Plumbing Permit in Bountiful, Utah

Required for plumbing installations, alterations, and repairs in Bountiful including water heaters, fixture additions, and gas line work. Governed by the 2024 IPC (Utah Code § 15A-2-103(1)(d)), effective July 1, 2026 (superseded the 2021 edition). Apply through Cityinspect.

Verified 2026-07-01 · Source

When you need this permit

  • New plumbing fixture installations (sinks, toilets, showers)
  • Water heater installation or replacement
  • Water line or sewer line replacement or extension
  • Gas line installation or modification
  • Backflow prevention device installation

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Single Inspection Permit (minor plumbing)Bountiful City Ord. 2023-01, Schedule of Rates and Fees FY2023-2024 (eff. May 9, 2023). Bountiful does not publish a separate fixture-count or per-fixture fee table.
$75.00 (plus state surcharge ~1%)
Plumbing Permit (larger projects)Grounded/verified: assessed on project valuation per Bountiful's published fee schedule (Ord. 2023-01, Schedule of Rates and Fees FY2023-2024, eff. May 9, 2023, Engineering Fees — Building Permits section, p.6), re-confirmed live 2026-07-01.
Valuation-based per 1997 Uniform Administrative Code (current ICC data)

Review timeline

Plan reviewTypical estimate — confirm current times with the Bountiful building department
~1–7 business days

How long did your Plumbing Permit permit actually take in Bountiful?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Underground / Slab

    Before concrete pour — verify pipe slope, materials, and cleanouts

  2. 2

    Rough-In

    After pipes installed, before walls closed — pressure test required

  3. 3

    Final

    All fixtures connected, water flowing, no leaks, proper venting verified

See the full Bountiful inspection guide — scheduling & re-inspection fees →

Tips

  • Bountiful follows the 2024 IPC (Utah Code § 15A-2-103(1)(d)), effective July 1, 2026 (superseded the 2021 edition).
  • Water heater replacements require a permit even for like-for-like swaps.
  • Utah law allows homeowners to perform plumbing work on their own primary residence, but a permit and inspections are still required.
  • Bountiful does not publish a per-fixture plumbing fee schedule — the $75 Single Inspection Permit covers most small plumbing jobs.

Frequently asked questions

Yes. Bountiful requires a plumbing permit for all water heater replacements, including like-for-like swaps. The fee is $75 Single Inspection Permit (plus ~1% state surcharge). (Ord. 2023-01)

Minor plumbing work requiring a single inspection costs $75 plus ~1% state surcharge per Ord. 2023-01 (eff. May 9, 2023). Larger projects use valuation-based fees. Bountiful does not publish a separate fixture-count fee schedule.

Plan review for a plumbing permit in Bountiful typically runs 1–7 business days. This is an estimate, not a published figure — confirm current review times with Bountiful City Building Department at (801) 298-6125.

You'll need: Building Permit Application (Cityinspect). Depending on your project, Bountiful may also ask for: Utah Plumbing Contractor License (DOPL). See the required-documents checklist on this page for details on each.

Bountiful requires 3 inspection(s) for a plumbing permit, in order: Underground / Slab, Rough-In, Final. Schedule each through Bountiful City Building Department ((801) 298-6125).

Apply through Bountiful City Building Department at 795 South Main Street, Bountiful, UT 84010. Phone: (801) 298-6125, email: tbasinger@bountiful.gov. Office hours: Mon–Thu 7:00 AM – 6:00 PM (permits issued until 5:30 PM); closed Fri–Sun. Official information: https://www.bountifulutah.gov/Building.

Bountiful, Utah has adopted: 2021 International Residential Code (IRC) with Appendices AE and AQ — residential construction; as adopted by the State of Utah (Utah Code § 15A-2-103(1)(b)/(k)/(c)); unaffected by the 7/1/2026 statute revision, continues in force; Bountiful Design Criteria, rev. Oct 13, 2025; 2015 International Residential Code Chapter 11 (residential energy provisions) — per Bountiful Design Criteria, rev. Oct 13, 2025 (statewide residential energy baseline per Utah Code § 15A-2-103); 2024 International Building Code (IBC) with Appendices C and J — commercial construction; Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition; 2024 International Mechanical Code (IMC) — commercial; Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition; 2024 International Plumbing Code (IPC) — commercial; Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition; 2024 International Fuel Gas Code (IFGC) — commercial; Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition; 2024 International Energy Conservation Code (IECC) — commercial; Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition; 2021 International Fire Code (IFC) — commercial; Bountiful Design Criteria, rev. Oct 13, 2025; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition; CONFIRMED 2026-07-17: the live Bountiful Design Criteria PDF (still dated Rev. October 13, 2025, unchanged/not reissued) explicitly lists '2021 International Swimming Pool and Spa Code' — the city has NOT yet published an updated Design Criteria reflecting the 2024 ISPSC (or the other 2024 commercial code editions) despite the statute taking effect 2026-07-01; the statutory 2024 editions govern by operation of Utah Code regardless, but Bountiful's own summary sheet is stale on this point — call (801) 298-6125 to confirm practical enforcement if this matters for a specific project; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unaffected by the 7/1/2026 statute revision, continues in force; Bountiful Design Criteria, rev. Oct 13, 2025; NOTE: Effective July 1, 2026 (now in force) — 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC (residential provisions) replaced the 2021 editions per Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027; text independently re-verified live at le.utah.gov 2026-07-16). The 2021 IRC and 2023 NEC were unaffected and remain in force.. Local amendments apply — see the Bountiful overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bountiful building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.