Fire Sprinkler System Permit — Clearfield, Utah · Requirements sheet
Verified 2026-07-21 · Source: https://www.northdavisfireut.gov/fee-schedule
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Fire Sprinkler System Permit in Clearfield, Utah
Required for installation of an automatic fire sprinkler system in Clearfield. Clearfield is a member city of North Davis Fire District (NDFD) — confirmed live 2026-07-21 via NDFD's own Fire Marshal page, which states Deputy Fire Marshal Mike Rawlings serves 'Clearfield, Sunset, West Point, and areas of unincorporated Davis County.' NDFD's Fire Marshal's Office handles fire sprinkler plan review and permitting separately from Clearfield's own building permit process; this matches Clearfield's own Commercial Plans Submittal Checklist, which requires '(2) complete sets of fire sprinkler plans to be submitted for Fire Department review and approval' (item 13) as part of any commercial building or tenant-finish permit.
Verified 2026-07-21 · Source
When you need this permit
- Installation of an automatic fire sprinkler system, sized by square footage of the protected building
- Two (2) complete sets of fire sprinkler plans submitted for Fire Department (NDFD) review and approval, per Clearfield's Commercial Plans Submittal Checklist — showing bracing/seismic requirements, riser detail, and electrical information
- Plan review and permit from North Davis Fire District's Fire Marshal's Office, in addition to the City building permit
- NDFD impact fee worksheet (obtained directly from North Davis Fire District) required as part of the Commercial Plans Submittal Checklist
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Flow Test
One of 3 inspections included in the $300 permit fee.
- 2
Hydrostatic Test
One of 3 inspections included in the $300 permit fee.
- 3
Final
Final of the 3 inspections included in the $300 permit fee.
See the full Clearfield inspection guide — scheduling & re-inspection fees →
Tips
- Clearfield's own building permit process does not itself review fire sprinkler plans — its Commercial Plans Submittal Checklist requires the applicant to submit 2 complete sets of fire sprinkler plans for Fire Department (NDFD) review and approval as a component of the overall commercial building or tenant-finish permit.
- NDFD's sprinkler plan review fee is tiered by square footage ($250 up to 3,000 sq ft, $350 for 3,001-10,000 sq ft, $0.005/sq ft over 10,000 sq ft beyond that point), but the $300 permit fee (3 inspections) is flat across all three tiers.
- A separate $300 Fire Pump Plan Review fee applies if the sprinkler system design includes a fire pump.
- Contact NDFD's Fire Marshal's Office directly (801-525-2850) to coordinate fire sprinkler plan review timing alongside the City's own Commercial Building or Tenant Improvement permit review.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-21.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clearfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Clearfield
Fire Sprinkler System Permit in other cities
Compare fire sprinkler system permit fees across Utah →
Look up this fee in a different city →