 3
WC3 Post-Installation Inspection
Scheduled by calling WC3 inspector Josh Goodman at (801) 455-0029 following system installation; paid to WC3.
- 4
Permission to Operate
Once WC3's final inspection is received, Brigham City issues a 'Permission to Operate' letter authorizing the system to be turned on.
Applies to: Commercial Tenant Improvement / Tenant Finish Permit
- 1
Rough-In
Rough electrical, plumbing, or mechanical inspection before wall closure, as applicable to the scope of the tenant improvement
- 2
Final
Completed work verified before reoccupancy
Applies to: Fire Sprinkler System Permit
- 1
Fire Marshal / Code Analysis Plan Review
Sprinkler-required/provided status and system type are reviewed as part of the Code Analysis worksheet accompanying the Commercial Building Permit; the Fire Marshal may require additional information per the worksheet's own instructions.
- 2
Fire Sprinkler Final Inspection
Conducted as part of the standard commercial building-permit inspection sequence prior to occupancy; Brigham City does not publish a separate fire-sprinkler-specific inspection checklist.
Final inspection only: Change of Use / Change of Occupancy, Commercial Building Permit, Detached Accessory Structure Permit (Garages, Sheds, etc.), EV Charger / EVSE Permit, Fire Alarm System Permit, Residential Addition / Remodel Permit, Residential Building Permit (New Single-Family Dwelling), Sign Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Brigham City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Brigham City building permits
Get alerts for Brigham City
We'll email you when Brigham City's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.