EV Charger / EVSE Permit — Clinton, Utah · Requirements sheet
Reviewed 2026-07-20 · Source: https://www.clintoncity.net/DocumentCenter/View/4595/2026-Fee-Schedule---Final---20250701
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Clinton, Utah
Clinton City does not publish a distinct "EV Charger" or "EVSE" fee line item. Its Consolidated Fee Schedule (FY 2026-27) bills additions or modifications to existing electrical systems under a single valuation-based Building Permit Fee category ('Additions or Modifications to Existing Structures; Structural, Plumbing, Mechanical, and/or Electrical Systems'), assessed per Section 304 of the 1997 Uniform Administrative Code, Section 109 of the IBC, and Section R108 of the IRC — the same clause covering all trade work, not a specific EV category. A full-text search of the current fee schedule found no mention of "EV," "EVSE," "electric vehicle," or "charging station."
Reviewed 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property within Clinton City
- Dedicated 240V circuit and/or panel capacity installed by a licensed electrician Contractor
- Building permit filed with Clinton City for the electrical modification, valued per Section 304 UAC / Section 109 IBC / Section R108 IRC
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
Inspection of the new circuit/equipment by Clinton City as part of the standard electrical/building permit process.
See the full Clinton inspection guide — scheduling & re-inspection fees →
Tips
- Clinton bills EV charger installations under its general 'Additions or Modifications to Existing Structures' valuation-based fee clause, not a dedicated EV category — confirm the assigned valuation with the Building Department before applying.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clinton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Clinton
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Clinton project checklist
Describe your project once and get every permit, document, and fee it triggers in Clinton — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →