Commercial Building Permit — Clearfield, Utah · Requirements sheet
Verified 2026-07-19 · Source: https://clearfield.city/wp-content/uploads/2025/08/Adopted-Consolidated-Fee-062525.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit in Clearfield, Utah
Required for new commercial building construction in Clearfield, governed by the 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 7/1/2026; Clearfield's own Design Criteria and Adopted Codes document, rev. 9/29/2023, is confirmed still listing the 2021 IBC as of live re-check 2026-07-16). All commercial/industrial submittals must complete a Pre-Submittal Process before full plan review, per the city's Commercial Plans Submittal Checklist. The base Building Permit Fee uses the same valuation chart as residential, but commercial plan check, plan check deposit, and off-site bonds are all priced differently and higher.
Verified 2026-07-19 · Source
When you need this permit
- New commercial building construction, on a lot with completed Pre-Submittal Process (contact Building Department at (801) 525-2700 to begin)
- Copy of current ownership plat from Davis County for the lot
- 2 site plans showing lot lines, dimensions, drainage/grading, and exact sewer/water tie-ins
- 2 complete sets of construction drawings and engineering packets with structural calculations — minimum 1 original 'wet' stamped set required
- Compliance with the currently adopted IECC (2024 statewide, per Utah Code § 15A-2-103(1)(h))
- NDSD (North Davis Sewer District) and NDFD (North Davis Fire District) impact fee worksheets
- 2 complete sets of engineered plans (one full size, one 11x17) for the Commercial Plans Submittal Checklist
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar, and anchor bolts, per 2024 IBC.
- 2
Framing / Structural
After framing, sheathing, and structural steel/concrete work — before insulation or wall cover.
- 3
MEP Rough-In
Electrical, plumbing, and mechanical rough-in inspected before walls closed.
- 4
Fire Sprinkler / Fire Alarm
Fire Department review and approval of the two required complete sets of fire sprinkler plans, per the Commercial Plans Submittal Checklist.
- 5
Final
All work complete, handicap accessibility features verified per current IBC and ANSI A-117.1, before occupancy.
See the full Clearfield inspection guide — scheduling & re-inspection fees →
Tips
- Clearfield requires a Pre-Submittal Process BEFORE full commercial/industrial plan submittal — call the Building Department at (801) 525-2700 to begin; submittals are not accepted without the completed and approved Pre-submittal Information form.
- Commercial plan check is tiered by building value (65% for $1–$100,000, stepping down to 50% above $500,001) — the opposite direction of a flat rate, and far higher than the 20% residential plan-check rate.
- The $250 commercial plan check deposit (vs. $100 residential) matches the standalone '$250 Plan submittal fee' printed on the New Commercial Building Permit Checklist form.
- Commercial off-site bonds are NOT a flat fee (unlike the $2,000 residential bond) — they're set 'as per City Engineer's cost estimate,' so budget for a project-specific quote.
- New commercial construction requires separate NDSD (North Davis Sewer District) and NDFD (North Davis Fire District) impact fee worksheets, obtained directly from those special districts, not from the city.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clearfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Clearfield.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Clearfield
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →