Commercial Building Permit in Clinton, Utah
Required for new commercial building construction (including shell-only buildings) in Clinton, governed by the 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 2026-07-01; Clinton's own Design Criteria document, rev. 07/03/2023, has not been confirmed updated to reflect this transition). Fees use the same valuation-based Building Permit Fee table as residential, with the standard 0.85 permit-fee multiplier applying to new commercial construction — except shell-only buildings, which get a lower 0.80 multiplier. Commercial plan review (65% of the building fee) and a $45 commercial technology fee apply on top.
Verified 2026-07-19 · Source
When you need this permit
- New commercial building construction (ground-up or shell)
- Plans and specifications in duplicate (or as otherwise required by the Building Official) per Clinton City Code § 5-1-2
- Commercial Site Plan Review approval for commercial and/or non-residential subdivision projects, tiered by gross site acreage
- SWPPP (Storm Water Pollution Prevention Plan) review for commercial development
- Building Bond (commercial): $75.00 per linear foot of curb, gutter, sidewalk for new construction
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Clinton City Consolidated Fee Schedule, FY 2026-27, 'Building Permit Fees' page (Modified FY 2005): 'Permit Fee Multiplier 0.85 EXCEPT THE FOLLOWING: Shell Only Building 0.80, Commercial Tenant… Show full citationHide
Clinton City Consolidated Fee Schedule, FY 2026-27, 'Building Permit Fees' page (Modified FY 2005): 'Permit Fee Multiplier 0.85 EXCEPT THE FOLLOWING: Shell Only Building 0.80, Commercial Tenant Finish 0.35, Commercial Remodel 0.60.' The schedule does not list a separately lower multiplier specific to 'new commercial construction' beyond the shell-only exception, so ground-up commercial construction uses the standard 0.85 multiplier unless it qualifies as shell-only.Clinton City Consolidated Fee Schedule, FY 2026-27, Building Fees table: 'Commercial / Primary Building Structures est. Show full citationHide
Clinton City Consolidated Fee Schedule, FY 2026-27, Building Fees table: 'Commercial / Primary Building Structures est. 2001 — 65% of the Bldg. Fee' and 'Accessory Building est. 2001 — 65% of the Bldg. Fee.' That is more than double the 30% single-family residential plan review rate.Review timeline
Inspection process
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar, and anchor bolts, per 2024 IBC.
- 2
Framing / Structural
After framing, sheathing, and structural work — before insulation or wall cover.
- 3
MEP Rough-In
Electrical, mechanical, and plumbing rough-in inspected before walls closed.
- 4
Final
All work complete — certificate of occupancy issued upon passing.
See the full Clinton inspection guide — scheduling & re-inspection fees →
Tips
- Clinton's Permit Fee Multiplier table treats 'Shell Only Building' (0.80) as the sole commercial-new-construction discount off the standard 0.85 multiplier — full ground-up commercial construction that isn't shell-only uses the standard 0.85 rate, same as most residential work.
- Commercial plan review (65% of the building fee) is more than double the 30% single-family residential rate, and the $45 commercial technology fee is 50% higher than the $30 residential rate.
- Commercial Building Bonds are NOT a flat dollar figure like the $1,500 residential bond — they're charged at $75.00 per linear foot of curb, gutter, and sidewalk, which scales with frontage.
- Commercial and non-residential subdivision projects require a separate Site Plan Review fee (tiered by gross acreage, starting at $655 + $210/acre) on top of the Building Department's permit and plan-review fees.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clinton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Clinton.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Property Access
Clinton's permit history is searchable by address
3,887 permits on record for Clinton, 2009–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
Other permits in Clinton
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Clinton project checklist
Describe your project once and get every permit, document, and fee it triggers in Clinton — in one checklist. Free, for any city and any number of projects.
Get started →